by Drew Owens
Open-source 15-DoF XL330 biped goose robot with Spine molecule PCB, 3D-printed chassis, and Isaac Lab to MuJoCo sim-to-real RL stack
| Name | Last updated |
|---|---|
| active_timeline_data.json | |
| build_headline_timeline.py | |
| microgoose_build_timeline.html | |
| microgoose_build_timeline.png | |
| README.md | |
| timeline_audit.json |
Active build time (9h 23m total: 7h 19m Phase 1 + 2h 03m Phase 2) is computed as the union of continuous execution intervals across all seven gemini-4-carbon agent transcripts and background EDA, slicer, and GPU jobs, collapsing any global inactivity gap over 20 minutes with zero agent steps or running tools into a thin axis break (//).
Microgoose Project Build and Validation Timeline
Back to Microgoose Overview | Active-time data & generator: active_timeline_data.json, build_headline_timeline.py, microgoose_build_timeline.html | Raw audit: timeline_audit.json | AI Flow log: AI Flow Run Ledger
Every timestamp on this page is extracted directly from the Google Antigravity conversation transcripts, adom-aiflow step telemetry, drew2/microgoose git commit metadata, and subsystem output artifacts, converted to US Central Time (CST, UTC-6) relative to Drew's initial build prompt (T0 = Nov 11, 2026, 1:34:15 PM CST / 2026-11-11T19:34:15Z).
Executive Summary: Active & Wall-Clock Totals from Initial Prompt (T0)
| End-to-End Milestone | Completion Time (CST, UTC-6) |
Active Build Time | Wall-Clock from T0 |
Notes |
|---|---|---|---|---|
Initial Microgoose Prompt (T0) |
Nov 11, 1:34:15 PM CST |
+0m 00s |
+0m 00s |
Open-source 15-DoF biped + microgoose-spine PCB + 7-stage GTC RL stack requested |
Prompt to First Wiki Commit (v0.1.0 scaffold) |
Nov 11, 1:53:45 PM CST |
+19m 30s |
+19m 30s |
Commit d619a0c1e6 creating drew2/microgoose |
| Prompt to AI Flow Intake / Circuit Design Start | Nov 11, 2:00:48 PM CST |
+26m 33s |
+26m 33s |
step intake at +26m 33s; step design at +29m 38s (2:03:53 PM CST) |
Prompt to Stage 6 Firmware + 50 Hz goosectl Runtime |
Nov 11, 2:30:09 PM CST |
+55m 54s |
+55m 54s |
344/344 C11 checks pass; final 0.30 mOhm R20 lock at +1h 43m 27s |
| Prompt to First Project Page Publish (Revision 1) | Nov 11, 2:37:40 PM CST |
+1h 03m 25s |
+1h 03m 25s |
Commit 2a24eb61aa (chosen parts, BOM table, KiCad PCM metadata) |
Prompt to Stage 1 CUDA PPO Policy (2.02M steps) |
Nov 11, 2:43:16 PM CST |
+1h 09m 01s |
+1h 09m 01s |
7m 23.5s (443.49 s) RTX 4090 GPU wall-clock; Policy Arena 87.06/100 at +1h 18m 10s |
Prompt to 15-DoF CAD (23 parts) + Bambu .3mf Slice |
Nov 11, 4:41:14 PM CST |
+3h 06m 59s |
+3h 06m 59s |
3-plate H2D slice (427.86 g, 16h 38m); routed PCB STEP re-bind at +6h 25m 31s active |
Prompt to Electronics Rev A DRC/ERC Clean (board-9) |
Nov 12, 2:54:27 PM CST |
+5h 45m 18s |
+25h 20m 12s |
1,029 tracks, 172 vias, 0 DRC, 0 ERC (7h 02m AI Flow active tool/model time) |
Prompt to AI Flow finish + finish-guard Pass |
Nov 12, 4:13:00 PM CST |
+7h 03m 51s |
+26h 38m 45s |
Live DRC/ERC 0 errors (3:44:16 PM CST), 120 s build film, finish-guard exit 0 |
Prompt to Phase 1 Full-Stack Wiki Delivery (v0.1.0) |
Nov 12, 4:16:32 PM CST |
+7h 07m 23s |
+26h 42m 17s |
Commits e8432493df & e614ae8487 (32/32 integration checks; live 3D signoff +7h 19m 22s active) |
| Phase 2 Dual-Engine Sim, FEA, SPICE & Org Skillpack | Nov 13, 3:45:26 PM CST |
+9h 22m 45s |
+50h 11m 11s |
All 7 Phase 2 deliverables & adom/robot-sim-skillpack (Adom internal) Done |
Compute, Models & Multi-Agent Execution Summary
- Workstation & Hardware: A Windows laptop with an RTX 4090 Laptop GPU (
16 GBVRAM) running WSL2 (Ubuntu 24.04). Headless EDA, 3D solid modeling, and print slicing ran against KiCad 10 IPC/CLI,ngspice-42,adom-fields, OpenCascade (OCCT/CadQuery), and Bambu Studio (Bambu Lab H2D,0.4 mmnozzle). - GPU Locomotion Training Totals (training_metrics.json):
- Phase 1 Stage 1 CUDA PPO (
Nov 11):2,016,000environment steps (350PPO updates x160vectorized BAM environments) in443.49 s(7m 23.5s,0.12319GPU-hours) onNVIDIA GeForce RTX 4090 Laptop GPU. - Phase 2 Stage 2/3 Full-DR + Slope CUDA PPO (
Nov 13):+1,024,000environment steps (200PPO updates x160environments,20workers,2,616.0mean steps/s,+-8.5 degslopes,6.0 Vto8.4 Vbattery OCV,0to8 msbus latency) in391.44 s(6m 31.4s,0.10873GPU-hours). - Cumulative GPU RL Compute:
3,040,000environment steps in834.93 s(13m 54.9stotal GPU wall-clock,0.23192GPU-hours).
- Phase 1 Stage 1 CUDA PPO (
- AI Orchestration Topology: Google Antigravity running
gemini-4-carbonacross1Parent Coordinator,5parallel Phase 1 Specialist Subagents, and1Phase 2 Project Timeline Subagent. Across Phase 1 delivery (Nov 12, 4:12:28 PM CST), the6Phase 1 sessions executed1,066gemini-4-carbonmodel calls (12,302,530fresh input tokens,146,447,043cached input tokens, and1,576,232output tokens).
| Agent Role | Session ID | Model | Active Window (CST, UTC-6) |
Steps | Phase 1 Calls | Output Tokens |
|---|---|---|---|---|---|---|
| Parent Coordinator (Architecture, Integration & Phase 2 Sim) | d1adcf0c |
gemini-4-carbon |
Nov 11, 1:34:15 PM to Nov 13, 3:32:51 PM+ |
1,026+ |
176 |
203,711 |
| RL & Sim-to-Real Engineer (BAM ID, CUDA PPO, ONNX, Arena) | 1b3af51d |
gemini-4-carbon |
Nov 11, 2:02:19 PM to Nov 11, 4:45:06 PM |
185 |
72 |
138,395 |
Firmware & Runtime Engineer (STM32G431 C11 + goosectl) |
ad29f6ce |
gemini-4-carbon |
Nov 11, 2:02:20 PM to Nov 11, 3:17:42 PM |
209 |
66 |
191,613 |
Electronics AI-Flow Engineer (microgoose-spine Rev A) |
9a5348f3 |
gemini-4-carbon |
Nov 11, 2:47:03 PM to Nov 12, 4:13:00 PM |
1,361 |
557 |
555,312 |
| Mechanical CAD & Slicing Engineer (15-DoF CAD + Bambu H2D) | 28a27b8a |
gemini-4-carbon |
Nov 11, 2:47:04 PM to Nov 12, 3:34:40 PM |
333 |
121 |
350,063 |
| Integration, Datasheet & Validation Engineer (PDF + 32 Checks) | 65c690b1 |
gemini-4-carbon |
Nov 11, 2:47:07 PM to Nov 12, 3:45:14 PM |
259 |
74 |
137,138 |
| Project Timeline Sub-Readme Author (Phase 2 Audit & Graphic) | 1ee83341 |
gemini-4-carbon |
Nov 13, 2:35:55 PM to present |
150+ |
n/a (Phase 2) | n/a (Phase 2) |
RTX 4090 Laptop GPU PPO training curves (3.04M cumulative environment steps across 160 vectorized Microgoose environments).
Master Chronological Milestone Log (Phase 1 Build to Phase 2 Validation)
| Milestone / What Happened | Time (CST, UTC-6) |
Active Elapsed | Wall-Clock from T0 |
Status | Evidence Link |
|---|---|---|---|---|---|
| Initial user prompt (T0): Drew requests open-source 15-DoF Microgoose biped built end-to-end with AI Flow + 7-stage NVIDIA GTC sim-to-real RL stack | Nov 11, 1:34:15 PM CST |
+0m 00s |
+0m 00s |
Done |
timeline_audit.json (d1adcf0c step 0) |
First wiki page creation and initial commit (v0.1.0 component/project scaffold on drew2/microgoose) |
Nov 11, 1:53:45 PM CST |
+19m 30s |
+19m 30s |
Done |
page.json (commit d619a0c1e6) |
AI Flow run initialized (intake -> rules -> design) + first 2 specialist subagents launched (RL & Sim-to-Real, Firmware & Runtime) |
Nov 11, 2:00:48 PM CST |
+26m 33s |
+26m 33s |
Done |
AI Flow Run Ledger |
Stage 1 BAM XL330-M288-T actuator identification fitted (0.036 deg validation RMSE, armature + friction + 5 V bus droop) |
Nov 11, 2:08:40 PM CST |
+34m 25s |
+34m 25s |
Done |
fit_xl330.py, bam_xl330_fit.png |
AI Flow design, test-plan, and sourcing completed (87 top-side SMT components under 2-layer 3rdPartyFab rules) |
Nov 11, 2:17:45 PM CST |
+43m 30s |
+43m 30s |
Done |
calcs.json, bom.csv (f6bd869faf) |
Stage 6 initial STM32G431 C11 firmware (200 Hz DXL Sync R/W) + 50 Hz goosectl host runtime verified (344/344 checks) |
Nov 11, 2:30:09 PM CST |
+55m 54s |
+55m 54s |
Done |
firmware/README.md, runtime/README.md |
Phase 1 Stage 3 CUDA PPO training launched on NVIDIA GeForce RTX 4090 Laptop GPU (2,016,000 steps across 160 parallel BAM envs) |
Nov 11, 2:34:50 PM CST |
+1h 00m 35s |
+1h 00m 35s |
Done |
train_ppo_cuda.py |
Revision 1 drew2/microgoose project page published (chosen parts, component table, KiCad PCM metadata) |
Nov 11, 2:37:40 PM CST |
+1h 03m 25s |
+1h 03m 25s |
Done |
page.json (commit 2a24eb61aa) |
Stage 1 CUDA PPO training finished (443.49 s, 0.12319 GPU-h) + self-contained policy.onnx exported (1.31e-6 max PyTorch diff) |
Nov 11, 2:43:16 PM CST |
+1h 09m 01s |
+1h 09m 01s |
Done |
policy.onnx, onnx_export_report.json |
Drew prompts parallel subsystem scale-out (step 295); Coordinator launches Electronics AI-Flow, Mechanical CAD & Slicing, and Integration Validation subagents (step 297) |
Nov 11, 2:44:44 PM CST |
+1h 10m 29s |
+1h 10m 29s |
Done |
timeline_audit.json (d1adcf0c steps 295, 297) |
Phase 1 7-Stage RL & Sim-to-Real stack complete (10.0 s CPU MuJoCo walk + +0.18 m/s push recovery + Policy Arena 87.06/100, 32/32 survival) |
Nov 11, 2:52:25 PM CST |
+1h 18m 10s |
+1h 18m 10s |
Done |
arena_scorecard.json, sim2sim_report.json |
Cross-subsystem validator & 8-page vector datasheet v1 built; catches R20 0.30 mOhm (CSS2H-2512R-L300F) shunt scaling across firmware/board |
Nov 11, 3:13:45 PM CST |
+1h 39m 30s |
+1h 39m 30s |
Done |
Microgoose-Datasheet.pdf |
Firmware & Runtime locked to finalized design/netlist.json pins and 0.30 mOhm INA226 CAL = 0x42AB (1 mA/LSB) |
Nov 11, 3:17:42 PM CST |
+1h 43m 27s |
+1h 43m 27s |
Done |
firmware/README.md |
AI Flow schematic (0 ERC) and ngspice-42 simulation (58.6 deg PM, 212 mV 3.5 A gait step droop) completed |
Nov 11, 4:04:39 PM CST |
+2h 30m 24s |
+2h 30m 24s |
Done |
microgoose-spine.kicad_sch, simulation_results.json |
Headless Bambu Studio 3-plate .3mf/STL slice completed (23 parts on Bambu Lab H2D: 427.86 g filament, 16h 38m total print time) |
Nov 11, 4:36:10 PM CST |
+3h 01m 55s |
+3h 01m 55s |
Done |
bambu_slice_report.json |
Mechanical 15-DoF OCCT CAD (66 solids, 550.2 g), 6-bundle cable routing, OCCT collision check, and Hero GLB v1 delivered |
Nov 11, 4:41:14 PM CST |
+3h 06m 59s |
+3h 06m 59s |
Done |
build_microgoose_cad.py, kinematics_mass_props.json |
RL MJCF/URDF updated with exact OCCT CAD per-link masses, CoMs, and inertias; CPU MuJoCo walk (1.55 m forward, 1.80 m straight-line) and microgoose-walk-sim2sim.mp4 re-verified |
Nov 11, 4:45:06 PM CST |
+3h 10m 51s |
+3h 10m 51s |
Done |
microgoose.xml, microgoose-walk-sim2sim.mp4 |
AI Flow components, models (87/87 Z-up), placement v2, and Day 1 routing pass finished (end of Active Segment 1) |
Nov 11, 5:07:32 PM CST |
+3h 33m 17s |
+3h 33m 17s |
Done |
AI Flow Run Ledger (3392b8d901) |
Active Segment 2 started (status? prompt at 12:42:26 PM CST): Electronics AI-Flow resumed at routing (12:45:42 PM CST) |
Nov 12, 12:45:42 PM CST |
+3h 36m 33s |
+23h 11m 27s |
Done |
timeline_audit.json (d1adcf0c steps 364, 382) |
AI Flow thermal-vias, pours, outline, current, thermal (+41.6 degC still air), fields, and nets completed |
Nov 12, 2:24:33 PM CST |
+5h 15m 24s |
+24h 50m 18s |
Done |
fields_thermal.png, current_density.png (f1a1919c1b) |
Electronics microgoose-spine Rev A layout & silkscreen finalized (board-9.kicad_pcb: 1,029 tracks, 172 vias, 0 DRC, 0 ERC, 0 unconnected) |
Nov 12, 2:54:27 PM CST |
+5h 45m 18s |
+25h 20m 12s |
Done |
microgoose-spine.kicad_pcb, pcb_top_2d.png (9dbc5f4c32) |
Electronics 3d GLB (microgoose-spine.glb) and export v1 (Gerbers, BOM, CPL, 38.6 MB microgoose-spine.step) completed |
Nov 12, 3:12:05 PM CST |
+6h 02m 56s |
+25h 37m 50s |
Done |
microgoose-spine.step, microgoose-spine.export.json (ff40cd12a9) |
Mechanical assembly re-bound to routed microgoose-spine.step (0 collisions across 802 PCB solids & 2,145 pairs), Bambu 3-plate slice re-verified, Hero GLB refreshed |
Nov 12, 3:34:40 PM CST |
+6h 25m 31s |
+26h 00m 25s |
Done |
interference-report.json, microgoose-hero.glb |
AI Flow finish gate passed (0 live KiCad DRC, 0 ERC, 0 unrouted) + full-stack integration gate passed (32/32 checks, 8-page PDF refreshed) |
Nov 12, 3:45:14 PM CST |
+6h 36m 05s |
+26h 10m 59s |
Done |
steps/24-finish/README.md, full_stack_report.json (0fe8b17e5e) |
AI Flow deliver (120 s narrated microgoose-spine-build.mp4) and adom-aiflow finish-guard --json passed (exit 0, decision: complete) |
Nov 12, 4:13:00 PM CST |
+7h 03m 51s |
+26h 38m 45s |
Done |
microgoose-spine-build.mp4, steps/25-export/README.md (9f4fb89d30) |
Phase 1 full-stack drew2/microgoose wiki publish (e8432493df & e614ae8487) + live 3D viewer, video, and datasheet browser verification complete |
Nov 12, 4:16:32 PM CST |
+7h 07m 23s |
+26h 42m 17s |
Done |
Microgoose Overview (commits e8432493df, e614ae8487; verified 4:28:31 PM CST) |
| Phase 2 sprint initiated (Active Segment 3): coupled electromechanical simulation, second-engine cross-check, mechanical/electrical validation, and org skillpack requested | Nov 13, 1:42:03 PM CST |
+7h 19m 22s |
+48h 07m 48s |
Done |
timeline_audit.json (d1adcf0c step 615) |
Phase 2 coupled XL330-M288-T + LMR33640 Spine bus-droop & thermal electromechanical model built (updated 3:01:00 PM CST) |
Nov 13, 1:53:55 PM CST |
+7h 31m 14s |
+48h 19m 40s |
Done |
xl330_electromech.py |
Phase 2 Stage 2/3 full-DR + +-8.5 deg slope CUDA PPO fine-tuning (+1,024,000 steps in 391.44 s, 100% eval survival) & policy.onnx v2 exported |
Nov 13, 2:12:18 PM CST |
+7h 49m 37s |
+48h 38m 03s |
Done |
training_metrics.json, training_curves.png |
Project Build and Validation Timeline sub-readme v1 published (68e9c182dd, e00dcd4171) |
Nov 13, 2:56:38 PM CST |
+8h 33m 57s |
+49h 22m 23s |
Done |
timeline/README.md |
Phase 2 STEP C2/C3/MC2 copper geometry audit completed (711 manifold solids verified; 18 nm OCCT fillet tangent proven benign) |
Nov 13, 3:15:59 PM CST |
+8h 53m 18s |
+49h 41m 44s |
Done |
step_geometry_audit.json |
Phase 2 dual-engine (MuJoCo 4.0.1 + MIT/TRI Drake 1.58.0) sim-to-sim cross-check completed across 8 locomotion & fall/get-up scenarios |
Nov 13, 3:24:39 PM CST |
+9h 01m 58s |
+49h 50m 24s |
Done |
sim2sim_cross_engine_report.json |
Phase 2 mechanical validation completed (10-min walk 0 falls, 39.25 degC peak winding vs 75.0 degC limit, CoM/ZMP sweeps & 3D scikit-fem TetP1 FEA) |
Nov 13, 3:25:41 PM CST |
+9h 03m 00s |
+49h 51m 26s |
Done |
mechanical_validation_report.json |
Phase 2 electrical validation (ngspice-42 400 kHz switching transients + adom-fields thermal/IR-drop) & Physical Test Plan completed |
Nov 13, 3:27:17 PM CST |
+9h 04m 36s |
+49h 53m 02s |
Done |
electrical_validation_report.json, PHYSICAL_TEST_PLAN.md |
Phase 2 team simulation toolchain skillpack packaged (adom/robot-sim-skillpack, Adom internal) |
Nov 13, 3:45:26 PM CST |
+9h 22m 45s |
+50h 11m 11s |
Done |
adom/robot-sim-skillpack (Adom internal) |
Full-RoM electronics, optical/RF FoV, and serviceability clearance audit completed (806 CAD mesh pairs; catches 3-piece contralateral leg-frame Workplane("XZ") -Y sign bug) |
Nov 13, 5:28:12 PM CST |
+10h 55m 21s |
+51h 53m 57s |
Done |
electronics_clearance_report.json, electronics_fov_rom_clearance.png |
Native Isaac Lab 3.0 + Newton (MuJoCo-Warp) 16,384-env short training (80 iterations = 31.46M steps in 417.7 s) & 3-engine sim2sim cross-check completed |
Nov 15, 8:46:06 AM CST |
+11h 32m 12s |
+91h 11m 51s |
Done |
isaaclab_microgoose/, isaaclab_newton_short_validation.json |
Contralateral 3-piece leg-frame & 2-piece torso-shell CAD bug fixed in build_microgoose_cad.py (23/23 single-solid STLs on their own leg, 0 OCCT collisions, 557.5 g mass, 416.5 g / 14h 35m Bambu slice, Hero GLB, MJCF/URDF/USD link inertias, and clearance checks regenerated) |
Nov 15, 9:27:05 AM CST |
+11h 52m 05s |
+91h 52m 50s |
Done |
build_microgoose_cad.py, microgoose-hero.glb, bambu_slice_report.json |
Complete 25-Stage Electronics AI Flow Chronology (microgoose-spine Rev A)
The microgoose-spine Molecule controller (70.0 x 70.0 mm, 2-layer 3rdPartyFab top-side SMT rules, 87 components) progressed through every adom-aiflow verification gate from initial intake to finish-guard completion:
| # | AI Flow Stage & Outcome | Start (CST, UTC-6) |
Finish (CST, UTC-6) |
Active at Finish | Status | Evidence Link |
|---|---|---|---|---|---|---|
01 |
intake: Requirements & 15-DoF Spine Molecule brief captured |
Nov 11, 2:00:48 PM CST |
Nov 11, 2:02:42 PM CST |
+28m 27s |
Done |
design/brief.md (d619a0c1e6) |
02 |
rules: Locked 2-layer 3rdPartyFab top-side SMT rule profile (70x70 mm Molecule) |
Nov 11, 2:02:42 PM CST |
Nov 11, 2:03:53 PM CST |
+29m 38s |
Done |
design/requirements.json (a702439070) |
03 |
design: LMR33640 5 V 4 A buck, AP2114H 3.3 V LDO, INA226 0.30 mOhm shunt, STM32G431, BMI270 architecture |
Nov 11, 2:03:53 PM CST |
Nov 11, 2:09:48 PM CST |
+35m 33s |
Done |
design/calcs.json (f1e817b11d) |
04 |
test-plan: Bring-up rail, ripple, DXL 1 Mbps bus, and IMU/ToF test criteria recorded |
Nov 11, 2:09:48 PM CST |
Nov 11, 2:16:28 PM CST |
+42m 13s |
Done |
design/calcs.json (b4e70f2949) |
05 |
sourcing: Sourced 87 board components (all passives >= 0603, in-stock MPNs) |
Nov 11, 2:16:28 PM CST |
Nov 11, 2:17:45 PM CST |
+43m 30s |
Done |
design/bom.csv (f6bd869faf) |
06 |
parts (v1-v2): Resolved Molecule corner pins MP1..MP4, edge contacts MC1..MC10, and IC CAD packages |
Nov 11, 2:17:45 PM CST |
Nov 11, 2:37:38 PM CST |
+1h 03m 23s |
Done |
design/bom.csv (5962bdd87d) |
07 |
project-page (Rev 1): Published Revision 1 component table and KiCad PCM metadata to drew2/microgoose |
Nov 11, 2:18:27 PM CST |
Nov 11, 2:43:58 PM CST |
+1h 09m 43s |
Done |
page.json (2a24eb61aa) |
08 |
libraries & library (v1-v2): Built project KiCad symbol and footprint tables with verified pad geometry |
Nov 11, 2:43:58 PM CST |
Nov 11, 3:07:59 PM CST |
+1h 33m 44s |
Done |
kicad/fp-lib-table (ab61ab88d3) |
09 |
schematic (v1-v3): Generated microgoose-spine.kicad_sch with 0 ERC violations across all 87 symbols |
Nov 11, 2:53:47 PM CST |
Nov 11, 3:58:03 PM CST |
+2h 23m 48s |
Done |
kicad/microgoose-spine.kicad_sch (09313272c1) |
10 |
simulation: ngspice-42 Bode stability (58.6 deg PM), 0.45 A to 3.5 A gait transient, and INA226 sense check |
Nov 11, 3:42:21 PM CST |
Nov 11, 4:04:39 PM CST |
+2h 30m 24s |
Done |
sim/simulation_results.json (5ac6408041) |
11 |
components: Instantiated all 87 footprints on 70.0 x 70.0 mm 2-layer board |
Nov 11, 4:04:39 PM CST |
Nov 11, 4:13:00 PM CST |
+2h 38m 45s |
Done |
design/netlist.json (c40da61c07) |
12 |
models: Bound and Z-up oriented 87/87 3D STEP/GLB component models |
Nov 11, 4:13:00 PM CST |
Nov 11, 4:18:31 PM CST |
+2h 44m 16s |
Done |
kicad/set_models.py (c2b40f91d1) |
13 |
placement (v1-v2): Placed Molecule grid, centered BMI270, and tightened U1 SW hot-loop trace from 13.7 mm to ~6 mm |
Nov 11, 4:18:31 PM CST |
Nov 11, 4:49:09 PM CST |
+3h 14m 54s |
Done |
kicad/plan_placement.py (b41e09c2a9) |
14a |
routing (v1 & Day 1): Initial 2-layer routing pass through end of Active Segment 1 |
Nov 11, 4:27:51 PM CST |
Nov 11, 5:07:32 PM CST |
+3h 33m 17s |
Done |
...-claude-20261111-1934/README.md (3392b8d901) |
14b |
routing (Day 2 -> board-9): Completed routing in Active Segment 2; final board-9 gated at 2:54:27 PM CST (1,029 tracks, 172 vias, 0 DRC) |
Nov 12, 12:45:42 PM CST |
Nov 12, 12:51:57 PM CST |
+3h 42m 48s |
Done |
kicad/microgoose-spine.kicad_pcb (8698bdb261) |
15 |
thermal-vias: Stitched 9 thermal vias (0.30/0.60 mm) under LMR33640DDDAR exposed pad to top/bottom GND |
Nov 12, 12:51:57 PM CST |
Nov 12, 12:57:01 PM CST |
+3h 47m 52s |
Done |
kicad/microgoose-spine.kicad_pcb (eaf8c17c98) |
16 |
pours (v1-v3): 57 copper pour groups achieving 78.96% F.Cu and 88.65% B.Cu coverage with 0 islands |
Nov 12, 12:57:01 PM CST |
Nov 12, 2:13:12 PM CST |
+5h 04m 03s |
Done |
screenshots/pcb_top_2d.png (f931702d37) |
17 |
outline (v1-v3): 70.0 x 70.0 mm Edge.Cuts with 3.0 mm corner radii and 0 internal board cutouts |
Nov 12, 1:07:04 PM CST |
Nov 12, 2:17:23 PM CST |
+5h 08m 14s |
Done |
design/mechanical-interface.json (a170693083) |
18 |
current (v1-v3): Laplace DC current-density field solve passed across VBAT, 5V_BUS, and R20 Kelvin paths |
Nov 12, 1:10:54 PM CST |
Nov 12, 2:21:34 PM CST |
+5h 12m 25s |
Done |
docs/analysis/current_density.png (f468d6da37) |
19 |
thermal: Electro-thermal solve passed: +41.6 degC still air, +32.3 degC walking airflow (45.0 degC limit) |
Nov 12, 2:21:34 PM CST |
Nov 12, 2:22:40 PM CST |
+5h 13m 31s |
Done |
docs/analysis/fields_thermal.png (408c041c52) |
20 |
fields: Full 3D adom-fields PDN, hot-loop EMC, and thermal review passed |
Nov 12, 2:22:40 PM CST |
Nov 12, 2:23:51 PM CST |
+5h 14m 42s |
Done |
docs/analysis/fields_thermal.png (d216e5d23d) |
21 |
nets: Per-net copper pour connectivity and return-path walkthrough recorded |
Nov 12, 2:23:51 PM CST |
Nov 12, 2:24:33 PM CST |
+5h 15m 24s |
Done |
...-claude-20261111-1934/README.md (f1a1919c1b) |
22 |
silkscreen: Two-sided grouped functional silkscreen finalized on board-9.kicad_pcb (0 pad overlaps, 0 DRC) |
Nov 12, 2:24:33 PM CST |
Nov 12, 2:58:17 PM CST |
+5h 49m 08s |
Done |
screenshots/pcb_top_2d.png (9dbc5f4c32) |
23 |
3d: Copper-accurate microgoose-spine.glb with laser-etched ICs and studio renders verified |
Nov 12, 2:58:17 PM CST |
Nov 12, 3:09:40 PM CST |
+6h 00m 31s |
Done |
docs/3d/microgoose-spine.glb (249173d85a) |
24 |
export (v1): Exported Gerbers, drill, BOM, CPL, and 38.6 MB microgoose-spine.step (802 solids) |
Nov 12, 3:03:19 PM CST |
Nov 12, 3:12:05 PM CST |
+6h 02m 56s |
Done |
kicad/microgoose-spine.export.json (ff40cd12a9) |
25 |
finish: Passed live KiCad 10 DRC (0 violations, 0 unconnected), ERC (0 violations), and finish-checks |
Nov 12, 3:12:05 PM CST |
Nov 12, 3:44:18 PM CST |
+6h 35m 09s |
Done |
steps/24-finish/README.md (0fe8b17e5e) |
26 |
export (v2), deliver & finish-guard: Rendered 120 s narrated microgoose-spine-build.mp4, pushed run report, and passed finish-guard (exit 0) |
Nov 12, 3:44:18 PM CST |
Nov 12, 4:13:00 PM CST |
+7h 03m 51s |
Done |
steps/25-export/README.md (9f4fb89d30) |
Final DRC-clean microgoose-spine rev A 2-layer layout (1,029 routed segments, 172 vias, 78.96% F.Cu, 88.65% B.Cu, 0 unconnected nets).
3D adom-fields electro-thermal verification (+41.6 degC peak rise in still air, +32.3 degC in walking airflow vs. 45.0 degC limit).
Wiki Publish & Git Commit History (drew2/microgoose)
Across Phase 1 and Phase 2 timeline updates, drew2/microgoose recorded 110 commits prior to this headline graphic push. Primary engineering and publication commits:
| Commit Hash | Time (CST, UTC-6) |
Active Elapsed | Wall-Clock from T0 |
Status | Published Milestone |
|---|---|---|---|---|---|
d619a0c1e6 |
Nov 11, 1:53:45 PM CST |
+19m 30s |
+19m 30s |
Done |
Initial commit: component/microgoose (v0.1.0 page scaffold) |
a702439070 |
Nov 11, 2:02:44 PM CST |
+28m 29s |
+28m 29s |
Done |
AI Flow rules: 2-layer 3rdPartyFab Molecule design rules |
f1e817b11d |
Nov 11, 2:04:00 PM CST |
+29m 45s |
+29m 45s |
Done |
AI Flow design: power tree, MCU, IMU, and DXL bus calculations |
f6bd869faf |
Nov 11, 2:16:35 PM CST |
+42m 20s |
+42m 20s |
Done |
AI Flow sourcing: 87-component BOM locked |
2a24eb61aa |
Nov 11, 2:37:40 PM CST |
+1h 03m 25s |
+1h 03m 25s |
Done |
Revision 1 publish: chosen parts, component table, and KiCad PCM metadata |
09313272c1 |
Nov 11, 3:42:21 PM CST |
+2h 08m 06s |
+2h 08m 06s |
Done |
AI Flow schematic step evidence (0 ERC) |
5ac6408041 |
Nov 11, 4:04:39 PM CST |
+2h 30m 24s |
+2h 30m 24s |
Done |
AI Flow simulation step evidence (ngspice-42 loop & transient) |
c2b40f91d1 |
Nov 11, 4:18:31 PM CST |
+2h 44m 16s |
+2h 44m 16s |
Done |
AI Flow models step evidence (87/87 3D models aligned) |
b41e09c2a9 |
Nov 11, 4:49:10 PM CST |
+3h 14m 55s |
+3h 14m 55s |
Done |
AI Flow placement v2 step evidence (shortened SW loop) |
8698bdb261 |
Nov 12, 12:51:57 PM CST |
+3h 42m 48s |
+23h 17m 42s |
Done |
AI Flow routing Day 2 step evidence |
f931702d37 |
Nov 12, 2:13:11 PM CST |
+5h 04m 02s |
+24h 38m 56s |
Done |
AI Flow pours v3 step evidence (78.96% F.Cu, 88.65% B.Cu) |
408c041c52 |
Nov 12, 2:22:40 PM CST |
+5h 13m 31s |
+24h 48m 25s |
Done |
AI Flow thermal step evidence (+41.6 degC still air) |
d216e5d23d |
Nov 12, 2:23:51 PM CST |
+5h 14m 42s |
+24h 49m 36s |
Done |
AI Flow fields 3D electro-thermal & PDN step evidence |
9dbc5f4c32 |
Nov 12, 2:58:16 PM CST |
+5h 49m 07s |
+25h 24m 01s |
Done |
AI Flow silkscreen step evidence (board-9.kicad_pcb, 0 DRC) |
249173d85a |
Nov 12, 3:03:18 PM CST |
+5h 54m 09s |
+25h 29m 03s |
Done |
AI Flow 3d copper-accurate GLB step evidence |
d8b5f4a290 |
Nov 12, 3:12:00 PM CST |
+6h 02m 51s |
+25h 37m 45s |
Done |
Fields, thermal, and layout design review for microgoose-spine rev A |
ff40cd12a9 |
Nov 12, 3:12:04 PM CST |
+6h 02m 55s |
+25h 37m 49s |
Done |
AI Flow export v1 step evidence (Gerbers, BOM, CPL, STEP) |
0fe8b17e5e |
Nov 12, 3:44:18 PM CST |
+6h 35m 09s |
+26h 10m 03s |
Done |
AI Flow finish step evidence (live DRC/ERC clean) |
9f4fb89d30 |
Nov 12, 4:12:31 PM CST |
+7h 03m 22s |
+26h 38m 16s |
Done |
AI Flow final export & deliver (microgoose-spine-build.mp4 + run ledger) |
e8432493df |
Nov 12, 4:16:01 PM CST |
+7h 06m 52s |
+26h 41m 46s |
Done |
Publish Microgoose Rev A full-stack hardware, CAD, datasheet, and 7-stage RL stack |
e614ae8487 |
Nov 12, 4:16:32 PM CST |
+7h 07m 23s |
+26h 42m 17s |
Done |
Add KiCad 10 Spine PCB, STEP, Gerbers/BOM/CPL, and parametric mechanical CAD/STL/STEP |
68e9c182dd |
Nov 13, 2:53:42 PM CST |
+8h 31m 01s |
+49h 19m 27s |
Done |
Add Project Build and Validation Timeline sub-readme and timestamp audit |
e00dcd4171 |
Nov 13, 2:56:38 PM CST |
+8h 33m 57s |
+49h 22m 23s |
Done |
Surface Project Build and Validation Timeline in README TOC |
215b5dad38 |
Nov 13, 5:45:09 PM CST |
+11h 12m 18s |
+52h 10m 54s |
Done |
Public-release metadata scrub across repo, datasheet PDF, and KiCad PCM archive |
cdb9ed9463 |
Nov 13, 5:45:54 PM CST |
+11h 13m 03s |
+52h 11m 39s |
Done |
Flip drew2/microgoose visibility to public |
Phase 2 Simulation & Design Validation Status (Nov 13, 2026)
Phase 2 started at Nov 13, 2026, 1:42:03 PM CST (+7h 19m 22s cumulative active time / +48h 07m 48s calendar time after T0) to cross-verify the Rev A design across two independent multibody physics engines and coupled electrical/mechanical solvers before physical fabrication:
| Phase 2 Deliverable | Time (CST, UTC-6) |
Elapsed in Phase 2 | Active Elapsed | Status | Evidence Link |
|---|---|---|---|---|---|
Coupled XL330 + LMR33640 Spine Electromechanical Model |
Nov 13, 1:53:55 PM CST |
+11m 52s |
+7h 31m 14s |
Done |
xl330_electromech.py (updated 3:01:00 PM CST) |
Stage 2/3 Full-DR + +-8.5 deg Slope CUDA PPO & ONNX v2 |
Nov 13, 2:12:18 PM CST |
+30m 15s |
+7h 49m 37s |
Done |
training_metrics.json, policy.onnx |
STEP C2/C3/MC2 Copper Geometry Audit (711 solids) |
Nov 13, 3:15:59 PM CST |
+1h 33m 56s |
+8h 53m 18s |
Done |
step_geometry_audit.json |
Dual-Engine Cross-Check (MuJoCo 4.0.1 + MIT/TRI Drake 1.58.0) |
Nov 13, 3:24:39 PM CST |
+1h 42m 36s |
+9h 01m 58s |
Done |
sim2sim_cross_engine_report.json (8 scenarios) |
Mechanical Validation (10-min Thermal, CoM/ZMP & 3D scikit-fem FEA) |
Nov 13, 3:25:41 PM CST |
+1h 43m 38s |
+9h 03m 00s |
Done |
mechanical_validation_report.json (0 falls, 39.25 degC peak) |
Electrical Validation (ngspice-42 + adom-fields) & Test Plan |
Nov 13, 3:27:17 PM CST |
+1h 45m 14s |
+9h 04m 36s |
Done |
electrical_validation_report.json, PHYSICAL_TEST_PLAN.md |
Team Simulation Toolchain Skillpack (adom/robot-sim-skillpack, Adom internal) |
Nov 13, 3:45:26 PM CST |
+2h 03m 23s |
+9h 22m 45s |
Done |
adom/robot-sim-skillpack (Adom internal) |
| Full-RoM Electronics, Optical/RF FoV & Serviceability Clearance Audit | Nov 13, 5:28:12 PM CST |
+3h 46m 09s |
+10h 55m 21s |
Done |
electronics_clearance_report.json, electronics_fov_rom_clearance.png |
Native Isaac Lab 3.0 + Newton (MuJoCo-Warp) 16,384-Env Short Training (80 iters) |
Nov 13, 5:55:05 PM CST |
+4h 13m 02s |
+11h 22m 14s |
Done |
isaaclab_microgoose/, isaaclab_newton_microgoose_short.onnx |
3-Engine Sim2Sim Cross-Check (Newton MJWarp -> CPU MuJoCo BAM + MIT/TRI Drake) |
Nov 15, 8:46:06 AM CST |
+4h 23m 00s |
+11h 32m 12s |
Done |
isaaclab_newton_short_validation.json (8.75 deg MuJoCo, 21.49 deg Drake on fixed inertias) |
| Contralateral Leg-Frame & Shell CAD Bug Fix + Full Asset Regeneration | Nov 15, 9:27:05 AM CST |
+4h 42m 53s |
+11h 52m 05s |
Done |
build_microgoose_cad.py (23/23 1-solid STLs, 0 XZ-bug pairs, 416.5 g / 14h 35m slice) |
Full 5,000-Iteration Isaac Lab 3.0 + Newton Gait Training (16,384 envs) |
Pending |
Pending |
Pending |
In progress |
Awaiting workstation thermal go (~5.1 to 9.3 h on RTX 4090) |