main
John Lauer Board34 R10 nominal cooling and probe-clearance verification; refreshed prototype assets and native export checks 5460526

Electronic load status — Board34 / R9

Updated 13 October 2026. Not released for fabrication. Board34 is the current two-layer electrical design; R9 is the current nominal side-fan cooling assembly. The earlier Board32 finish/export and passive-cooler thermal result do not apply to this revision.

  • Electrical: native DRC zero electrical violations and zero opens; all 107 references and 276 connected pins match the schematic. Exact-input current screen passes. The 72 × 104 mm PCB has large corner pins, edge USB-C and routed TP14/15/16.
  • Mechanical screen: one connected carrier solid; no unexpected fitted-body intersections and no intersections in the checked fastener/support set. M4 fan hardware and revised clamp ears clear. This is nominal geometry, not print, machining, preload or retention qualification.
  • Probing: R9 report passes 221.5 simulated seconds, 20 touches, 14,528 head poses and 721 tether solves with zero collisions and zero snags. Wire-on-heatsink rest is reported and still needs physical wear review. One simulator on port 4896 shows R9.
  • Thermal: failed/open. No side-fan cooling credit is accepted. The 5 W operating target, 5.5 W guard, 40 °C ambient and 55 °C case ceiling are unchanged. Installed airflow, source spreading, contact resistance and sensor margin remain unresolved.
  • Firmware and measurements: output-locked bring-up image and host safety tests exist; no flashing or physical calibration. The probing route demonstrates access and fan motion, not complete electrical functional acceptance or measured telemetry.
  • Tools: one AIFlow SSE dashboard on 8893. AIFlow source corrections are directly published. Probing fan/full-cooling changes are draft PR2, stacked on the existing scaffold PR1; not merged or installed globally.
  • Video: new native R9 carrier and simulated fan startup/shutdown clips are recorded. TTS succeeded for a narrated carrier review. The updated 4:21 narrated review cut is assembled; human editorial review and final brand treatment remain open. Historical clips retain revision labels.

Completion plan · Cooling review · Engineering datasheet · Cost limitations · Build clips.

No fabrication, purchase, flashing or YouTube publication has occurred. Archived Board32 status is historical evidence only.

13 October follow-up: isolated passive-heatsink envelope studies found two placements that clear the complete probe route, including one retaining the nominal Q1 contact footprint. The supplied-parameter thermal calculation passes nominally but has insufficient demonstrated margin under changed convection/contact assumptions; no thermal acceptance or assembly adoption follows. The AlN supplier page has a documented 20/25 mm dimension conflict. See feasibility evidence and interface review.

The probing simulator now reports three synthetic startup rail checks and 17 unscored observations correctly. A generated value without an expected band is not a passing measurement or circuit prediction. Current simulated report.