ae78bc0
Larger-cooler assembly candidate
This isolated study continues the 125319 passive-cooling alternative without changing Board32, the BOM, operating limits or thermal acceptance. The current sink and fan cannot simply be swapped: the existing fan and three leads intersect the larger conservative sink envelope.
The revised envelope spans board coordinates (112.5,19.5,7.25) to (188.5984,95.7,58.05) mm. All91 fitted component bounds clear a0.5mm margin, and all13 bare-pad probe approaches clear a2mm radius. The plugged GH sensor housing has0.75mm nominal clearance. The fan plug has0.95mm clearance after applying its stated housing dimension tolerances; this does not include assembly-position tolerances.
The proposed fan sits20.05mm higher, leaving4mm between its bottom and the sink envelope. Its top is82.05mm above PCB top copper. This gap is a geometric choice, not a validated airflow plenum. A new support and guard are required; the MOSFET leads must not support the cooler.
Three nominal1.2mm-diameter lead routes have lengths72.00,76.50 and82.35mm. Provisional blanks85,90 and95mm include an assumed10mm preparation/service allowance. Exact modeled intersections with the sink, fitted component bounds, sensor, other wires and rotor swept volume are zero. Sampled bend radii are4.56,3.58 and3.23mm; no manufacturer minimum bend radius or physical strain-relief qualification is claimed. Preserve factory leads until actual assembly validation.
The transparent sink and PCB-outline GLB intentionally omit detailed fins and PCB components. Existing nominal fan animation is retained; no measured RPM is supplied. This is an assembly clearance aid, not the final digital twin.
- Input-bound assembly report
- New harness report
- Original clearance STEP
- Original nominal harness STEP
- Illustrative GLB
- Inspection clip
- Reproduce envelope audit
- Reproduce harness study
J11 programming-plug access, tolerances, carrier strength, final workcell envelope and installed thermal performance remain open. The envelope excluding cables and supports is90.60×82.50mm in plan; cables extend farther. No manufacture or thermal pass follows from these checks.
Manufacturer extrusion follow-up
The manufacturer product page links a shared125319/125320/125321 STEP. Its one valid solid measures76.0984×50.8×304.8mm, matching12-inch125319 stock. A local76.2mm cut remains one valid solid and registers to the same board envelope. Its volume95,453mm³ implies about258g at an assumed aluminum density2700kg/m³. This reinforces the need for an independent structural load path.
The catalog gives a7.112mm base and1.5K/W natural-convection value for a3-inch specimen; the product page lists1.522K/W. Using the latter with the unchanged5.5W,40°C ambient and assumed0.52731K/W interface gives51.27°C case temperature. That conditional calculation is not accepted installed performance: source spreading, surface finish, mounting orientation and fan obstruction remain unknown.
Model report records the source URL/hash and local transform. Vendor CAD and its cut derivative remain local because redistribution permission is not established. The original public clearance/harness assets do not contain that vendor model. The old carrier STEP includes structural members, an obsolete sink envelope and a nominal fan; its per-solid overlap sum must not be described as structural interference volume alone.
Carrier first pass
An original16-member support layout clears all91 fitted PCB bodies,13 probe approaches, nominal sensor and rerouted fan leads. Three seats support the sink independently of Q1 leads; proposed M3×8 retention envelopes clear those modeled obstacles. They assume2mm seats,6mm thread engagement and1.112mm nominal tip reserve in the7.112mm sink base. The NBK screw reference supports the nominal5.5mm head diameter and3mm head height used for clearance; no exact purchase part is selected.
This remains a load-path layout, not a manufacturable carrier. The0.8mm PCB-clamp jaws, material, joints, retention torque and vibration behavior are unqualified. Its loads transfer to the PCB and scaffold; they do not vanish. The left underside retention screw is above the PCB, so installation/service sequence or alternate top-access retention must be resolved. The assembled workcell must not be inferred to have screwdriver access merely because the seated screw clears.
Carrier report · Original carrier STEP · Original carrier preview · Reproduce.
Top-access revision
The later variant moves the retention axes to(118.98,45),(182.09,52) and(182.09,86.168)mm, at measured fin-channel centers. Three nominal M3×12 screws enter from above through proposed3.2mm base bores and seat into recessed nuts fitted before PCB installation. The overhead carrier ring/arms have6.2mm access openings. Nuts are recessed, not captive.
All91 fitted component bounds,13 probe approaches, modeled sensor/wires and the nominal fan envelope clear the revised carrier, seated fasteners and5.5mm-diameter straight head/tool approaches. Exact local manufacturer CAD checks show zero stock-fin intersection at the revised axes. The earlier off-center positions intersected the fins and remain rejected in the evidence. No fin relief is needed by the centered nominal check. The three base bores remove171.59mm³ in the local proposed machining model; stock manufacturer CAD is unchanged.
This resolves the nominal tool-path problem, not tolerances, tool selection, nut retention, clamp strength, fabrication, cost or installed thermal performance. Top-access report · Fin check · Original carrier STEP · Original preview.
# Larger-cooler assembly candidate
This isolated study continues the 125319 passive-cooling alternative without changing Board32, the BOM, operating limits or thermal acceptance. The current sink and fan cannot simply be swapped: the existing fan and three leads intersect the larger conservative sink envelope.
The revised envelope spans board coordinates `(112.5,19.5,7.25)` to `(188.5984,95.7,58.05)` mm. All91 fitted component bounds clear a0.5mm margin, and all13 bare-pad probe approaches clear a2mm radius. The plugged GH sensor housing has0.75mm nominal clearance. The fan plug has0.95mm clearance after applying its stated housing dimension tolerances; this does not include assembly-position tolerances.
The proposed fan sits20.05mm higher, leaving4mm between its bottom and the sink envelope. Its top is82.05mm above PCB top copper. This gap is a geometric choice, not a validated airflow plenum. A new support and guard are required; the MOSFET leads must not support the cooler.
Three nominal1.2mm-diameter lead routes have lengths72.00,76.50 and82.35mm. Provisional blanks85,90 and95mm include an assumed10mm preparation/service allowance. Exact modeled intersections with the sink, fitted component bounds, sensor, other wires and rotor swept volume are zero. Sampled bend radii are4.56,3.58 and3.23mm; no manufacturer minimum bend radius or physical strain-relief qualification is claimed. Preserve factory leads until actual assembly validation.
The transparent sink and PCB-outline GLB intentionally omit detailed fins and PCB components. Existing nominal fan animation is retained; no measured RPM is supplied. This is an assembly clearance aid, not the final digital twin.
- [Input-bound assembly report](review.json)
- [New harness report](harness-review.json)
- [Original clearance STEP](clearance-study.step)
- [Original nominal harness STEP](raised-fan-candidate.step)
- [Illustrative GLB](raised-fan-candidate.glb)
- [Inspection clip](../../videos/passive-assembly/inspection.mp4)
- [Reproduce envelope audit](../../tools/check_passive_assembly.py)
- [Reproduce harness study](../../tools/build_passive_fan_harness.py)
J11 programming-plug access, tolerances, carrier strength, final workcell envelope and installed thermal performance remain open. The envelope excluding cables and supports is90.60×82.50mm in plan; cables extend farther. No manufacture or thermal pass follows from these checks.
## Manufacturer extrusion follow-up
The [manufacturer product page](https://wakefieldthermal.com/wakefield-thermal-3x12-in-extrusion-9099-125319/) links a shared125319/125320/125321 STEP. Its one valid solid measures76.0984×50.8×304.8mm, matching12-inch125319 stock. A local76.2mm cut remains one valid solid and registers to the same board envelope. Its volume95,453mm³ implies about258g at an assumed aluminum density2700kg/m³. This reinforces the need for an independent structural load path.
The catalog gives a7.112mm base and1.5K/W natural-convection value for a3-inch specimen; the product page lists1.522K/W. Using the latter with the unchanged5.5W,40°C ambient and assumed0.52731K/W interface gives51.27°C case temperature. That conditional calculation is not accepted installed performance: source spreading, surface finish, mounting orientation and fan obstruction remain unknown.
[Model report](vendor-model-review.json) records the source URL/hash and local transform. Vendor CAD and its cut derivative remain local because redistribution permission is not established. The original public clearance/harness assets do not contain that vendor model. The old carrier STEP includes structural members, an obsolete sink envelope and a nominal fan; its per-solid overlap sum must not be described as structural interference volume alone.
## Carrier first pass
An original16-member support layout clears all91 fitted PCB bodies,13 probe approaches, nominal sensor and rerouted fan leads. Three seats support the sink independently of Q1 leads; proposed M3×8 retention envelopes clear those modeled obstacles. They assume2mm seats,6mm thread engagement and1.112mm nominal tip reserve in the7.112mm sink base. The [NBK screw reference](https://www.nbk1560.com/images/en-US/product/technical_data/rokkaku_bolt_NBK/rokkaku_bolt_NBK_1.pdf) supports the nominal5.5mm head diameter and3mm head height used for clearance; no exact purchase part is selected.
This remains a load-path layout, not a manufacturable carrier. The0.8mm PCB-clamp jaws, material, joints, retention torque and vibration behavior are unqualified. Its loads transfer to the PCB and scaffold; they do not vanish. The left underside retention screw is above the PCB, so installation/service sequence or alternate top-access retention must be resolved. The assembled workcell must not be inferred to have screwdriver access merely because the seated screw clears.
[Carrier report](carrier-review.json) · [Original carrier STEP](carrier-candidate.step) · [Original carrier preview](carrier-candidate.glb) · [Reproduce](../../tools/screen_passive_carrier.py).
## Top-access revision
The later variant moves the retention axes to(118.98,45),(182.09,52) and(182.09,86.168)mm, at measured fin-channel centers. Three nominal M3×12 screws enter from above through proposed3.2mm base bores and seat into recessed nuts fitted before PCB installation. The overhead carrier ring/arms have6.2mm access openings. Nuts are recessed, **not captive**.
All91 fitted component bounds,13 probe approaches, modeled sensor/wires and the nominal fan envelope clear the revised carrier, seated fasteners and5.5mm-diameter straight head/tool approaches. Exact local manufacturer CAD checks show zero stock-fin intersection at the revised axes. The earlier off-center positions intersected the fins and remain rejected in the evidence. No fin relief is needed by the centered nominal check. The three base bores remove171.59mm³ in the local proposed machining model; stock manufacturer CAD is unchanged.
This resolves the nominal tool-path problem, not tolerances, tool selection, nut retention, clamp strength, fabrication, cost or installed thermal performance. [Top-access report](carrier-top-access-review.json) · [Fin check](top-access-fin-review.json) · [Original carrier STEP](carrier-top-access-candidate.step) · [Original preview](carrier-top-access-candidate.glb).