main
John Lauer Add Fable 5.1 BQ25792 independent re-route example (side-by-side video, evidence, four shared skills) 9458d54 28d ago

Planner iteration history (all logs preserved under planner/out/)

run wall s nets ok/50 partial nets segments vias off-angle exact clearance viol. exact split nets change
v1 859.0 44 ILIM_HIZ, PROG, ACDRV2, !INT, !CE, !QON 335 54 0 38 13 first pass; exact check found same-net hugging counted as connection
v2 977.7 47 !QON, ACDRV2, PGND 343 49 0 2 26 same-net 0.25 spacing, raster margins, IC1 signals before power
v3 - - (run stopped before completion) - - - - - exact target masks (stub of source pad was counted as target) + repair pass (killed, superseded)
v4 - - (run stopped before completion) - - - - - via mask relaxed, fan-out order (killed: BAT wide escape walled !INT)
v5 - - (run stopped before completion) - - - - - wide escapes stay narrow 1.8 mm (killed: search state blow-up)
v6 231.9 42 ILIM_HIZ, PROG, !INT, ACDRV1, VBUS, REGN, VAC2, VAC1 473 56 0 - - A* state keyed on cell only (8x fewer states)
v7 294.1 45 PROG, !INT, BATP, REGN, VAC2 491 76 0 - - conservative raster, 0.15 mm pin stubs, 0.4/0.2 signal vias, cheaper fan-out vias
v8 97.6 47 PROG, BATP, VAC2 500 78 0 2 20 strict-inequality dilation
v9 - - (run stopped before completion) - - - - - dual raster (exact + clearance), fan-out order per IC1 side (v9 killed/relaunched as v9b)
v9 148.0 44 ACDRV1, !QON, !CE, VAC2, D_P, D_N 446 71 0 - - dual raster (exact + clearance), fan-out order per IC1 side (v9 killed/relaunched as v9b)
v10 461.5 45 ACDRV1, REGN, VAC1, D_P, D_N 473 79 0 - - reserved escape corridors on L1
v11 414.0 47 VAC2, D_P, D_N 465 75 0 1 25 half-cell padding, 0.15 mm IC1 signal nets, corridor release
v12 244.5 49 D_N 489 69 0 3 2 raster triple-dilation bug fixed (exact raster was 2 cells fat)
v13 563.6 47 !INT, REGN, VAC2 538 71 0 - - D_N before D_P, margin 0.02 (killed, superseded)
v14 564.6 47 !INT, REGN, VAC2 541 71 4 1 3 corner-pad joiners, edge keep-in fix
v15 504.9 47 !INT, REGN, VAC2 545 71 0 1 3 exact dog-bone repair, L-shaped joiners
v16 - - (run stopped before completion) - - - - - inner-layer via corridors, VAC2 before VAC1, corner-pad escapes