Resolve load current-path issue with verified board22 broader source pour; preserve remaining thermal and service gates
Add narrated retrospective copper/access review clip with separate captions and current board-21 status
Record board-20 copper candidate and bounded sensor service-access diagnostics without claiming acceptance
Update remaining acceptance work after issue-fix releases
Document supplier review and corrected thermal clip with separate captions
Withdraw stale revision-specific probing claims and document exact-input rerun
Document verified mount courtyards and fuse clearance; keep sensor and thermal work open
Publish input-bound R11 prototype bundle and completed CLI clearance review
Publish assumption-based R11 assembly study, locked firmware and new review footage
Record sent supplier requests and documented Q1 interface screening
Document verified R11 model and video checks, AIFlow rules fix, and explicit supplier/review dependencies
Publish compact v5 electrical checks and six captioned progression review scenes; cooling acceptance remains open
Publish compact v5 probe-driven placement and explicit incomplete cooling screen
Start compact R11 AIFlow revision; preserve Board34 and record initial fit and fan-control findings
Record completed AIFlow design delivery and link checked prototype package
Deliver Board34 R10 prototype review, current simulator twin and 4m34s narrated process cut
Board34 R10 nominal cooling and probe-clearance verification; refreshed prototype assets and native export checks
Record Board34 passive clearance studies and distinguish unscored simulation observations
Bind R9 hardware audit and record separate passive cooling feasibility studies
Add 4:21 narrated Board34 R9 review draft with captions and current thermal limits
Board34 R9: connected side-fan carrier, full modeled probing pass, current evidence and narrated clips
Synchronize Board34 project hero datasheet and R6 clearance review
Track overnight board completion, native DFT repair and viewer performance evidence
Record side-fan review clip and remaining prototype acceptance work
Review cooling stack tolerance sensitivity and prototype spacer selection
Board32 finish and export evidence, selected cooling assembly review and mechanical BOM
Catch larger-cooler contact gap and record revised spacer attachment study
Record confirmed copper, narrated review and passing candidate package thermal screen
Record confirmed finished copper and current design-phase scope
Verify published guard clip and record remaining thermal dependencies
Add corrected fan guard, lifted mount clearance study and reviewed process clip
Document unchanged-limit thermal margin and concrete physical qualification dependencies
Publish carrier inspection checkpoint and explicit passive cooler cost assumptions
Fix control session reconnect and document manufacturer cooler and carrier studies
Continue larger cooler assembly with plugged-connector and rerouted fan-wire checks
Record pending cooling-envelope decision without completing engineering gates
Record temperature shutdown replay and screen an offset passive cooling alternative
Require a qualified case-temperature bound in firmware and control panel
Document silkscreen export warning isolation and prepare narrated results review
Prepare measured cooling review and publish Board32 results clip
Correct thermal review image URL and current runtime provenance link
Advance Board32 through current acceptance and retain unresolved thermal gate
Revalidate Board32 libraries and preserve reviewed scaffold interface contract
Refresh Board32 control-panel twin and record component visual reviews
Adopt native-verified amplifier and comparator TI lands as Board32
Add reviewed native IC land-pattern clip and correct active review state
Verify current IC catalog lineage and resolve DGS manufacturer land patterns
Bind IC library reviews to Board31 and verify published component views
Update Board31 digital twin with verified fan state rendering
Bind output-locked temperature diagnostics to selected NTCLE428 sensor