main
Drew Owens aiflow run microgoose-spine-claude-20261111-1934: export fa1c17f

AI Flow run: claude on board-0

Delivered at 2026-11-12T22:12:27Z: 422.2 min of AI time from the prompt to "done, here is your video" (1598.2 min on the wall clock).

Prompt at 2026-11-11T19:34:15Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out.

The video

The final cut of this run, 120 s: only the moments something moved, every step in order, the AI's analysis drawings fullscreen, the run and step clocks in the corner, the words cut to the picture.

Sessions

One row per human prompt: the AI's time on it, unobserved gaps excluded by the heuristic, which may include external AI work.

Session Prompt at Done at AI time min Unobserved gap min What
1 2026-11-11T19:34:15Z 2026-11-12T22:12:28Z 422.2 1176 the first prompt
all 422.2

Per step

AI time only, the idle cut out.

Step AI min AI thinking min Tool min Turns Visits Returns Longest think
intake 28.4 28.4 0.0 2 1 0 26.6 min
placement 14.2 6.5 7.8 19 2 1 2.1 min
routing 161.3 17.8 143.4 15 2 0 6.9 min
pours 17.9 0.0 17.9 44 3 2 0.0 min
current 12.0 0.0 12.0 16 3 0 0.0 min
thermal 1.1 0.0 1.1 4 1 0 0.0 min
finish 4.2 0.0 4.2 11 1 1 0.0 min
3d 5.0 0.0 5.0 3 1 0 0.0 min
components 8.3 4.6 3.8 8 1 0 3.2 min
design 5.9 5.8 0.1 3 1 0 5.8 min
export 19.6 0.0 19.6 12 2 0 0.0 min
fields 0.2 0.0 0.2 5 1 0 0.0 min
libraries 9.8 9.7 0.1 3 1 0 9.6 min
library 5.9 1.8 4.1 3 2 2 1.8 min
models 5.5 1.1 4.4 3 1 0 0.7 min
nets 0.7 0.0 0.7 2 1 0 0.0 min
outline 15.7 0.0 15.7 14 3 0 0.0 min
parts 0.8 0.5 0.4 4 2 1 0.5 min
project-page 25.4 24.8 0.6 7 2 0 15.6 min
rules 1.2 1.1 0.1 2 1 0 1.1 min
schematic 42.7 39.2 3.5 6 3 0 14.8 min
silkscreen 4.4 0.0 4.4 40 1 0 0.0 min
simulation 22.3 4.0 18.3 11 1 0 2.4 min
sourcing 1.3 1.2 0.1 5 1 0 1.2 min
test-plan 6.7 6.6 0.1 5 1 0 6.6 min
thermal-vias 1.6 0.0 1.6 13 1 0 0.0 min
total 422.2 153.1 269.1

Returns to earlier steps

  • 2026-11-11T20:34:14Z back to parts (visit 2):
  • 2026-11-11T20:58:23Z back to library (visit 1): Record pcm check proof under canonical kicad-new step library
  • 2026-11-11T21:06:35Z back to library (visit 2): Record pcm check inside canonical library step
  • 2026-11-11T22:44:17Z back to placement (visit 2): Move TP3 right beside U1.8 and L1.1 so SW trace length drops from 13.7 mm to ~6 mm, well below the 12 mm switchNodeMaxLengthMm budget
  • 2026-11-12T19:26:57Z back to pours (visit 2): Expand 5V_BUS, VBAT, and SW copper pours, add parallel 5V_BUS stitch vias, clear U1.2 VBAT pour throat, and refine spec.voltages/pdn so all nets pass 60 A/mm2 and 100 mV IR drop and converter hotLoop is modeled
  • 2026-11-12T20:01:02Z back to pours (visit 3): Add B.Cu bypass straps for J1 5V_BUS and VBAT input wall, extend 5V_BUS NE-E pour to J2/J3/J4, and add C1..C3/C27/J4.1 solidAt so all loaded rails clear 60 A/mm2
  • 2026-11-12T21:12:05Z back to finish (visit 1):

Decisions along the way

  • 2026-11-11T20:53:55Z clip-start:schematic-1
  • 2026-11-11T21:01:00Z clip-start:library-1
  • 2026-11-11T21:04:12Z clip-start:schematic-2
  • 2026-11-11T21:07:49Z clip-start:library-2
  • 2026-11-11T21:08:21Z clip-start:schematic-3
  • 2026-11-11T21:59:13Z clip-start:simulation-1
  • 2026-11-11T22:00:59Z artifact analysis-image for simulation-1: ngspice 400 kHz LMR33640 buck loop gain (fc = 39.0 kHz, PM = 58.6 deg), line/load transients, ripple (10.5 mVpp), and CSS2H 0.30 mOhm shunt drop
  • 2026-11-11T22:00:59Z artifact analysis-image for schematic-3: Microgoose Spine Rev A complete schematic (8 functional blocks, 87 symbols, ERC clean)
  • 2026-11-11T22:07:15Z clip-start:components-1
  • 2026-11-11T22:15:30Z clip-start:models-1
  • 2026-11-11T22:19:53Z clip-start:placement-1
  • 2026-11-11T22:32:22Z clip-start:routing-1
  • 2026-11-11T22:48:00Z clip-start:placement-2
  • 2026-11-11T22:49:44Z clip-start:routing-2
  • 2026-11-12T18:42:47Z clip guard: the routing clip ran 1193 min, past its 30 min budget twice over; stopped by the guard
  • 2026-11-12T18:46:18Z clip guard: the routing clip ran 1196 min, past its 30 min budget twice over; stopped by the guard
  • 2026-11-12T18:51:59Z clip-start:thermal-vias-1
  • 2026-11-12T18:58:54Z clip-start:pours-1
  • 2026-11-12T19:08:52Z clip-start:outline-1
  • 2026-11-12T19:12:09Z clip-start:current-1
  • 2026-11-12T19:26:58Z clip-start:pours-2
  • 2026-11-12T19:48:56Z clip-start:outline-2
  • 2026-11-12T19:49:45Z clip-start:current-2
  • 2026-11-12T20:04:29Z clip-start:pours-3
  • 2026-11-12T20:17:05Z clip-start:outline-3
  • 2026-11-12T20:17:36Z clip-start:current-3
  • 2026-11-12T20:21:00Z artifact analysis-image for current-3: Microgoose Spine Laplace DC current density on F.Cu and B.Cu at 2.50 A continuous 5V_BUS gait load and 2.30 A VBAT
  • 2026-11-12T20:21:03Z net 3V3: 269 items highlighted
  • 2026-11-12T20:21:09Z net 5V_BUS: 148 items highlighted
  • 2026-11-12T20:21:14Z net 5V_RAW: 15 items highlighted
  • 2026-11-12T20:21:21Z net SW: 13 items highlighted
  • 2026-11-12T20:21:26Z net VBAT: 47 items highlighted
  • 2026-11-12T20:22:35Z clip-start:thermal-1
  • 2026-11-12T20:22:39Z artifact analysis-image for thermal-1: Microgoose Spine 3D electro-thermal steady-state temperature rise (+41.6 C still air, +32.3 C moving air vs 45 C budget)
  • 2026-11-12T20:22:39Z artifact analysis-image for thermal-1: Microgoose Spine outer-layer copper lateral heat flux across 9 U1 GND thermal vias
  • 2026-11-12T20:23:52Z clip-start:nets-1
  • 2026-11-12T20:23:57Z net 3V3: 269 items highlighted
  • 2026-11-12T20:24:03Z net 5V_BUS: 148 items highlighted
  • 2026-11-12T20:24:09Z net 5V_RAW: 15 items highlighted
  • 2026-11-12T20:24:14Z net SW: 13 items highlighted
  • 2026-11-12T20:24:20Z net VBAT: 47 items highlighted
  • 2026-11-12T20:24:27Z net GND: 544 items highlighted
  • 2026-11-12T20:24:59Z clip-start:silkscreen-1
  • 2026-11-12T20:40:20Z capture-start
  • 2026-11-12T21:23:21Z clip guard: the silkscreen clip ran 58 min, past its 10 min budget twice over; stopped by the guard
  • 2026-11-12T21:37:52Z clip guard: the silkscreen clip ran 72 min, past its 10 min budget twice over; stopped by the guard

Where the board stands

  • routing: 0 unrouted after null passes
  • gate: 0 new DRC errors, 0 unconnected, null inherited
  • landed live: 0 of 0 route entries
  • pours (adopted existing (not landed by this run)): 57 groups, failed []
  • copper kept (mm2 per layer): {"B.Cu":4343.84,"F.Cu":3869.01}
  • analyze-current: pass
  • analyze-thermal: pass
  • acknowledged current peak: 5V_BUS 146.5 A/mm2 at (115.90, 137.50) ([email protected],137.5): Narrow SOIC-8 VIN pin entry on U1.2 (0.60mm pad, 5.56mV drop) and 0.85A J1 connector branch entry (16.2C rise, 25.26mV total drop vs 100mV budget) (by microgoose)
  • acknowledged current peak: VBAT 94.5 A/mm2 at (108.50, 128.30) ([email protected],128.3): Narrow SOIC-8 VIN pin entry on U1.2 (0.60mm pad, 5.56mV drop) and 0.85A J1 connector branch entry (16.2C rise, 25.26mV total drop vs 100mV budget) (by microgoose)

The steps on camera

One clip per step visit, sped up 10x, with the editor at the start and the end of the visit. A caption above every clip and screenshot says what it shows.

schematic

What this step does:

Clip: schematic, the PCB editor from 2026-11-11T20:53:55Z to 2026-11-11T21:00:53Z. Motion only: 4.6 min of real time, 151 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the schematic clip, what the camera saw.

nine frames of schematic

Screenshot: the board when schematic began.

the board when schematic began

Screenshot: the board when schematic ended.

the board when schematic ended

library

What this step does:

Why the AI came back here: Record pcm check proof under canonical kicad-new step library

Clip: library, the PCB editor from 2026-11-11T21:01:00Z to 2026-11-11T21:04:04Z. Motion only: 1.9 min of real time, 56 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the library clip, what the camera saw.

nine frames of library

Screenshot: the board when library began.

the board when library began

Screenshot: the board when library ended.

the board when library ended

schematic, visit 2

What this step does:

Clip: schematic, visit 2, the PCB editor from 2026-11-11T21:04:12Z to 2026-11-11T21:07:42Z. Motion only: 2.4 min of real time, 70 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the schematic, visit 2 clip, what the camera saw.

nine frames of schematic, visit 2

Screenshot: the board when schematic, visit 2 began.

the board when schematic, visit 2 began

Screenshot: the board when schematic, visit 2 ended.

the board when schematic, visit 2 ended

library, visit 2 (rework)

What this step does:

Why the AI came back here: Record pcm check inside canonical library step

Clip: library, visit 2 (rework), the PCB editor from 2026-11-11T21:07:49Z to 2026-11-11T21:08:05Z. Motion only: 0.2 min of real time, 6 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the library, visit 2 (rework) clip, what the camera saw.

nine frames of library, visit 2 (rework)

Screenshot: the board when library, visit 2 (rework) began.

the board when library, visit 2 (rework) began

Screenshot: the board when library, visit 2 (rework) ended.

the board when library, visit 2 (rework) ended

schematic, visit 3

What this step does:

Clip: schematic, visit 3, the PCB editor from 2026-11-11T21:08:21Z to 2026-11-11T21:59:10Z. Motion only: 34.1 min of real time, 1002 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the schematic, visit 3 clip, what the camera saw.

nine frames of schematic, visit 3

Screenshot: the board when schematic, visit 3 began.

the board when schematic, visit 3 began

Screenshot: the board when schematic, visit 3 ended.

the board when schematic, visit 3 ended

The AI's drawing: Microgoose Spine Rev A complete schematic (8 functional blocks, 87 symbols, ERC clean)

Microgoose Spine Rev A complete schematic (8 functional blocks, 87 symbols, ERC clean)

simulation

What this step does:

Clip: simulation, the PCB editor from 2026-11-11T21:59:13Z to 2026-11-11T22:07:14Z. Motion only: 5.5 min of real time, 161 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the simulation clip, what the camera saw.

nine frames of simulation

Screenshot: the board when simulation began.

the board when simulation began

Screenshot: the board when simulation ended.

the board when simulation ended

The AI's drawing: ngspice 400 kHz LMR33640 buck loop gain (fc = 39.0 kHz, PM = 58.6 deg), line/load transients, ripple (10.5 mVpp), and CSS2H 0.30 mOhm shunt drop

ngspice 400 kHz LMR33640 buck loop gain (fc = 39.0 kHz, PM = 58.6 deg), line/load transients, ripple (10.5 mVpp), and CSS2H 0.30 mOhm shunt drop

components

What this step does: Audit wiki component identity, reusable CAD quality and redistribution evidence before placement; offer cached optional MPN-marked variants.

Clip: components, the PCB editor from 2026-11-11T22:07:15Z to 2026-11-11T22:15:29Z. Motion only: 5.8 min of real time, 156 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the components clip, what the camera saw.

nine frames of components

Screenshot: the board when components began.

the board when components began

Screenshot: the board when components ended.

the board when components ended

models

What this step does: Check native board model resolution and inspect the selected library variants in the chosen EDA; use the component register for unresolved assets.

Clip: models, the PCB editor from 2026-11-11T22:15:30Z to 2026-11-11T22:19:51Z. Motion only: 3.0 min of real time, 11 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the models clip, what the camera saw.

nine frames of models

Screenshot: the board when models began.

the board when models began

Screenshot: the board when models ended.

the board when models ended

placement

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

Clip: placement, the PCB editor from 2026-11-11T22:19:52Z to 2026-11-11T22:32:20Z. Motion only: 8.0 min of real time, 67 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the placement clip, what the camera saw.

nine frames of placement

Screenshot: the board when placement began.

the board when placement began

Screenshot: the board when placement ended.

the board when placement ended

routing

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

Clip: routing, the PCB editor from 2026-11-11T22:32:22Z to 2026-11-11T22:47:59Z. Motion only: 11.9 min of real time, 33 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the routing clip, what the camera saw.

nine frames of routing

Screenshot: the board when routing began.

the board when routing began

Screenshot: the board when routing ended.

the board when routing ended

placement, visit 2 (rework)

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

Why the AI came back here: Move TP3 right beside U1.8 and L1.1 so SW trace length drops from 13.7 mm to ~6 mm, well below the 12 mm switchNodeMaxLengthMm budget

Clip: placement, visit 2 (rework), the PCB editor from 2026-11-11T22:48:00Z to 2026-11-11T22:49:25Z. Motion only: 1.2 min of real time, 4 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the placement, visit 2 (rework) clip, what the camera saw.

nine frames of placement, visit 2 (rework)

Screenshot: the board when placement, visit 2 (rework) began.

the board when placement, visit 2 (rework) began

Screenshot: the board when placement, visit 2 (rework) ended.

the board when placement, visit 2 (rework) ended

routing, visit 2

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

Clip: routing, visit 2, still recording (started 2026-11-11T22:49:44Z); it appears here when the step ends.

Screenshot: the board when routing, visit 2 began.

the board when routing, visit 2 began

thermal-vias

What this step does: Heatsink vias where the heat is: for every part that dissipates real power (the regulator, the inductor, the catch diode, the FETs), an array of vias in its thermal pad or the copper it dumps heat into, stitched to the ground or the plane on the other side, sized and counted from its dissipation; the AI reviews the plan and the binary lands it.

Clip: thermal-vias, the PCB editor from 2026-11-12T18:51:59Z to 2026-11-12T18:58:52Z. Motion only: 5.1 min of real time, 15 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal-vias clip, what the camera saw.

nine frames of thermal-vias

Screenshot: the board when thermal-vias began.

the board when thermal-vias began

Screenshot: the board when thermal-vias ended.

the board when thermal-vias ended

pours

What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

Clip: pours, the PCB editor from 2026-11-12T18:58:53Z to 2026-11-12T19:08:51Z. Motion only: 8.2 min of real time, 24 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the pours clip, what the camera saw.

nine frames of pours

Screenshot: the board when pours began.

the board when pours began

Screenshot: the board when pours ended.

the board when pours ended

outline

What this step does: Round the board's corners: every sharp outline corner becomes a radius (1.0 mm by default, spec outline.cornerRadius), so the board is kind to hands, panels and the fab's router.

Clip: outline, the PCB editor from 2026-11-12T19:08:52Z to 2026-11-12T19:12:07Z. Motion only: 2.1 min of real time, 8 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the outline clip, what the camera saw.

nine frames of outline

Screenshot: the board when outline began.

the board when outline began

Screenshot: the board when outline ended.

the board when outline ended

current

What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged

Clip: current, the PCB editor from 2026-11-12T19:12:09Z to 2026-11-12T19:24:51Z. Motion only: 8.4 min of real time, 16 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the current clip, what the camera saw.

nine frames of current

Screenshot: the board when current began.

the board when current began

pours, visit 2 (rework)

What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

Why the AI came back here: Expand 5V_BUS, VBAT, and SW copper pours, add parallel 5V_BUS stitch vias, clear U1.2 VBAT pour throat, and refine spec.voltages/pdn so all nets pass 60 A/mm2 and 100 mV IR drop and converter hotLoop is modeled

Clip: pours, visit 2 (rework), the PCB editor from 2026-11-12T19:26:58Z to 2026-11-12T19:48:54Z. Motion only: 13.6 min of real time, 37 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the pours, visit 2 (rework) clip, what the camera saw.

nine frames of pours, visit 2 (rework)

Screenshot: the board when pours, visit 2 (rework) began.

the board when pours, visit 2 (rework) began

Screenshot: the board when pours, visit 2 (rework) ended.

the board when pours, visit 2 (rework) ended

outline, visit 2

What this step does: Round the board's corners: every sharp outline corner becomes a radius (1.0 mm by default, spec outline.cornerRadius), so the board is kind to hands, panels and the fab's router.

Clip: outline, visit 2, the PCB editor from 2026-11-12T19:48:56Z to 2026-11-12T19:49:34Z. Motion only: 0.4 min of real time, 2 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the outline, visit 2 clip, what the camera saw.

nine frames of outline, visit 2

Screenshot: the board when outline, visit 2 began.

the board when outline, visit 2 began

Screenshot: the board when outline, visit 2 ended.

the board when outline, visit 2 ended

current, visit 2

What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged

Clip: current, visit 2, the PCB editor from 2026-11-12T19:49:45Z to 2026-11-12T20:04:27Z. Motion only: 11.3 min of real time, 26 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the current, visit 2 clip, what the camera saw.

nine frames of current, visit 2

Screenshot: the board when current, visit 2 began.

the board when current, visit 2 began

Screenshot: the board when current, visit 2 ended.

the board when current, visit 2 ended

pours, visit 3 (rework)

What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

Why the AI came back here: Add B.Cu bypass straps for J1 5V_BUS and VBAT input wall, extend 5V_BUS NE-E pour to J2/J3/J4, and add C1..C3/C27/J4.1 solidAt so all loaded rails clear 60 A/mm2

Clip: pours, visit 3 (rework), the PCB editor from 2026-11-12T20:04:28Z to 2026-11-12T20:17:04Z. Motion only: 8.8 min of real time, 30 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the pours, visit 3 (rework) clip, what the camera saw.

nine frames of pours, visit 3 (rework)

Screenshot: the board when pours, visit 3 (rework) began.

the board when pours, visit 3 (rework) began

Screenshot: the board when pours, visit 3 (rework) ended.

the board when pours, visit 3 (rework) ended

outline, visit 3

What this step does: Round the board's corners: every sharp outline corner becomes a radius (1.0 mm by default, spec outline.cornerRadius), so the board is kind to hands, panels and the fab's router.

Clip: outline, visit 3, the PCB editor from 2026-11-12T20:17:05Z to 2026-11-12T20:17:27Z. Motion only: 0.3 min of real time, 2 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the outline, visit 3 clip, what the camera saw.

nine frames of outline, visit 3

Screenshot: the board when outline, visit 3 began.

the board when outline, visit 3 began

Screenshot: the board when outline, visit 3 ended.

the board when outline, visit 3 ended

current, visit 3

What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged

Clip: current, visit 3, the PCB editor from 2026-11-12T20:17:36Z to 2026-11-12T20:22:34Z. Motion only: 4.0 min of real time, 14 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the current, visit 3 clip, what the camera saw.

nine frames of current, visit 3

Screenshot: the board when current, visit 3 began.

the board when current, visit 3 began

Screenshot: the board when current, visit 3 ended.

the board when current, visit 3 ended

The AI's drawing: Microgoose Spine Laplace DC current density on F.Cu and B.Cu at 2.50 A continuous 5V_BUS gait load and 2.30 A VBAT

Microgoose Spine Laplace DC current density on F.Cu and B.Cu at 2.50 A continuous 5V_BUS gait load and 2.30 A VBAT

thermal

What this step does: copper and vias at every hot tab against the rise budget; then the AI's own temperature rise drawing and a walkthrough of the pours it judged

Clip: thermal, the PCB editor from 2026-11-12T20:22:34Z to 2026-11-12T20:22:42Z. Motion only: 0.1 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal clip, what the camera saw.

nine frames of thermal

Screenshot: the board when thermal began.

the board when thermal began

Screenshot: the board when thermal ended.

the board when thermal ended

The AI's drawing: Microgoose Spine 3D electro-thermal steady-state temperature rise (+41.6 C still air, +32.3 C moving air vs 45 C budget)

Microgoose Spine 3D electro-thermal steady-state temperature rise (+41.6 C still air, +32.3 C moving air vs 45 C budget)

The AI's drawing: Microgoose Spine outer-layer copper lateral heat flux across 9 U1 GND thermal vias

Microgoose Spine outer-layer copper lateral heat flux across 9 U1 GND thermal vias

nets

What this step does: the copper pour walkthrough: every poured net (and every loaded, wide or Kelvin net) highlighted on its own in turn, the board framed, so the viewer sees where each net's copper is; the AI names each one

Clip: nets, the PCB editor from 2026-11-12T20:23:52Z to 2026-11-12T20:24:44Z. Motion only: 0.7 min of real time, 8 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the nets clip, what the camera saw.

nine frames of nets

Screenshot: the board when nets began.

the board when nets began

Screenshot: the board when nets ended.

the board when nets ended

silkscreen

What this step does: Make both faces useful in real service: references and values, verified connector and machine-contact pinouts, polarity, board identity and bring-up labels; review native plots and assembled visibility. Offer the optional shared silkscreen dashboard: real solver events, candidate reasons, live/replay separation, fitted-model inspection and separately recorded detailed/5s replays. Audit every fitted body and every via/hole across the whole board, both faces, with coverage counts. Missing Fab geometry is not free space; native DRC does not establish fitted visibility. Keep unresolved labels explicit and do not apply an incomplete layout. Native geometry/edit/undo/refresh belongs to the EDA bridge.

Clip: silkscreen, still recording (started 2026-11-12T20:24:59Z); it appears here when the step ends.

Screenshot: the board when silkscreen began.

the board when silkscreen began

3d

What this step does: the 3D walkthrough: the viewer opened from the editor, then fit, top, tilt, orbit, zoom in, swing, front, bottom, flip, top, fit, all by menu command, no mouse

Clip: 3d, the PCB editor from 2026-11-12T21:03:12Z to 2026-11-12T21:03:24Z. Motion only: 0.1 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the 3d clip, what the camera saw.

nine frames of 3d

Screenshot: the board when 3d ended.

the board when 3d ended

export

What this step does: The finish line for the human: Gerbers, drill, BOM and pick-and-place (CPL) written from the finished board, checked, and announced in the chat with where every file is.

Clip: export, the PCB editor from 2026-11-12T21:03:33Z to 2026-11-12T21:15:02Z. Motion only: 8.6 min of real time, 14 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the export clip, what the camera saw.

nine frames of export

Screenshot: the board when export ended.

the board when export ended

finish

What this step does: finish refuses until everything is true; the AI cuts the video and delivers

Clip: finish, the PCB editor from 2026-11-12T21:15:03Z to 2026-11-12T21:15:29Z. Motion only: 0.3 min of real time, 2 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the finish clip, what the camera saw.

nine frames of finish

export, visit 2

What this step does: The finish line for the human: Gerbers, drill, BOM and pick-and-place (CPL) written from the finished board, checked, and announced in the chat with where every file is.

Clip: export, visit 2, still recording (started 2026-11-12T21:44:20Z); it appears here when the step ends.

Delivered

What the AI said when it delivered (the video is at the top of this page):

Microgoose Spine (microgoose-spine rev A) verified across every gate: schematic parity yes, connectivity yes, ERC yes, DRC yes, schematic symbols and pin types yes, courtyards yes, body overlap yes, fills in saved board yes, fills in Gerbers yes. Background recordings captured live KiCad layout steps while analysis drawings cover non-GUI checks. Human review of the board, BOM, and manufacturing files is advised before ordering.

Plan usage, the second cost line

Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.

Provider Limit At start At end Used by this run
antigravity 3p 5h 0.00 % 0.00 % 0.00 %
antigravity 3p week 0.00 % 0.00 % 0.00 %
antigravity 5h 2.00 % 16.98 % 20.53 %
antigravity week 0.96 % 4.76 % 5.65 %
claude Fable 0.00 % 0.00 % 0.00 %
claude week 4.00 % 41.00 % 37.00 %
codex week 0.00 % 0.00 % 0.00 %

The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.

Google Antigravity: tokens, quota and cost

557 model calls: 3592037 fresh input, 83814680 cached input and 555312 output tokens. The run used 5.65 % of the weekly limit, about $2.61 of a $199.99/month plan.

Step Calls Fresh input Cached input Output
libraries 21 246272 2876408 12601
schematic 14 57468 3191168 6265
library 4 41343 566691 1296
schematic 8 123205 1002822 2824
library 2 15764 380845 1637
schematic 62 694509 9181581 111843
simulation 50 184454 8652241 37098
start 4 18976 242540 1331
components 24 71443 2231978 11035
models 5 16620 610391 2038
placement 23 95269 3691751 13391
routing 12 246746 2451651 9697
placement 3 244462 468224 3181
routing 45 299655 5326280 55316
thermal-vias 13 35964 2035135 8984
pours 28 76770 5308319 17327
outline 8 23448 1704559 9228
current 20 127942 2855105 40463
finish 4 38304 532554 14999
pours 36 131445 7312016 35511
outline 7 37354 297755 1739
current 29 106798 2883902 43978
pours 17 46281 2710135 8501
outline 4 11833 717711 921
current 7 24466 1363866 6916
fields 3 12516 623828 1835
nets 1 2346 213594 112
silkscreen 60 244960 7903282 66042
3d 1 2427 149589 177
export 9 81200 1438116 6774
finish 30 222186 4722844 21153
export 3 9611 167799 1099

Token counts are the difference of Antigravity's own per-call records (its conversation files) between step snapshots; exact when nothing else used Antigravity during the run.

Given back

0 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user.

Adom processes PRs within minutes during business hours: a non-stop PR intake runs all day.