Clarify Q1-specific15C rise requirement versus35C general board budget

John Lauer ·cd56993bef · ·parent f9f293a
1 file changed +2−2
docs/q1-package-cooling-review-2026-10-16.md+2−2
@@ -12,7 +12,7 @@ This is a coupled PCB field plus lumped package model. It does **not** resolve t - Q1 junction-to-case0.42K/W; assumed interface0.7K/W. - Assumed sink-to-air8K/W still,1.2K/W moving. The moving value represents a catalog ducted-airflow scenario, not measured installed fan performance. - Three lead-to-board links each100K/W, explicitly assumed.-- Ambient-relative rises below; add actual ambient for temperature. Preserve35°C rise budget,5W bring-up cap and output lock.+- Ambient-relative rises below; add actual ambient for temperature. Preserve the Q1-specific15°C rise budget (the general board budget is35°C),5W bring-up cap and output lock.  | Node | Still-air rise | Assumed-airflow rise | |---|---:|---:|@@ -22,7 +22,7 @@ This is a coupled PCB field plus lumped package model. It does **not** resolve t | D1 board screening node | 30.20°C | 21.50°C | | RSH1 board screening node | 14.90°C | 7.50°C | -Q1 exceeds the35°C rise budget in still air. Active cooling looks promising under these assumptions; no fan-off continuous-power pass is recorded. The result does not establish fault-shutdown timing, tach reliability, sensor lag, contact pressure or safe operating area. Those checks remain required.+Q1 exceeds its15°C rise budget in still air. Active cooling looks promising under these assumptions; no fan-off continuous-power pass is recorded. The result does not establish fault-shutdown timing, tach reliability, sensor lag, contact pressure or safe operating area. Those checks remain required.  The separate R6 DUT_FUSED current screen still fails at approximately74A/mm² against60. R7 changes the elbow geometry and requires its own native/current/thermal/probing evidence. This R6 review cannot qualify R7.