← Commit history
Record sent supplier requests and documented Q1 interface screening
5 files changed
+53−3
docs/completion-plan.md+1−1@@ -36,4 +36,4 @@ Task-local AIFlow runner: `tools/aiflow-r11`. Source fixes for explicit native r ## Latest handoff dependencies -[Concrete remaining data, requests and review status](../revisions/compact-r11/evidence/remaining-dependencies.md). The AIFlow rules-check recording bug is fixed in source commit 542a3c34 and verified on this run without changing the rule file. No thermal or final-delivery gate is marked passed. Supplier-message authorization and six-scene user review are pending.+[Concrete remaining data, requests and review status](../revisions/compact-r11/evidence/remaining-dependencies.md). The AIFlow rules-check recording bug is fixed in source commit 542a3c34 and verified on this run without changing the rule file. No thermal or final-delivery gate is marked passed. Supplier requests were sent with authorization on 14 October; technical replies and six-scene user review are pending.
revisions/compact-r11/evidence/interface-screen.jsonadded+29@@ -0,0 +1,29 @@+{+ "method": "Series resistance screen, 5.5 W all through case; ignores parallel PCB paths; catalog conditions not installed acceptance",+ "rows": [+ {+ "interface": "Earlier assumption (unverified)",+ "interfaceKPerW": 0.7,+ "sinkScenarioKPerW": 1.2,+ "junctionRiseC": 12.76,+ "budgetC": 15,+ "qualified": false+ },+ {+ "interface": "TSP 1600 at 50 psi",+ "interfaceKPerW": 2.45,+ "sinkScenarioKPerW": 1.2,+ "junctionRiseC": 22.385,+ "budgetC": 15,+ "qualified": false+ },+ {+ "interface": "TSP 3500 at 50 psi",+ "interfaceKPerW": 2.02,+ "sinkScenarioKPerW": 1.2,+ "junctionRiseC": 20.02,+ "budgetC": 15,+ "qualified": false+ }+ ]+}
revisions/compact-r11/evidence/remaining-dependencies.md+3−1@@ -8,7 +8,7 @@ The 72 x 72 mm v5 board passes native DRC (0 errors, warnings and opens), schema - **Thermal path:** v5 was re-solved with an explicitly hypothetical external package path. It demonstrates the modeling issue, but the interface and installed airflow are not bounded. The passive case still exceeds the original budget. No limit was relaxed, no nominal catalog flow was declared installed, and no fan-failure measurement was invented. Exact interface data, installed boundary conditions and shutdown characterization are needed for acceptance; the later physical workcell is outside this thread's present scope. - **PWM behavior:** the exact fan datasheet specifies signal amplitude but does not supply frequency, minimum duty or zero-duty behavior. The other fan family's data was rejected as non-transferable. The isolated image compiles and requests full cooling, with load output locked off. Variable PWM implementation/qualification waits for the exact input contract. -[Supplier requests](../sourcing/supplier-message-drafts.md) are written with public technical-support recipients. Sending them is awaiting explicit user authorization. No message has been sent. Supplier replies or verified equivalent drawings/specifications would permit the next mechanical/control iteration. The [fixture procedure](../cooling-fixture-procedure.md) defines later measurements without pretending they happened.+[Supplier requests](../sourcing/supplier-message-drafts.md) are written with public technical-support recipients. Both requests were sent on 14 October 2026 after explicit user authorization. Gmail confirms SENT; technical replies remain pending. Supplier replies or verified equivalent drawings/specifications would permit the next mechanical/control iteration. The [fixture procedure](../cooling-fixture-procedure.md) defines later measurements without pretending they happened. ## Video review @@ -19,3 +19,5 @@ Six narrated/captioned review scenes are published and decode at beginning, midd AIFlow rules-check evidence fix: source commit 542a3c3410b7323590c5bacd11f2b15064454eb5, based on latest 65c0692e. Production check/build, 173 workspace tests, rules/continuation/artifact/widget CLI regressions passed. Applied to this run through an isolated binary; no registry or shared runtime replacement. The probe collision checker repair remains owner PR #3, not a deployed shared release. The historical supervisor remains paused. No new supervisor, purchase, hardware flash, manufacturing release or YouTube upload was created.++[New interface screen](../sourcing/interface-review.md): documented TO-220 pad performance does not validate the earlier 0.7 K/W assumption. No thermal gate was relaxed.
revisions/compact-r11/sourcing/interface-review.mdadded+17@@ -0,0 +1,17 @@+# Q1 interface review — 14 October 2026++The earlier 0.7 K/W interface remains an assumption. Two documented compliant insulating pads do not support that value in their manufacturer TO-220 tests.++| Candidate | TO-220 interface at 50 psi | Junction rise at 5.5 W, assuming 1.2 K/W sink |+|---|---:|---:|+| Earlier assumed interface | 0.70 K/W | 12.76 C |+| Henkel TSP 1600 | 2.45 K/W | 22.39 C |+| Henkel TSP 3500, 0.010 inch | 2.02 K/W | 20.02 C |++Calculation: 5.5 × (0.42 + interface + 1.2). This is a series-path screen, not Fields simulation or measured assembly performance. It neglects parallel heat through the PCB. Manufacturer TO-220 test values depend on pressure, surface and specimen; they are not guaranteed for this Q1 clamp. The 1.2 K/W sink scenario is also unqualified for our installed airflow.++Neither pad can be accepted from this screen against the unchanged 15 C rise budget. Do not interpret area-normalized C-in²/W as C/W, or use material conductivity alone as complete joint resistance. Do not increase clamp pressure without checking Q1 and sink mechanical limits. A ceramic insulating interface with controlled thin contact layers remains a candidate, not a selected qualified part.++Sources: [TSP 1600 manufacturer TDS](https://datasheets.tdx.henkel.com/BERGQUIST-SIL-PAD-TSP-1600-en_GL.pdf), [TSP 3500 manufacturer TDS](https://datasheets.tdx.henkel.com/BERGQUIST-SIL-PAD-TSP-3500-en_GL.pdf).++Next dependency: verified sink geometry and clamp conditions, exact insulating interface, installed airflow, then complete thermal and mechanical revalidation. Supplier requests were sent with user authorization; no purchase or fabrication release.
revisions/compact-r11/sourcing/supplier-message-drafts.md+3−1@@ -1,4 +1,6 @@-# Supplier data requests — ready to review, not sent+# Supplier data requests — sent 14 October 2026++Sent from [email protected] to the listed recipients after explicit user authorization; Gmail returned SENT for both. Supplier receipt and technical answers are not yet confirmed. These two messages request part data only. No pricing commitment, purchase, proprietary fabrication process or user credentials are included.