Withdraw stale revision-specific probing claims and document exact-input rerun

John Lauer ·39a0c416dd · ·parent cd56993
2 files changed +18−1
docs/completion-plan.md+17
@@ -96,3 +96,20 @@ The task-local AIFlow binding fix is built and tested but not yet published or i `revisions/compact-r11/sensor-ph-review` is a separate, unadopted two-pin PH termination candidate. Native schematic parity passes288 pins/112 components. Native DRC cleanup and physical harness modeling remain in progress. Latest accepted run is still board-7.  AIFlow stale remoteBoard fix: owner issue50, direct source74796cfe on immutable0.1.97 basec61d9beb; workspace tests, production check/build, contextual preflight and real positive/negative binding checks passed. Registry/global runtime unchanged. Avoid concurrent state-changing CLI calls on the same run; a stage transition can overwrite a long verification outcome loaded earlier. Re-ran placement during its active visit to retain correct evidence.++## Current-density and package-path continuation, 16 October++AIFlow board-11 is current-repair-r5 plus two tiny native-landed5V_AUX links. Pour verification includes H1/H2/H3 washer and Q1 driver keepouts, without replacing zones. Outline rounding found no changes required. Current remains failed; no finish/thermal pass exists.++The rectangular-pad branch-screen defect is fixed in shared source96ef829d009c21097c83486e1ecd25e2f6226eba, ownerissue63, with24 tests passing. Actual R5 DUT_POS now screens pass3.96°C track rise and47.45A/mm² barrel density. Filled-copper Fields remains mandatory. Global installed release availability is separate.++R5 and R4 pass all six stricter nominal probing stages including tether handling and jaw checks. R6 native DRC0/0, but DUT_FUSED74A/mm² still fails. R7 shifts/widens that elbow, native DRC0/0; fresh Fields is running. R6 package cooling is exploratory: Q1+49.55°C still,+12.75°C assumed airflow at5.5W. Still-air35°C budget fails; physical and spatial-heatsink qualification remain open. See q1-package-cooling-review-2026-10-16.md.++A21-second narrated R6 thermal-review clip is rendered remotely on arav-rog, with separate captions. Prior accidental local automatic take was rejected, removed from the clip index, archived remotely and its local raw copies removed. Wrapper now disables automatic focus/capture and raw clip publishing; explicit remote narrated capture remains available.+++## Correction: stale probing paths discovered, 16 October++R4/R5/R7 recheck scripts hashed their intended new models but the copied probing state still selected the older fan-connector-clearance native board and GLB; the plan.board reference was older still. Those revision-specific probing passes are withdrawn. Current/DRC results are unaffected. R7 is now main AIFlow board-12 and its current gate passes, but its probing acceptance is pending a corrected rerun. The checker now resolves and compares actual state.board/state.glb/plan.board/release SHA before any command, and watches both display and plain models. Shared CLI identity checks and browser obstacle export are being tested. Historical generated reports remain as evidence of the defect, not acceptance.++The R6 thermal video's budget annotation is corrected from the general35°C board budget to the stricter Q1-specific15°C budget. Predicted rises remain49.55°C still and12.75°C moving; neither input nor acceptance limits changed.
docs/remote-service-clips.md+1−1
@@ -1,6 +1,6 @@ # Latest: current-path repair -18-second narrated R5/R7 native-route comparison. The fused-supply elbow shifts and widens without entering the washer keepout. The0.1mm Fields peak drops69.78→59.72A/mm²; the limit remains60 and the small0.47% margin is disclosed. Native DRC0/0 and six nominal probing stages pass. Thermal and physical qualification remain open.+18-second narrated R5/R7 native-route comparison. The fused-supply elbow shifts and widens without entering the washer keepout. The0.1mm Fields peak drops69.78→59.72A/mm²; the limit remains60 and the small0.47% margin is disclosed. Native DRC0/0 and current screening pass. The revision-specific probing pass was withdrawn after copied input paths were found stale; a corrected rerun is pending. Thermal and physical qualification remain open.  ::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.vtt"}