main
History Download
Drew Owens Fix contralateral leg-frame and torso-shell CAD bug, regenerate single-solid STLs/GLB/Bambu/MJCF/USD/clearance, and ali… 9a64946

Microgoose build timeline

Active build time (9h 23m total: 7h 19m Phase 1 + 2h 03m Phase 2) is computed as the union of continuous execution intervals across all seven gemini-4-carbon agent transcripts and background EDA, slicer, and GPU jobs, collapsing any global inactivity gap over 20 minutes with zero agent steps or running tools into a thin axis break (//).

Microgoose Project Build and Validation Timeline

Back to Microgoose Overview | Active-time data & generator: active_timeline_data.json, build_headline_timeline.py, microgoose_build_timeline.html | Raw audit: timeline_audit.json | AI Flow log: AI Flow Run Ledger

Every timestamp on this page is extracted directly from the Google Antigravity conversation transcripts, adom-aiflow step telemetry, drew2/microgoose git commit metadata, and subsystem output artifacts, converted to US Central Time (CST, UTC-6) relative to Drew's initial build prompt (T0 = Nov 11, 2026, 1:34:15 PM CST / 2026-11-11T19:34:15Z).

Executive Summary: Active & Wall-Clock Totals from Initial Prompt (T0)

End-to-End Milestone Completion Time (CST, UTC-6) Active Build Time Wall-Clock from T0 Notes
Initial Microgoose Prompt (T0) Nov 11, 1:34:15 PM CST +0m 00s +0m 00s Open-source 15-DoF biped + microgoose-spine PCB + 7-stage GTC RL stack requested
Prompt to First Wiki Commit (v0.1.0 scaffold) Nov 11, 1:53:45 PM CST +19m 30s +19m 30s Commit d619a0c1e6 creating drew2/microgoose
Prompt to AI Flow Intake / Circuit Design Start Nov 11, 2:00:48 PM CST +26m 33s +26m 33s step intake at +26m 33s; step design at +29m 38s (2:03:53 PM CST)
Prompt to Stage 6 Firmware + 50 Hz goosectl Runtime Nov 11, 2:30:09 PM CST +55m 54s +55m 54s 344/344 C11 checks pass; final 0.30 mOhm R20 lock at +1h 43m 27s
Prompt to First Project Page Publish (Revision 1) Nov 11, 2:37:40 PM CST +1h 03m 25s +1h 03m 25s Commit 2a24eb61aa (chosen parts, BOM table, KiCad PCM metadata)
Prompt to Stage 1 CUDA PPO Policy (2.02M steps) Nov 11, 2:43:16 PM CST +1h 09m 01s +1h 09m 01s 7m 23.5s (443.49 s) RTX 4090 GPU wall-clock; Policy Arena 87.06/100 at +1h 18m 10s
Prompt to 15-DoF CAD (23 parts) + Bambu .3mf Slice Nov 11, 4:41:14 PM CST +3h 06m 59s +3h 06m 59s 3-plate H2D slice (427.86 g, 16h 38m); routed PCB STEP re-bind at +6h 25m 31s active
Prompt to Electronics Rev A DRC/ERC Clean (board-9) Nov 12, 2:54:27 PM CST +5h 45m 18s +25h 20m 12s 1,029 tracks, 172 vias, 0 DRC, 0 ERC (7h 02m AI Flow active tool/model time)
Prompt to AI Flow finish + finish-guard Pass Nov 12, 4:13:00 PM CST +7h 03m 51s +26h 38m 45s Live DRC/ERC 0 errors (3:44:16 PM CST), 120 s build film, finish-guard exit 0
Prompt to Phase 1 Full-Stack Wiki Delivery (v0.1.0) Nov 12, 4:16:32 PM CST +7h 07m 23s +26h 42m 17s Commits e8432493df & e614ae8487 (32/32 integration checks; live 3D signoff +7h 19m 22s active)
Phase 2 Dual-Engine Sim, FEA, SPICE & Org Skillpack Nov 13, 3:45:26 PM CST +9h 22m 45s +50h 11m 11s All 7 Phase 2 deliverables & adom/robot-sim-skillpack (Adom internal) Done

Compute, Models & Multi-Agent Execution Summary

  • Workstation & Hardware: A Windows laptop with an RTX 4090 Laptop GPU (16 GB VRAM) running WSL2 (Ubuntu 24.04). Headless EDA, 3D solid modeling, and print slicing ran against KiCad 10 IPC/CLI, ngspice-42, adom-fields, OpenCascade (OCCT / CadQuery), and Bambu Studio (Bambu Lab H2D, 0.4 mm nozzle).
  • GPU Locomotion Training Totals (training_metrics.json):
    • Phase 1 Stage 1 CUDA PPO (Nov 11): 2,016,000 environment steps (350 PPO updates x 160 vectorized BAM environments) in 443.49 s (7m 23.5s, 0.12319 GPU-hours) on NVIDIA GeForce RTX 4090 Laptop GPU.
    • Phase 2 Stage 2/3 Full-DR + Slope CUDA PPO (Nov 13): +1,024,000 environment steps (200 PPO updates x 160 environments, 20 workers, 2,616.0 mean steps/s, +-8.5 deg slopes, 6.0 V to 8.4 V battery OCV, 0 to 8 ms bus latency) in 391.44 s (6m 31.4s, 0.10873 GPU-hours).
    • Cumulative GPU RL Compute: 3,040,000 environment steps in 834.93 s (13m 54.9s total GPU wall-clock, 0.23192 GPU-hours).
  • AI Orchestration Topology: Google Antigravity running gemini-4-carbon across 1 Parent Coordinator, 5 parallel Phase 1 Specialist Subagents, and 1 Phase 2 Project Timeline Subagent. Across Phase 1 delivery (Nov 12, 4:12:28 PM CST), the 6 Phase 1 sessions executed 1,066 gemini-4-carbon model calls (12,302,530 fresh input tokens, 146,447,043 cached input tokens, and 1,576,232 output tokens).
Agent Role Session ID Model Active Window (CST, UTC-6) Steps Phase 1 Calls Output Tokens
Parent Coordinator (Architecture, Integration & Phase 2 Sim) d1adcf0c gemini-4-carbon Nov 11, 1:34:15 PM to Nov 13, 3:32:51 PM+ 1,026+ 176 203,711
RL & Sim-to-Real Engineer (BAM ID, CUDA PPO, ONNX, Arena) 1b3af51d gemini-4-carbon Nov 11, 2:02:19 PM to Nov 11, 4:45:06 PM 185 72 138,395
Firmware & Runtime Engineer (STM32G431 C11 + goosectl) ad29f6ce gemini-4-carbon Nov 11, 2:02:20 PM to Nov 11, 3:17:42 PM 209 66 191,613
Electronics AI-Flow Engineer (microgoose-spine Rev A) 9a5348f3 gemini-4-carbon Nov 11, 2:47:03 PM to Nov 12, 4:13:00 PM 1,361 557 555,312
Mechanical CAD & Slicing Engineer (15-DoF CAD + Bambu H2D) 28a27b8a gemini-4-carbon Nov 11, 2:47:04 PM to Nov 12, 3:34:40 PM 333 121 350,063
Integration, Datasheet & Validation Engineer (PDF + 32 Checks) 65c690b1 gemini-4-carbon Nov 11, 2:47:07 PM to Nov 12, 3:45:14 PM 259 74 137,138
Project Timeline Sub-Readme Author (Phase 2 Audit & Graphic) 1ee83341 gemini-4-carbon Nov 13, 2:35:55 PM to present 150+ n/a (Phase 2) n/a (Phase 2)

CUDA PPO locomotion training reward, survival rate, and velocity tracking curves RTX 4090 Laptop GPU PPO training curves (3.04M cumulative environment steps across 160 vectorized Microgoose environments).


Master Chronological Milestone Log (Phase 1 Build to Phase 2 Validation)

Milestone / What Happened Time (CST, UTC-6) Active Elapsed Wall-Clock from T0 Status Evidence Link
Initial user prompt (T0): Drew requests open-source 15-DoF Microgoose biped built end-to-end with AI Flow + 7-stage NVIDIA GTC sim-to-real RL stack Nov 11, 1:34:15 PM CST +0m 00s +0m 00s Done timeline_audit.json (d1adcf0c step 0)
First wiki page creation and initial commit (v0.1.0 component/project scaffold on drew2/microgoose) Nov 11, 1:53:45 PM CST +19m 30s +19m 30s Done page.json (commit d619a0c1e6)
AI Flow run initialized (intake -> rules -> design) + first 2 specialist subagents launched (RL & Sim-to-Real, Firmware & Runtime) Nov 11, 2:00:48 PM CST +26m 33s +26m 33s Done AI Flow Run Ledger
Stage 1 BAM XL330-M288-T actuator identification fitted (0.036 deg validation RMSE, armature + friction + 5 V bus droop) Nov 11, 2:08:40 PM CST +34m 25s +34m 25s Done fit_xl330.py, bam_xl330_fit.png
AI Flow design, test-plan, and sourcing completed (87 top-side SMT components under 2-layer 3rdPartyFab rules) Nov 11, 2:17:45 PM CST +43m 30s +43m 30s Done calcs.json, bom.csv (f6bd869faf)
Stage 6 initial STM32G431 C11 firmware (200 Hz DXL Sync R/W) + 50 Hz goosectl host runtime verified (344/344 checks) Nov 11, 2:30:09 PM CST +55m 54s +55m 54s Done firmware/README.md, runtime/README.md
Phase 1 Stage 3 CUDA PPO training launched on NVIDIA GeForce RTX 4090 Laptop GPU (2,016,000 steps across 160 parallel BAM envs) Nov 11, 2:34:50 PM CST +1h 00m 35s +1h 00m 35s Done train_ppo_cuda.py
Revision 1 drew2/microgoose project page published (chosen parts, component table, KiCad PCM metadata) Nov 11, 2:37:40 PM CST +1h 03m 25s +1h 03m 25s Done page.json (commit 2a24eb61aa)
Stage 1 CUDA PPO training finished (443.49 s, 0.12319 GPU-h) + self-contained policy.onnx exported (1.31e-6 max PyTorch diff) Nov 11, 2:43:16 PM CST +1h 09m 01s +1h 09m 01s Done policy.onnx, onnx_export_report.json
Drew prompts parallel subsystem scale-out (step 295); Coordinator launches Electronics AI-Flow, Mechanical CAD & Slicing, and Integration Validation subagents (step 297) Nov 11, 2:44:44 PM CST +1h 10m 29s +1h 10m 29s Done timeline_audit.json (d1adcf0c steps 295, 297)
Phase 1 7-Stage RL & Sim-to-Real stack complete (10.0 s CPU MuJoCo walk + +0.18 m/s push recovery + Policy Arena 87.06/100, 32/32 survival) Nov 11, 2:52:25 PM CST +1h 18m 10s +1h 18m 10s Done arena_scorecard.json, sim2sim_report.json
Cross-subsystem validator & 8-page vector datasheet v1 built; catches R20 0.30 mOhm (CSS2H-2512R-L300F) shunt scaling across firmware/board Nov 11, 3:13:45 PM CST +1h 39m 30s +1h 39m 30s Done Microgoose-Datasheet.pdf
Firmware & Runtime locked to finalized design/netlist.json pins and 0.30 mOhm INA226 CAL = 0x42AB (1 mA/LSB) Nov 11, 3:17:42 PM CST +1h 43m 27s +1h 43m 27s Done firmware/README.md
AI Flow schematic (0 ERC) and ngspice-42 simulation (58.6 deg PM, 212 mV 3.5 A gait step droop) completed Nov 11, 4:04:39 PM CST +2h 30m 24s +2h 30m 24s Done microgoose-spine.kicad_sch, simulation_results.json
Headless Bambu Studio 3-plate .3mf/STL slice completed (23 parts on Bambu Lab H2D: 427.86 g filament, 16h 38m total print time) Nov 11, 4:36:10 PM CST +3h 01m 55s +3h 01m 55s Done bambu_slice_report.json
Mechanical 15-DoF OCCT CAD (66 solids, 550.2 g), 6-bundle cable routing, OCCT collision check, and Hero GLB v1 delivered Nov 11, 4:41:14 PM CST +3h 06m 59s +3h 06m 59s Done build_microgoose_cad.py, kinematics_mass_props.json
RL MJCF/URDF updated with exact OCCT CAD per-link masses, CoMs, and inertias; CPU MuJoCo walk (1.55 m forward, 1.80 m straight-line) and microgoose-walk-sim2sim.mp4 re-verified Nov 11, 4:45:06 PM CST +3h 10m 51s +3h 10m 51s Done microgoose.xml, microgoose-walk-sim2sim.mp4
AI Flow components, models (87/87 Z-up), placement v2, and Day 1 routing pass finished (end of Active Segment 1) Nov 11, 5:07:32 PM CST +3h 33m 17s +3h 33m 17s Done AI Flow Run Ledger (3392b8d901)
Active Segment 2 started (status? prompt at 12:42:26 PM CST): Electronics AI-Flow resumed at routing (12:45:42 PM CST) Nov 12, 12:45:42 PM CST +3h 36m 33s +23h 11m 27s Done timeline_audit.json (d1adcf0c steps 364, 382)
AI Flow thermal-vias, pours, outline, current, thermal (+41.6 degC still air), fields, and nets completed Nov 12, 2:24:33 PM CST +5h 15m 24s +24h 50m 18s Done fields_thermal.png, current_density.png (f1a1919c1b)
Electronics microgoose-spine Rev A layout & silkscreen finalized (board-9.kicad_pcb: 1,029 tracks, 172 vias, 0 DRC, 0 ERC, 0 unconnected) Nov 12, 2:54:27 PM CST +5h 45m 18s +25h 20m 12s Done microgoose-spine.kicad_pcb, pcb_top_2d.png (9dbc5f4c32)
Electronics 3d GLB (microgoose-spine.glb) and export v1 (Gerbers, BOM, CPL, 38.6 MB microgoose-spine.step) completed Nov 12, 3:12:05 PM CST +6h 02m 56s +25h 37m 50s Done microgoose-spine.step, microgoose-spine.export.json (ff40cd12a9)
Mechanical assembly re-bound to routed microgoose-spine.step (0 collisions across 802 PCB solids & 2,145 pairs), Bambu 3-plate slice re-verified, Hero GLB refreshed Nov 12, 3:34:40 PM CST +6h 25m 31s +26h 00m 25s Done interference-report.json, microgoose-hero.glb
AI Flow finish gate passed (0 live KiCad DRC, 0 ERC, 0 unrouted) + full-stack integration gate passed (32/32 checks, 8-page PDF refreshed) Nov 12, 3:45:14 PM CST +6h 36m 05s +26h 10m 59s Done steps/24-finish/README.md, full_stack_report.json (0fe8b17e5e)
AI Flow deliver (120 s narrated microgoose-spine-build.mp4) and adom-aiflow finish-guard --json passed (exit 0, decision: complete) Nov 12, 4:13:00 PM CST +7h 03m 51s +26h 38m 45s Done microgoose-spine-build.mp4, steps/25-export/README.md (9f4fb89d30)
Phase 1 full-stack drew2/microgoose wiki publish (e8432493df & e614ae8487) + live 3D viewer, video, and datasheet browser verification complete Nov 12, 4:16:32 PM CST +7h 07m 23s +26h 42m 17s Done Microgoose Overview (commits e8432493df, e614ae8487; verified 4:28:31 PM CST)
Phase 2 sprint initiated (Active Segment 3): coupled electromechanical simulation, second-engine cross-check, mechanical/electrical validation, and org skillpack requested Nov 13, 1:42:03 PM CST +7h 19m 22s +48h 07m 48s Done timeline_audit.json (d1adcf0c step 615)
Phase 2 coupled XL330-M288-T + LMR33640 Spine bus-droop & thermal electromechanical model built (updated 3:01:00 PM CST) Nov 13, 1:53:55 PM CST +7h 31m 14s +48h 19m 40s Done xl330_electromech.py
Phase 2 Stage 2/3 full-DR + +-8.5 deg slope CUDA PPO fine-tuning (+1,024,000 steps in 391.44 s, 100% eval survival) & policy.onnx v2 exported Nov 13, 2:12:18 PM CST +7h 49m 37s +48h 38m 03s Done training_metrics.json, training_curves.png
Project Build and Validation Timeline sub-readme v1 published (68e9c182dd, e00dcd4171) Nov 13, 2:56:38 PM CST +8h 33m 57s +49h 22m 23s Done timeline/README.md
Phase 2 STEP C2/C3/MC2 copper geometry audit completed (711 manifold solids verified; 18 nm OCCT fillet tangent proven benign) Nov 13, 3:15:59 PM CST +8h 53m 18s +49h 41m 44s Done step_geometry_audit.json
Phase 2 dual-engine (MuJoCo 4.0.1 + MIT/TRI Drake 1.58.0) sim-to-sim cross-check completed across 8 locomotion & fall/get-up scenarios Nov 13, 3:24:39 PM CST +9h 01m 58s +49h 50m 24s Done sim2sim_cross_engine_report.json
Phase 2 mechanical validation completed (10-min walk 0 falls, 39.25 degC peak winding vs 75.0 degC limit, CoM/ZMP sweeps & 3D scikit-fem TetP1 FEA) Nov 13, 3:25:41 PM CST +9h 03m 00s +49h 51m 26s Done mechanical_validation_report.json
Phase 2 electrical validation (ngspice-42 400 kHz switching transients + adom-fields thermal/IR-drop) & Physical Test Plan completed Nov 13, 3:27:17 PM CST +9h 04m 36s +49h 53m 02s Done electrical_validation_report.json, PHYSICAL_TEST_PLAN.md
Phase 2 team simulation toolchain skillpack packaged (adom/robot-sim-skillpack, Adom internal) Nov 13, 3:45:26 PM CST +9h 22m 45s +50h 11m 11s Done adom/robot-sim-skillpack (Adom internal)
Full-RoM electronics, optical/RF FoV, and serviceability clearance audit completed (806 CAD mesh pairs; catches 3-piece contralateral leg-frame Workplane("XZ") -Y sign bug) Nov 13, 5:28:12 PM CST +10h 55m 21s +51h 53m 57s Done electronics_clearance_report.json, electronics_fov_rom_clearance.png
Native Isaac Lab 3.0 + Newton (MuJoCo-Warp) 16,384-env short training (80 iterations = 31.46M steps in 417.7 s) & 3-engine sim2sim cross-check completed Nov 15, 8:46:06 AM CST +11h 32m 12s +91h 11m 51s Done isaaclab_microgoose/, isaaclab_newton_short_validation.json
Contralateral 3-piece leg-frame & 2-piece torso-shell CAD bug fixed in build_microgoose_cad.py (23/23 single-solid STLs on their own leg, 0 OCCT collisions, 557.5 g mass, 416.5 g / 14h 35m Bambu slice, Hero GLB, MJCF/URDF/USD link inertias, and clearance checks regenerated) Nov 15, 9:27:05 AM CST +11h 52m 05s +91h 52m 50s Done build_microgoose_cad.py, microgoose-hero.glb, bambu_slice_report.json

Complete 25-Stage Electronics AI Flow Chronology (microgoose-spine Rev A)

The microgoose-spine Molecule controller (70.0 x 70.0 mm, 2-layer 3rdPartyFab top-side SMT rules, 87 components) progressed through every adom-aiflow verification gate from initial intake to finish-guard completion:

# AI Flow Stage & Outcome Start (CST, UTC-6) Finish (CST, UTC-6) Active at Finish Status Evidence Link
01 intake: Requirements & 15-DoF Spine Molecule brief captured Nov 11, 2:00:48 PM CST Nov 11, 2:02:42 PM CST +28m 27s Done design/brief.md (d619a0c1e6)
02 rules: Locked 2-layer 3rdPartyFab top-side SMT rule profile (70x70 mm Molecule) Nov 11, 2:02:42 PM CST Nov 11, 2:03:53 PM CST +29m 38s Done design/requirements.json (a702439070)
03 design: LMR33640 5 V 4 A buck, AP2114H 3.3 V LDO, INA226 0.30 mOhm shunt, STM32G431, BMI270 architecture Nov 11, 2:03:53 PM CST Nov 11, 2:09:48 PM CST +35m 33s Done design/calcs.json (f1e817b11d)
04 test-plan: Bring-up rail, ripple, DXL 1 Mbps bus, and IMU/ToF test criteria recorded Nov 11, 2:09:48 PM CST Nov 11, 2:16:28 PM CST +42m 13s Done design/calcs.json (b4e70f2949)
05 sourcing: Sourced 87 board components (all passives >= 0603, in-stock MPNs) Nov 11, 2:16:28 PM CST Nov 11, 2:17:45 PM CST +43m 30s Done design/bom.csv (f6bd869faf)
06 parts (v1-v2): Resolved Molecule corner pins MP1..MP4, edge contacts MC1..MC10, and IC CAD packages Nov 11, 2:17:45 PM CST Nov 11, 2:37:38 PM CST +1h 03m 23s Done design/bom.csv (5962bdd87d)
07 project-page (Rev 1): Published Revision 1 component table and KiCad PCM metadata to drew2/microgoose Nov 11, 2:18:27 PM CST Nov 11, 2:43:58 PM CST +1h 09m 43s Done page.json (2a24eb61aa)
08 libraries & library (v1-v2): Built project KiCad symbol and footprint tables with verified pad geometry Nov 11, 2:43:58 PM CST Nov 11, 3:07:59 PM CST +1h 33m 44s Done kicad/fp-lib-table (ab61ab88d3)
09 schematic (v1-v3): Generated microgoose-spine.kicad_sch with 0 ERC violations across all 87 symbols Nov 11, 2:53:47 PM CST Nov 11, 3:58:03 PM CST +2h 23m 48s Done kicad/microgoose-spine.kicad_sch (09313272c1)
10 simulation: ngspice-42 Bode stability (58.6 deg PM), 0.45 A to 3.5 A gait transient, and INA226 sense check Nov 11, 3:42:21 PM CST Nov 11, 4:04:39 PM CST +2h 30m 24s Done sim/simulation_results.json (5ac6408041)
11 components: Instantiated all 87 footprints on 70.0 x 70.0 mm 2-layer board Nov 11, 4:04:39 PM CST Nov 11, 4:13:00 PM CST +2h 38m 45s Done design/netlist.json (c40da61c07)
12 models: Bound and Z-up oriented 87/87 3D STEP/GLB component models Nov 11, 4:13:00 PM CST Nov 11, 4:18:31 PM CST +2h 44m 16s Done kicad/set_models.py (c2b40f91d1)
13 placement (v1-v2): Placed Molecule grid, centered BMI270, and tightened U1 SW hot-loop trace from 13.7 mm to ~6 mm Nov 11, 4:18:31 PM CST Nov 11, 4:49:09 PM CST +3h 14m 54s Done kicad/plan_placement.py (b41e09c2a9)
14a routing (v1 & Day 1): Initial 2-layer routing pass through end of Active Segment 1 Nov 11, 4:27:51 PM CST Nov 11, 5:07:32 PM CST +3h 33m 17s Done ...-claude-20261111-1934/README.md (3392b8d901)
14b routing (Day 2 -> board-9): Completed routing in Active Segment 2; final board-9 gated at 2:54:27 PM CST (1,029 tracks, 172 vias, 0 DRC) Nov 12, 12:45:42 PM CST Nov 12, 12:51:57 PM CST +3h 42m 48s Done kicad/microgoose-spine.kicad_pcb (8698bdb261)
15 thermal-vias: Stitched 9 thermal vias (0.30/0.60 mm) under LMR33640DDDAR exposed pad to top/bottom GND Nov 12, 12:51:57 PM CST Nov 12, 12:57:01 PM CST +3h 47m 52s Done kicad/microgoose-spine.kicad_pcb (eaf8c17c98)
16 pours (v1-v3): 57 copper pour groups achieving 78.96% F.Cu and 88.65% B.Cu coverage with 0 islands Nov 12, 12:57:01 PM CST Nov 12, 2:13:12 PM CST +5h 04m 03s Done screenshots/pcb_top_2d.png (f931702d37)
17 outline (v1-v3): 70.0 x 70.0 mm Edge.Cuts with 3.0 mm corner radii and 0 internal board cutouts Nov 12, 1:07:04 PM CST Nov 12, 2:17:23 PM CST +5h 08m 14s Done design/mechanical-interface.json (a170693083)
18 current (v1-v3): Laplace DC current-density field solve passed across VBAT, 5V_BUS, and R20 Kelvin paths Nov 12, 1:10:54 PM CST Nov 12, 2:21:34 PM CST +5h 12m 25s Done docs/analysis/current_density.png (f468d6da37)
19 thermal: Electro-thermal solve passed: +41.6 degC still air, +32.3 degC walking airflow (45.0 degC limit) Nov 12, 2:21:34 PM CST Nov 12, 2:22:40 PM CST +5h 13m 31s Done docs/analysis/fields_thermal.png (408c041c52)
20 fields: Full 3D adom-fields PDN, hot-loop EMC, and thermal review passed Nov 12, 2:22:40 PM CST Nov 12, 2:23:51 PM CST +5h 14m 42s Done docs/analysis/fields_thermal.png (d216e5d23d)
21 nets: Per-net copper pour connectivity and return-path walkthrough recorded Nov 12, 2:23:51 PM CST Nov 12, 2:24:33 PM CST +5h 15m 24s Done ...-claude-20261111-1934/README.md (f1a1919c1b)
22 silkscreen: Two-sided grouped functional silkscreen finalized on board-9.kicad_pcb (0 pad overlaps, 0 DRC) Nov 12, 2:24:33 PM CST Nov 12, 2:58:17 PM CST +5h 49m 08s Done screenshots/pcb_top_2d.png (9dbc5f4c32)
23 3d: Copper-accurate microgoose-spine.glb with laser-etched ICs and studio renders verified Nov 12, 2:58:17 PM CST Nov 12, 3:09:40 PM CST +6h 00m 31s Done docs/3d/microgoose-spine.glb (249173d85a)
24 export (v1): Exported Gerbers, drill, BOM, CPL, and 38.6 MB microgoose-spine.step (802 solids) Nov 12, 3:03:19 PM CST Nov 12, 3:12:05 PM CST +6h 02m 56s Done kicad/microgoose-spine.export.json (ff40cd12a9)
25 finish: Passed live KiCad 10 DRC (0 violations, 0 unconnected), ERC (0 violations), and finish-checks Nov 12, 3:12:05 PM CST Nov 12, 3:44:18 PM CST +6h 35m 09s Done steps/24-finish/README.md (0fe8b17e5e)
26 export (v2), deliver & finish-guard: Rendered 120 s narrated microgoose-spine-build.mp4, pushed run report, and passed finish-guard (exit 0) Nov 12, 3:44:18 PM CST Nov 12, 4:13:00 PM CST +7h 03m 51s Done steps/25-export/README.md (9f4fb89d30)

KiCad 10 routed 2-layer copper and grouped functional silkscreen on microgoose-spine rev A Final DRC-clean microgoose-spine rev A 2-layer layout (1,029 routed segments, 172 vias, 78.96% F.Cu, 88.65% B.Cu, 0 unconnected nets).

Adom Fields 3D electro-thermal temperature rise solve on microgoose-spine rev A 3D adom-fields electro-thermal verification (+41.6 degC peak rise in still air, +32.3 degC in walking airflow vs. 45.0 degC limit).


Wiki Publish & Git Commit History (drew2/microgoose)

Across Phase 1 and Phase 2 timeline updates, drew2/microgoose recorded 110 commits prior to this headline graphic push. Primary engineering and publication commits:

Commit Hash Time (CST, UTC-6) Active Elapsed Wall-Clock from T0 Status Published Milestone
d619a0c1e6 Nov 11, 1:53:45 PM CST +19m 30s +19m 30s Done Initial commit: component/microgoose (v0.1.0 page scaffold)
a702439070 Nov 11, 2:02:44 PM CST +28m 29s +28m 29s Done AI Flow rules: 2-layer 3rdPartyFab Molecule design rules
f1e817b11d Nov 11, 2:04:00 PM CST +29m 45s +29m 45s Done AI Flow design: power tree, MCU, IMU, and DXL bus calculations
f6bd869faf Nov 11, 2:16:35 PM CST +42m 20s +42m 20s Done AI Flow sourcing: 87-component BOM locked
2a24eb61aa Nov 11, 2:37:40 PM CST +1h 03m 25s +1h 03m 25s Done Revision 1 publish: chosen parts, component table, and KiCad PCM metadata
09313272c1 Nov 11, 3:42:21 PM CST +2h 08m 06s +2h 08m 06s Done AI Flow schematic step evidence (0 ERC)
5ac6408041 Nov 11, 4:04:39 PM CST +2h 30m 24s +2h 30m 24s Done AI Flow simulation step evidence (ngspice-42 loop & transient)
c2b40f91d1 Nov 11, 4:18:31 PM CST +2h 44m 16s +2h 44m 16s Done AI Flow models step evidence (87/87 3D models aligned)
b41e09c2a9 Nov 11, 4:49:10 PM CST +3h 14m 55s +3h 14m 55s Done AI Flow placement v2 step evidence (shortened SW loop)
8698bdb261 Nov 12, 12:51:57 PM CST +3h 42m 48s +23h 17m 42s Done AI Flow routing Day 2 step evidence
f931702d37 Nov 12, 2:13:11 PM CST +5h 04m 02s +24h 38m 56s Done AI Flow pours v3 step evidence (78.96% F.Cu, 88.65% B.Cu)
408c041c52 Nov 12, 2:22:40 PM CST +5h 13m 31s +24h 48m 25s Done AI Flow thermal step evidence (+41.6 degC still air)
d216e5d23d Nov 12, 2:23:51 PM CST +5h 14m 42s +24h 49m 36s Done AI Flow fields 3D electro-thermal & PDN step evidence
9dbc5f4c32 Nov 12, 2:58:16 PM CST +5h 49m 07s +25h 24m 01s Done AI Flow silkscreen step evidence (board-9.kicad_pcb, 0 DRC)
249173d85a Nov 12, 3:03:18 PM CST +5h 54m 09s +25h 29m 03s Done AI Flow 3d copper-accurate GLB step evidence
d8b5f4a290 Nov 12, 3:12:00 PM CST +6h 02m 51s +25h 37m 45s Done Fields, thermal, and layout design review for microgoose-spine rev A
ff40cd12a9 Nov 12, 3:12:04 PM CST +6h 02m 55s +25h 37m 49s Done AI Flow export v1 step evidence (Gerbers, BOM, CPL, STEP)
0fe8b17e5e Nov 12, 3:44:18 PM CST +6h 35m 09s +26h 10m 03s Done AI Flow finish step evidence (live DRC/ERC clean)
9f4fb89d30 Nov 12, 4:12:31 PM CST +7h 03m 22s +26h 38m 16s Done AI Flow final export & deliver (microgoose-spine-build.mp4 + run ledger)
e8432493df Nov 12, 4:16:01 PM CST +7h 06m 52s +26h 41m 46s Done Publish Microgoose Rev A full-stack hardware, CAD, datasheet, and 7-stage RL stack
e614ae8487 Nov 12, 4:16:32 PM CST +7h 07m 23s +26h 42m 17s Done Add KiCad 10 Spine PCB, STEP, Gerbers/BOM/CPL, and parametric mechanical CAD/STL/STEP
68e9c182dd Nov 13, 2:53:42 PM CST +8h 31m 01s +49h 19m 27s Done Add Project Build and Validation Timeline sub-readme and timestamp audit
e00dcd4171 Nov 13, 2:56:38 PM CST +8h 33m 57s +49h 22m 23s Done Surface Project Build and Validation Timeline in README TOC
215b5dad38 Nov 13, 5:45:09 PM CST +11h 12m 18s +52h 10m 54s Done Public-release metadata scrub across repo, datasheet PDF, and KiCad PCM archive
cdb9ed9463 Nov 13, 5:45:54 PM CST +11h 13m 03s +52h 11m 39s Done Flip drew2/microgoose visibility to public

Phase 2 Simulation & Design Validation Status (Nov 13, 2026)

Phase 2 started at Nov 13, 2026, 1:42:03 PM CST (+7h 19m 22s cumulative active time / +48h 07m 48s calendar time after T0) to cross-verify the Rev A design across two independent multibody physics engines and coupled electrical/mechanical solvers before physical fabrication:

Phase 2 Deliverable Time (CST, UTC-6) Elapsed in Phase 2 Active Elapsed Status Evidence Link
Coupled XL330 + LMR33640 Spine Electromechanical Model Nov 13, 1:53:55 PM CST +11m 52s +7h 31m 14s Done xl330_electromech.py (updated 3:01:00 PM CST)
Stage 2/3 Full-DR + +-8.5 deg Slope CUDA PPO & ONNX v2 Nov 13, 2:12:18 PM CST +30m 15s +7h 49m 37s Done training_metrics.json, policy.onnx
STEP C2/C3/MC2 Copper Geometry Audit (711 solids) Nov 13, 3:15:59 PM CST +1h 33m 56s +8h 53m 18s Done step_geometry_audit.json
Dual-Engine Cross-Check (MuJoCo 4.0.1 + MIT/TRI Drake 1.58.0) Nov 13, 3:24:39 PM CST +1h 42m 36s +9h 01m 58s Done sim2sim_cross_engine_report.json (8 scenarios)
Mechanical Validation (10-min Thermal, CoM/ZMP & 3D scikit-fem FEA) Nov 13, 3:25:41 PM CST +1h 43m 38s +9h 03m 00s Done mechanical_validation_report.json (0 falls, 39.25 degC peak)
Electrical Validation (ngspice-42 + adom-fields) & Test Plan Nov 13, 3:27:17 PM CST +1h 45m 14s +9h 04m 36s Done electrical_validation_report.json, PHYSICAL_TEST_PLAN.md
Team Simulation Toolchain Skillpack (adom/robot-sim-skillpack, Adom internal) Nov 13, 3:45:26 PM CST +2h 03m 23s +9h 22m 45s Done adom/robot-sim-skillpack (Adom internal)
Full-RoM Electronics, Optical/RF FoV & Serviceability Clearance Audit Nov 13, 5:28:12 PM CST +3h 46m 09s +10h 55m 21s Done electronics_clearance_report.json, electronics_fov_rom_clearance.png
Native Isaac Lab 3.0 + Newton (MuJoCo-Warp) 16,384-Env Short Training (80 iters) Nov 13, 5:55:05 PM CST +4h 13m 02s +11h 22m 14s Done isaaclab_microgoose/, isaaclab_newton_microgoose_short.onnx
3-Engine Sim2Sim Cross-Check (Newton MJWarp -> CPU MuJoCo BAM + MIT/TRI Drake) Nov 15, 8:46:06 AM CST +4h 23m 00s +11h 32m 12s Done isaaclab_newton_short_validation.json (8.75 deg MuJoCo, 21.49 deg Drake on fixed inertias)
Contralateral Leg-Frame & Shell CAD Bug Fix + Full Asset Regeneration Nov 15, 9:27:05 AM CST +4h 42m 53s +11h 52m 05s Done build_microgoose_cad.py (23/23 1-solid STLs, 0 XZ-bug pairs, 416.5 g / 14h 35m slice)
Full 5,000-Iteration Isaac Lab 3.0 + Newton Gait Training (16,384 envs) Pending Pending Pending In progress Awaiting workstation thermal go (~5.1 to 9.3 h on RTX 4090)