☰
Record current-board thermal failure without substituting PCB-only results for the cooling assembly
Resolve load current-path issue with verified board22 broader source pour; preserve remaining thermal and service gates
aiflow run compact-outline-candidate-codex-astra-20261013-2322: thermal
Record rejected board-21 fine result and verified review-video playback; preserve open gates
Add narrated retrospective copper/access review clip with separate captions and current board-21 status
aiflow run compact-outline-candidate-codex-astra-20261013-2322: current
Publish failed board-20 full fine-grid evidence and keep current-limit gate intact
Document intended-contact limits and complete-assembly requirements for service sweeps
Keep project lead status aligned with current board-20 verification
Preserve exact geometry and request inputs behind service-access diagnostics
Record board-20 copper candidate and bounded sensor service-access diagnostics without claiming acceptance
Preserve wiring inventory, sensor supplier evidence and cross-harness duplicate regression source
Publish board-19 copper repair candidate and require unresolved assembly reviews
aiflow run compact-outline-candidate-codex-astra-20261013-2322: current
Link current repair review from project and improve caption grouping
Add narrated remote-captured repair walkthrough with separate captions
Update remaining acceptance work after issue-fix releases
Record verified software releases and remaining board acceptance failures
Update mechanical review source with tested STEP sweep adapter
Record finer-grid current failure and preserve unaccepted source-taper experiment
Publish review-only copper repair board with unchanged acceptance limits; current qualification remains open
Restore three project footprints and verify native board-17 DRC with matching rules and libraries
Preserve tested PCBWay RFQ application source pending standalone page publication
Record issue repair evidence, published fixes and remaining qualification gaps
Share tested companion review tool sources; no geometry qualification or registry release claimed
Add linked component thumbnails to quote BOM with explicit replacement labels
Correct reference and MPN columns in quoted BOM table
Show itemized quoted BOM costs with separate fees
Track authorized PCBWay registration awaiting CAPTCHA; default workflow to visible Hydrogen webview
Document PCBWay comparison scope and pending account login; no full quote yet
Prepare five-board PCBWay comparison RFQ; preserve unresolved login and manufacturing checks
Recover JLC access, correct J10 quote BOM, and retain placement review gate
Clarify quote status and record remote narrated upload draft
Prepare five-board JLC SMT quote alternatives and native package; record upload success and unresolved sign-in/rotation…
Complete live stock evidence for matched JLC parts; record three shortages
Add conservative JLC sourcing audit, isolated silk candidate and narrated wiki clip provenance
Document five-board JLC quote scope, manual Q1 and complete warning audit
Plan honest Hydrogen workflow film with user corrections and probe-driven redesign
Reconcile current R7 status, 3rdPartyFab stack, operating limits and component costs
Lead project page and meeting film with updated current-assembly cut
Update design film with current R7 assembly closing sequence
Restore native silkscreen and enable gentle rotor animation in separate display hero
Promote current compact R11 R7 assembly to the lead project 3D model
Show reduced Q1 FR4 and heatsink conductive heat-flow animation with explicit limits
Add narrated Q1 FR4 and heatsink flow review
Publish completed supplier-informed solve with explicit Q1 limit and Fields defect handoff
Bound the larger passive cooler alternative by actual catalog dimensions
Document supplier review and corrected thermal clip with separate captions
Add narrated corrected Q1 contact thermal review
Correct supplier cooling assumptions and local Q1 contact thermal study