README.md+1−1
@@ -4,7 +4,7 @@  **Watch how we built it — 4:35 narrated design progression from R10 through the current R11/R7 assembly.** [Video details and chapters](/adom/adom-custom-electronic-load/files/docs/compact-r11/process-progression.md) · [Download MP4](/adom/adom-custom-electronic-load/render/videos/latest-progression/electronic-load-latest.mp4). -**Latest issue repairs (28 October):** [Verified releases, remaining board gates and a 33-second narrated walkthrough](docs/issue-repairs-20261028/README.md). AIFlow 0.2.26 and PCBWay 0.1.1 are published. Board-20 is DRC-clean but failed its current screen at 128.3 A/mm²; the better board-19 geometry (65.9 A/mm²) is the baseline for the next repair. The limit remains 60 A/mm²; the hero below remains the earlier assembly review model.+**Latest issue repairs (28 October):** [Verified releases, remaining board gates and a 33-second narrated walkthrough](docs/issue-repairs-20261028/README.md). AIFlow 0.2.26 and PCBWay 0.1.1 are published. Board-21 is DRC-clean and undergoing full current verification after a promising coarse diagnostic. Board-20 was rejected at 128.3 A/mm²; the limit remains 60 A/mm²; the hero below remains the earlier assembly review model.  **Compact R11 prototype review:** [72 × 72 mm revision, native checks, cooling selection and remaining gates](docs/compact-r11/README.md). The film distinguishes earlier R10 work from approved R11 review scenes; the lead 3D viewer now shows the latest adopted compact R11/R7 assembly (AIFlow board-12), including its revised mounting and harness geometry. This is a prototype review model, not a manufacturing release. 
docs/completion-plan.md+2
@@ -140,3 +140,5 @@ The active run has adopted board-17 after electronic-load issue #1: a continuous ### 28 October: active board-20 verification  Board-19 full unchanged-spec 0.1 mm solve failed SHUNT_P at 65.887283 A/mm² (limit 60). Board-20 removes only the redundant 2 mm B.Cu source stub, retains the wider pour and parallel feed, and passed native KiCad checks under the existing project context. Full fine-grid solve is running. Required mechanical and wiring reviews remain unresolved; the six current hero conductors pass identity and connected-surface screens only. No manufacturing release or physical qualification.++Board-20 full result: failed at 128.342041 A/mm². Board-21 extends the existing stub instead, from the board-19 baseline; native DRC clean, source-only coarse result 58.515766 A/mm². Full unchanged-spec fine-grid verification running.
docs/issue-repairs-20261028/README.md+9−3
@@ -5,13 +5,13 @@ Work remains in progress. No fabrication, purchase or physical qualification is | Item | Verified progress | Remaining work | |---|---|---| | JLCPCB #2 | Shared clearance generator and 2/4/6-layer profiles now cover all copper. Native 0.09 mm pad-gap fixture fails the 0.10 mm rule as intended. Issue closed. | Broader 3rdPartyFab profile work is separate. |-| Electronic-load #1 | Adopted board-20 passes native KiCad DRC: zero errors, warnings and opens, with exact project rules and restored libraries. All six conservative copper screens pass. | Board-18 failed the full-spec 0.1 mm SHUNT_P screen at 72.7733 A/mm². Board-19 also fails at 65.8873 A/mm². Removing the stub in board-20 worsened the peak to 128.3 A/mm²; that candidate is rejected and board-19 geometry is the next repair baseline. |+| Electronic-load #1 | Adopted board-21 passes native KiCad DRC: zero errors, warnings and opens, with exact project rules and restored libraries. All six conservative copper screens pass. | Board-18 failed the full-spec 0.1 mm SHUNT_P screen at 72.7733 A/mm². Board-19 also fails at 65.8873 A/mm². Removing the stub in board-20 worsened the peak to 128.3 A/mm²; that candidate is rejected and board-19 geometry is the next repair baseline. | | AIFlow #60 | AIFlow 0.2.26 published, downloadable and installed. Geometry reports bind to the active board, request, report and STEP hashes; stale inputs are rejected. 496 workspace tests pass, nine existing tests ignored. | Actual board assembly review, wiring findings, standalone Mechanical/Wiring page releases. | | PCBWay page | Public MIT app 0.1.1, source, approved hero, Linux release, installed binary and discovery verified. Real page inspected in Pup on arav-rog. | No new vendor quote or purchase was submitted during these repairs. |  ## Board evidence -The active run is `aiflow/compact-r11`, board-20. Board-19 remains the preceding failed electrical checkpoint. Its native verification uses the matching `.kicad_pro`, `.kicad_dru`, footprint table and libraries. Earlier warning reports from incomplete validation context are superseded, not waived. The three missing library footprints were recovered from the prior project revision.+The active run is `aiflow/compact-r11`, board-21. Board-20 is a rejected candidate; board-21 starts from the better board-19 geometry and extends the source stub into the wider pour. Its source-only 0.2 mm diagnostic is 58.5158 A/mm², but full-spec 0.1 mm verification is still running. Its native verification uses the matching `.kicad_pro`, `.kicad_dru`, footprint table and libraries. Earlier warning reports from incomplete validation context are superseded, not waived. The three missing library footprints were recovered from the prior project revision.  LOAD_POS U4.8 is represented as a sense terminal (0 A) for the conductor-capacity screen; its original nominal 28.916 µA input bias remains recorded in the saved spec and amendment notes. The 3 A design load, 60 A/mm² current limit and 10°C copper-rise budget are unchanged. No peak acknowledgment or acceptance waiver has been used. @@ -51,4 +51,10 @@ Native KiCad exported the board and its referenced component models without miss  This diagnostic still omits the fan, fan harness, scaffold, hand and sensor-lug extraction sequence. Tool dimensions remain provisional. The raw report deliberately remains failed until a defensible complete service sequence is represented; intended-contact exclusions are documented, not hidden. -The wiring linter now also rejects duplicate physical IDs across different harnesses, duplicate harness IDs and unsupported schema versions. Five unit tests pass; local binary installed, updated source archive published. Standalone registry release remains pending.+The wiring linter now also rejects duplicate physical IDs across different harnesses, duplicate harness IDs and unsupported schema versions. Six unit tests pass; local binary installed, updated source archive published. Standalone registry release remains pending.++## Follow-up repair-review clip++::adom-video{src="/adom/adom-custom-electronic-load/render/docs/issue-repairs-20261028/copper-review-video/review.video.json"}++[Watch/download the 26-second copper and access review](copper-review-video/review.mp4). Retrospective wiki walkthrough, captured and encoded on arav-rog; Adom TTS narration, separate captions, no burned text. Shows the failed candidate honestly. It is not original CAD-edit footage and is pending review for the final film.
docs/issue-repairs-20261028/adom-aiflow-wiring-review-source.tar.gz
⋯ 1 unchanged line ⋯
docs/issue-repairs-20261028/copper-review-video/captions.srtadded+48
@@ -0,0 +1,48 @@+1+00:00:00,000 --> 00:00:01,640+Not every repair is an improvement.++2+00:00:02,420 --> 00:00:04,640+Removing this copper stub made the+simulated++3+00:00:04,640 --> 00:00:07,580+current concentration worse, so we+rejected that++4+00:00:07,580 --> 00:00:09,840+candidate and preserved the failed result.++5+00:00:10,420 --> 00:00:12,960+Extending the connection instead passes+the coarse++6+00:00:12,960 --> 00:00:15,420+diagnostic, but still needs the full+check.++7+00:00:16,160 --> 00:00:18,580+The mechanical review also distinguishes a+clear++8+00:00:18,580 --> 00:00:20,820+board access hole from a complete service++9+00:00:20,820 --> 00:00:21,260+path.++10+00:00:21,260 --> 00:00:24,120+This is a review walkthrough, not footage++11+00:00:24,120 --> 00:00:25,520+of the original CAD edits.
docs/issue-repairs-20261028/copper-review-video/captions.vttadded+39
@@ -0,0 +1,39 @@+WEBVTT++00:00:00.000 --> 00:00:01.640+Not every repair is an improvement.++00:00:02.420 --> 00:00:04.640+Removing this copper stub made the+simulated++00:00:04.640 --> 00:00:07.580+current concentration worse, so we+rejected that++00:00:07.580 --> 00:00:09.840+candidate and preserved the failed result.++00:00:10.420 --> 00:00:12.960+Extending the connection instead passes+the coarse++00:00:12.960 --> 00:00:15.420+diagnostic, but still needs the full+check.++00:00:16.160 --> 00:00:18.580+The mechanical review also distinguishes a+clear++00:00:18.580 --> 00:00:20.820+board access hole from a complete service++00:00:20.820 --> 00:00:21.260+path.++00:00:21.260 --> 00:00:24.120+This is a review walkthrough, not footage++00:00:24.120 --> 00:00:25.520+of the original CAD edits.
docs/issue-repairs-20261028/copper-review-video/evidence.jsonadded+34
@@ -0,0 +1,34 @@+{+  "type": "retrospective wiki review, not live CAD edits",+  "captureHost": "arav-rog",+  "rawPath": "C:/Users/arav/AppData/Local/Temp/adom-bridge-recordings/window-42338716-20261028-154216.mp4",+  "audio": "Adom TTS en-US-AndrewNeural",+  "burnedCaptions": false,+  "captions": "11 separate ASR-aligned cues; coarse and CAD corrected against narration script",+  "editing": "Trim first 1 second, use 26.184 seconds of narration, scale to 1600 pixels wide, 30 fps. Temporary bottom whitespace was added for framing and restored afterward. No engineering page text changed during capture.",+  "sha256": "3b9457109d87b1e8e69bd1b164badeeb630a2c477e7da46f4204b0fc10bcd791",+  "probe": {+    "programs": [],+    "streams": [+      {+        "codec_name": "h264",+        "width": 1600,+        "height": 956+      },+      {+        "codec_name": "aac"+      }+    ],+    "format": {+      "duration": "26.200000"+    }+  },+  "fullDecodePassed": true,+  "sampledFramesSeconds": [+    3,+    18,+    24+  ],+  "silenceCheck": "No gaps >=0.6 seconds at -38 dB",+  "approvedForFinalFilm": false+}
docs/issue-repairs-20261028/copper-review-video/review.mp4added
⋯ 1 unchanged line ⋯
docs/issue-repairs-20261028/copper-review-video/review.video.jsonadded+15
@@ -0,0 +1,15 @@+{+  "video": "/adom/adom-custom-electronic-load/render/docs/issue-repairs-20261028/copper-review-video/review.mp4",+  "title": "Rejected copper candidate and service-access findings \u2014 retrospective review",+  "captions": "WEBVTT\n\n00:00:00.000 --> 00:00:01.640\nNot every repair is an improvement.\n\n00:00:02.420 --> 00:00:04.640\nRemoving this copper stub made the\nsimulated\n\n00:00:04.640 --> 00:00:07.580\ncurrent concentration worse, so we\nrejected that\n\n00:00:07.580 --> 00:00:09.840\ncandidate and preserved the failed result.\n\n00:00:10.420 --> 00:00:12.960\nExtending the connection instead passes\nthe coarse\n\n00:00:12.960 --> 00:00:15.420\ndiagnostic, but still needs the full\ncheck.\n\n00:00:16.160 --> 00:00:18.580\nThe mechanical review also distinguishes a\nclear\n\n00:00:18.580 --> 00:00:20.820\nboard access hole from a complete service\n\n00:00:20.820 --> 00:00:21.260\npath.\n\n00:00:21.260 --> 00:00:24.120\nThis is a review walkthrough, not footage\n\n00:00:24.120 --> 00:00:25.520\nof the original CAD edits.\n",+  "chapters": [+    {+      "t": 0,+      "title": "Rejected copper change"+    },+    {+      "t": 14,+      "title": "Service-access findings"+    }+  ]+}
docs/issue-repairs-20261028/copper-review-video/word-timings.jsonadded+337
@@ -0,0 +1,337 @@+[+  {+    "start": 0.0,+    "end": 0.24,+    "word": "Not"+  },+  {+    "start": 0.24,+    "end": 0.52,+    "word": "every"+  },+  {+    "start": 0.52,+    "end": 0.88,+    "word": "repair"+  },+  {+    "start": 0.88,+    "end": 1.24,+    "word": "is"+  },+  {+    "start": 1.24,+    "end": 1.34,+    "word": "an"+  },+  {+    "start": 1.34,+    "end": 1.64,+    "word": "improvement."+  },+  {+    "start": 2.42,+    "end": 2.72,+    "word": "Removing"+  },+  {+    "start": 2.72,+    "end": 2.96,+    "word": "this"+  },+  {+    "start": 2.96,+    "end": 3.2,+    "word": "copper"+  },+  {+    "start": 3.2,+    "end": 3.6,+    "word": "stub"+  },+  {+    "start": 3.6,+    "end": 3.96,+    "word": "made"+  },+  {+    "start": 3.96,+    "end": 4.16,+    "word": "the"+  },+  {+    "start": 4.16,+    "end": 4.64,+    "word": "simulated"+  },+  {+    "start": 4.64,+    "end": 5.0,+    "word": "current"+  },+  {+    "start": 5.0,+    "end": 5.58,+    "word": "concentration"+  },+  {+    "start": 5.58,+    "end": 6.18,+    "word": "worse,"+  },+  {+    "start": 6.7,+    "end": 6.82,+    "word": "so"+  },+  {+    "start": 6.82,+    "end": 6.94,+    "word": "we"+  },+  {+    "start": 6.94,+    "end": 7.24,+    "word": "rejected"+  },+  {+    "start": 7.24,+    "end": 7.58,+    "word": "that"+  },+  {+    "start": 7.58,+    "end": 7.98,+    "word": "candidate"+  },+  {+    "start": 7.98,+    "end": 8.54,+    "word": "and"+  },+  {+    "start": 8.54,+    "end": 8.78,+    "word": "preserved"+  },+  {+    "start": 8.78,+    "end": 9.2,+    "word": "the"+  },+  {+    "start": 9.2,+    "end": 9.44,+    "word": "failed"+  },+  {+    "start": 9.44,+    "end": 9.84,+    "word": "result."+  },+  {+    "start": 10.42,+    "end": 10.76,+    "word": "Extending"+  },+  {+    "start": 10.76,+    "end": 10.98,+    "word": "the"+  },+  {+    "start": 10.98,+    "end": 11.32,+    "word": "connection"+  },+  {+    "start": 11.32,+    "end": 11.88,+    "word": "instead"+  },+  {+    "start": 11.88,+    "end": 12.46,+    "word": "passes"+  },+  {+    "start": 12.46,+    "end": 12.7,+    "word": "the"+  },+  {+    "start": 12.7,+    "end": 12.96,+    "word": "coarse"+  },+  {+    "start": 12.96,+    "end": 13.22,+    "word": "diagnostic,"+  },+  {+    "start": 14.08,+    "end": 14.2,+    "word": "but"+  },+  {+    "start": 14.2,+    "end": 14.42,+    "word": "still"+  },+  {+    "start": 14.42,+    "end": 14.72,+    "word": "needs"+  },+  {+    "start": 14.72,+    "end": 14.92,+    "word": "the"+  },+  {+    "start": 14.92,+    "end": 15.14,+    "word": "full"+  },+  {+    "start": 15.14,+    "end": 15.42,+    "word": "check."+  },+  {+    "start": 16.16,+    "end": 16.22,+    "word": "The"+  },+  {+    "start": 16.22,+    "end": 16.5,+    "word": "mechanical"+  },+  {+    "start": 16.5,+    "end": 16.94,+    "word": "review"+  },+  {+    "start": 16.94,+    "end": 17.5,+    "word": "also"+  },+  {+    "start": 17.5,+    "end": 18.04,+    "word": "distinguishes"+  },+  {+    "start": 18.04,+    "end": 18.3,+    "word": "a"+  },+  {+    "start": 18.3,+    "end": 18.58,+    "word": "clear"+  },+  {+    "start": 18.58,+    "end": 18.82,+    "word": "board"+  },+  {+    "start": 18.82,+    "end": 19.28,+    "word": "access"+  },+  {+    "start": 19.28,+    "end": 19.7,+    "word": "hole"+  },+  {+    "start": 19.7,+    "end": 20.12,+    "word": "from"+  },+  {+    "start": 20.12,+    "end": 20.24,+    "word": "a"+  },+  {+    "start": 20.24,+    "end": 20.52,+    "word": "complete"+  },+  {+    "start": 20.52,+    "end": 20.82,+    "word": "service"+  },+  {+    "start": 20.82,+    "end": 21.26,+    "word": "path."+  },+  {+    "start": 21.26,+    "end": 22.0,+    "word": "This"+  },+  {+    "start": 22.0,+    "end": 22.14,+    "word": "is"+  },+  {+    "start": 22.14,+    "end": 22.26,+    "word": "a"+  },+  {+    "start": 22.26,+    "end": 22.54,+    "word": "review"+  },+  {+    "start": 22.54,+    "end": 23.2,+    "word": "walkthrough,"+  },+  {+    "start": 23.56,+    "end": 23.78,+    "word": "not"+  },+  {+    "start": 23.78,+    "end": 24.12,+    "word": "footage"+  },+  {+    "start": 24.12,+    "end": 24.36,+    "word": "of"+  },+  {+    "start": 24.36,+    "end": 24.46,+    "word": "the"+  },+  {+    "start": 24.46,+    "end": 24.76,+    "word": "original"+  },+  {+    "start": 24.76,+    "end": 25.26,+    "word": "CAD"+  },+  {+    "start": 25.26,+    "end": 25.52,+    "word": "edits."+  }+]