← Commit history

Document verified mount courtyards and fuse clearance; keep sensor and thermal work open

John Lauer ·3df39d43ad · ·parent bf58485
3 files changed +47−2
docs/completion-plan.md+37
@@ -59,3 +59,40 @@ The current assembly has zero native-board solid intersections and zero unclassi The new18-second assembly clip is published separately for review. The4:09 main film and its selectable captions are published and visibly verified. Supplier replies and hardware measurements remain qualification dependencies, not blockers to the completed assumption-based studies. Original thermal/finish/delivery gates remain open.  Final nominal CLI checkpoint: all six checks pass (access, stack, compile, collide, margins, coverage). Coverage has20 items:19OK, one near landing atTP14 for L1, zero missing/proposed. Full workcell/browser equivalence remains open and is not marked complete. The prototype ZIP is hash-verified; see its manifest.+++## Current: direct PCB bracket correction, 15 October++The perimeter carrier is superseded by `revisions/compact-r11/assembly-correction/compact-bracket-v6-candidate.kicad_pcb` and `v6-review.glb`. Three M3 mounts attach directly to FR4; the bracket supports the revised ATS sink and fan. Q1 has a specified M3x0.5 custom tap and enlarged driver access. J9/J11/C6/D1 moves require rerouting. Mechanical checks and fastener stack are in `DIRECT-BRACKET.md`; the current native DRC is not passing. Earlier assembly collision, probe replay, thermal and finished-board evidence do not apply to this revision. No production release or uprating is claimed.++## User-prompted probing/sensor review, 15 October++The v6 silk candidate has 115 visible 0.8 mm reference fields and 115 visible 0.3 mm values; native silk/text DRC is clear. Electrical DRC still has 100 violations and 10 opens. The omitted Vishay NTC body is restored against the heatsink underside near Q1; adhesive, full wire route and JST GH termination remain unqualified. AIFlow Probing was restarted against the new anchored assembly: J7 grounding fails with 10 pincer collision episodes and 6 tether snags. MP1 grounding is being evaluated separately; no old v5 acceptance is reused. User prompting and raw recording are documented in docs/user-prompted-review-20261015.md and videos/compact-r11/user-prompted-correction-v6/.++## Mounting redesign reopened by user++Replace independent ear/bracket mounting stacks with two coaxial FR4-through mounts at the heatsink ears, using height-setting supports. Remove redundant central mounting point. User identified internal hardware interference; earlier board-only intersection reports do not constitute full-assembly clearance. Do not fabricate the v6 bracket. Sensor selection is now NTCALUG01T103G400A with short leads; termination tolerance and exact routing remain under review.++## Current V8: third fan-support bolt, 15 October++User identified the unsupported side of the fan flange. V8 adds H3 at native (160,92) with an M3x16 through-FR4 bolt and a connected height support. The two heatsink ear bolts remain. Full native STEP board collision check finds no unintended support/hardware/component intersections; real openings are verified for H1/H2/H3 and Q1. Sensor mating-envelope fit remains unqualified. Existing Pup viewer now shows V8, and an actual assembly reveal was recorded without burned captions. Fresh patched CLI probing passes head/tether collision and landing margins; no prior revision pass is reused. Native electrical DRC is running; routing and qualification gates remain open. See revisions/compact-r11/fan-support-v8/README.md.++## V8 electrical recovery checkpoint++The V8 working candidate now has no native ground-connectivity findings, shorts, clearance or silkscreen violations. Twelve opens remain (USB pair, fused power path, isolated LOAD_POS branch), plus ten dangling tracks and one dangling via. This supersedes earlier V8 counts only; it is not board acceptance. Nine old rectifier thermal vias are being relocated in a separate, unaccepted power-routing experiment; the working candidate retains its checked copper. The 25.1-second mounting/underside review is published.++AIFlow still binds its earlier board-5 snapshot until V8 satisfies the adoption DRC gate. A model-resolution check on that snapshot is historical, not V8 proof. Do not reuse its route/current status as V8 acceptance. V8 needs adoption, model/test-plan/placement revalidation, then all subsequent engineering gates.++## V8 adopted electrical checkpoint — 15 October++AIFlow board-6 now contains the native-filled V8 working board. Native DRC has zero violations and zero unconnected items; the 2466-item net-intent map survived native fill/save/reload. Nine rectifier thermal vias were relocated and U10 moved beside USB-C, requiring new current, thermal and assembled-probe checks. `fan-support-v8/native-binding.log` records byte-matched desktop board and rule sidecars. The fresh model check covers 115 footprints (95 modeled, 20 intentionally model-free), and all 18 board-level test measurements have landing points. These checks do not qualify assembled probe access or thermal performance. Native placement verification is in progress.++The task-local AIFlow binding fix is built and tested but not yet published or installed for other users. The older board-5 model result is superseded. Sensor harness termination, USB signal review, physical cooling/preload validation and final delivery remain open.++## Current adopted board-7: mounting clearance++`fan-support-v8/mount-clearance-review/v8-mount-clearance-filled.kicad_pcb` is adopted, bound to the matching desktop files, and passes native DRC, 2468-item net-intent preservation, 115-part model resolution and native placement verification. H1/H2/H3 now have both-face washer courtyards; F1 moved1mm away and DUT_POS was rerouted. Updated assembly GLB is in the same directory and loaded in the existing Pup viewer. Fresh nominal probing has passed collide/margins; coverage remains running. Do not reuse board-6 solve hashes.++`revisions/compact-r11/sensor-ph-review` is a separate, unadopted two-pin PH termination candidate. Native schematic parity passes288 pins/112 components. Native DRC cleanup and physical harness modeling remain in progress. Latest accepted run is still board-7.++AIFlow stale remoteBoard fix: owner issue50, direct source74796cfe on immutable0.1.97 basec61d9beb; workspace tests, production check/build, contextual preflight and real positive/negative binding checks passed. Registry/global runtime unchanged. Avoid concurrent state-changing CLI calls on the same run; a stage transition can overwrite a long verification outcome loaded earlier. Re-ran placement during its active visit to retain correct evidence.
revisions/compact-r11/fan-support-v8/README.md+10−2
@@ -2,7 +2,7 @@  ::adom-video{src="/adom/adom-custom-electronic-load/render/videos/compact-r11/v8-electrical-checkpoint/review.video.json"} -[Download latest electrical-checkpoint assembly GLB](electrical-review/v8-review.glb) · [Mechanical STEP](v8-mechanics.step)+[Download latest electrical-checkpoint assembly GLB](mount-clearance-review/v8-review.glb) · [Mechanical STEP](v8-mechanics.step)  John identified the unsupported side of the fan bracket in his annotated screenshot. This revision adds a third PCB mounting point specifically to support that side of the fan, while retaining the two heatsink ear mounts. It does not restore the old perimeter bracket. @@ -20,8 +20,16 @@ Manufacturer fan STEP solids were also transformed to the exact displayed placem  The electrical checkpoint is now adopted as AIFlow board-6: native DRC reports zero violations and zero unconnected items. The updated viewer includes U10 relocated beside USB-C and the new copper/silkscreen export. The desktop PCB and rule sidecars are byte-matched to the adopted snapshot. Model resolution passes for all 115 footprints (95 with models, 20 intentionally without); all 18 planned measurements have electrical landing points. -Fresh assembled replay on this exact GLB reports zero head collisions and zero tether snags; landing margins pass. Final coverage is still running. Live placement verification encountered a native DRC timeout and is being retried; a separate full-flag saved-board DRC completed cleanly. These results are separate gates, not interchangeable.+Fresh assembled replay on this exact GLB reports zero head collisions and zero tether snags; landing margins pass. Coverage also passes: the full six-check nominal replay completed on the input-hashed model. Live placement verification completed after a timeout retry and identified missing H1/H2/H3 assembly courtyards. A separate candidate adds those envelopes; native DRC is running. A separate full-flag saved-board DRC completed cleanly. These results are separate gates, not interchangeable.  The new 25.2-second clip above shows this actual electrical checkpoint, including progressive cooler hiding and underside hardware. It is silent review footage without burned captions.  Pending: live placement completion, new current/thermal and USB signal reviews, sensor termination fit, full assembly/tool access, scaffold underside hardware clearance and material/preload/strength qualification. No fabrication acceptance or wattage increase is claimed.++## Mounting-clearance refinement++AIFlow board-7 adds actual front/back washer courtyards for H1/H2/H3. Their native placement check found F1 too close; F1 is now 1 mm farther from H1 and its power path is rerouted. Native DRC remains zero violations/zero opens, and all 115 native placements pass. Native refill preserved 2468 net assignments. The current assembly download above includes this refinement. The 25.2-second clip predates this fuse shift and remains a review of the earlier electrical checkpoint.++A separate, unadopted sensor candidate replaces J10 with two-pin JST PH to accommodate the full insulation-diameter tolerance of the lug sensor leads. Its 288 connected pins match the 112-component native schematic; remaining silkscreen and assembly/harness checks are in progress. Current and thermal gates remain open.++The stale-native-board model-check defect is documented at [AIFlow issue 50](https://wiki.adom.inc/adom/adom-aiflow/issues/50). Its tested source fix is published, not yet a shared package release.
revisions/compact-r11/fan-support-v8/mount-clearance-review/v8-review.glbadded
⋯ 1 unchanged line ⋯