main
John Lauer
Verify top-access cooler mount and reconcile current BOM with internal inventory pricing
ae78bc0
{
"status": "nominal-support-layout-not-adopted",
"boardSha256": "ea37ce6db20bae331bf41b6638fe9149a17c484e01bc2a0d7fd34917203b7fc3",
"partCount": 16,
"fittedBodyCount": 91,
"probeCount": 13,
"conflicts": [],
"retentionHolesXYmm": [
[
118.98,
45
],
[
182.09,
52
],
[
182.09,
86.168
]
],
"retentionFastenerProposal": "Three nominalM3x12 top-entry screws through sink base and seats into recessed nuts; proposed6.2mm overhead access holes.",
"fastenerConflicts": [],
"limitations": [
"Independent of Q1 leads but still transfers cooler loads to PCB edge clamps; PCB/scaffold loading is not qualified.",
"Old0.8mm clamp-jaw assumption remains unqualified; do not print or fabricate this study.",
"Retention envelopes are not sourced fasteners or manufactured threads; machining access, thread-depth tolerances, torque, locking and pullout require validation.",
"Candidate includes fan screw clearance holes only, no approved screw/nut stack.",
"Nominal touching seats are intentional; tolerance and thermal expansion are excluded.",
"Carrier self-contact is not a validated manufactured joint; topology, materials and load tests remain required.",
"Nuts are recessed, not captive. Fit them before PCB installation; nut retention and service removal remain unqualified.",
"Exact vendor-fin clearance and machined sink holes require a separate check; the generic solid sink envelope is excluded from the tool sweep."
],
"toolApproachConflicts": []
}