John Lauer Show reduced Q1 FR4 and heatsink conductive heat-flow animation with explicit limits 253cc27

Latest: Q1 heat flow through FR4 and heatsink

22-second narrated animation from Adom Fields'3D solid solver: compare fan-off/on assumptions, orbit the assembly, and hide the fins/base to reveal Q1 and its board path. Surface colours show temperature; moving markers show sampled conductive heat flux. Their speed is illustrative.

Reduced Q1-only model: FR4, simplified leads/pads, contact, insulation, base and fins are coupled. Exact native copper/vias and other heat sources are omitted. Fan modes use prescribed convection, not measured airflow; the switch is not transient cooling. This does not establish actual whole-board operating temperatures. Model inputs and limitations. Recorded/rendered on arav-rog with Adom TTS and separate captions.


Latest: corrected Q1 contact and 3D heat path

17-second narrated native-window review: reveal the assumed Q1 contact, add the heatsink base and fins, then compare the two prescribed convection cases. The earlier oversized contact patch is corrected to an explicitly assumed 8 × 10 mm patch. Steady-state sensitivity only, not measured fan performance or a new power rating.

Captured and rendered on arav-rog with continuous Adom TTS and separate captions. The switch compares two solved states; it is not a cooling transient. Thermal evidence and supplier response review.


Latest: fan state follows auxiliary power

15-second narrated native-window recording of the updated Probe Twin. The fan rotor starts from explicit simulated PS2 power, runs at an authored 8,300 RPM, and coasts to rest on shutdown. The visible 0.002× motion scale makes rotation inspectable. The housing and wires stay fixed; pause and backward seek preserve the expected rotor angle. This is authored simulation, not measured fan response or cooling qualification.

Recorded and rendered on arav-rog using Adom's native window recorder, with continuous Adom TTS narration and separate selectable captions. The take jumps from startup to shutdown; it does not imply instantaneous physical cooling. The unchanged board passes six nominal geometry checks with the longer, explicit power/settle sequence. Evidence and remaining thermal limitation.


Latest: corrected R7 probing replay

15-second Adom TTS narrated Probe Twin clip: the medium ground pin enters J7, the pincers release and rise, and the probe approaches the test pads. Large scaffold pins remain unchanged. The exact-input R7 run passes all six nominal probing checks. Browser sampling of 151 event midpoints found no reported tether snags or jaw penetrations against 5,237 component/exclusion envelopes. Simulated access only; thermal and physical qualification remain open.

Recorded, narrated and rendered on arav-rog. Playback is accelerated and conformed to continuous narration; captions remain separate. Input correction, source fix and thermal decision.


Latest: current-path repair

18-second narrated R5/R7 native-route comparison. The fused-supply elbow shifts and widens without entering the washer keepout. The0.1mm Fields peak drops69.78→59.72A/mm²; the limit remains60 and the small0.47% margin is disclosed. Native DRC0/0 and current screening pass. The revision-specific probing pass was withdrawn after copied input paths were found stale; the corrected R7 rerun now passes all six nominal probing stages (see the latest clip above). Thermal and physical qualification remain open.

This is a recorded geometry review with measured screening results, not footage of the original CAD edits or a field-color rendering. Recording and rendering used arav-rog. Captions are separate; no burned narration subtitles.

Latest: Q1 cooling-path review

21-second narrated review of the R6 exploratory thermal scenario. The actual PCB field map and lumped junction/case/heatsink results switch from assumed airflow to still air on the same color scale. This is not a spatial 3D heatsink simulation, measured temperature, or validated power rating. The model uses Q1 at5.5W; the5W bring-up cap and output lock remain.

Raw recording, editing and rendered video remain on arav-rog. Adom TTS narration has long pauses removed; captions are separate. Thermal assumptions and results.

Latest process clip: moving the fan connector clears the probe

This 12-second narrated before/after model review shows J9 moving 3 mm toward the fan. All four wires follow the actual native connector position and become shorter. The candidate passes native DRC with zero violations/opens, static wire-solid clearance, and all six input-bound nominal probing stages. Physical qualification, browser/CLI tether parity, and electrical/thermal acceptance remain open. This is saved-model review footage, not a successful workcell replay or a fabrication release.

Recorded and rendered on arav-rog with matched moving views, Adom TTS narration, silence trimmed, and separate captions. Raw footage remains there. The 5 W bring-up cap is unchanged.


Earlier process clip: a shorter route still needs probe clearance

This 15-second narrated before/after review shows TP16 moving closer to L1: BOOST_SW routing shrinks from15.4mm to11.63mm and loses two vias. Native DRC passes, but the subsequent full coverage check rejects this trial because the probe body is too close to fan connector J9. It is preserved as design-process evidence, not an approved board or a successful workcell replay. The next candidate moves test access toward the regulator.

Recorded and rendered on arav-rog. Matched moving views of saved native-board exports; Adom TTS narration, silence trimmed, separate selectable captions. No burned-in subtitles. Raw clips remain on arav-rog.


Earlier process clip: finding the pincer-clearance fault

This narrated 3D model review explains why raising the probe alone did not clear the heatsink: the pincer has an independent Z axis. It is retrospective model footage, not a recording of a successful workcell replay. The subsequent local CLI checks pass all six nominal probing stages with a 45 mm pincer rise and a cable-routing envelope outside the fin bank. Physical qualification and browser/CLI tether parity remain pending.

Recorded and narrated on arav-rog. Captions are selectable, not burned into the footage.

Correction, 2026-10-16: The TP16 probing clip below shows an invalid medium probe-pin connection to large MP1. Its previous probing-pass claim is withdrawn. Retained as design-history footage, not valid test-access evidence. The source fix rejects that mate. Revalidation using medium contact J7 found inadequate clearance to J1 wiring, so the board has returned to placement. A corrected successful replay is not available yet.

Electronic-load design progression

Superseded probing replay — invalid ground-pin mate

The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The former six-stage pass is withdrawn because its medium-to-large ground-pin mate was invalid. At that historical checkpoint, rework passed native DRC but failed assembled collision/tether checks. This historical clip does not qualify test access, electrical behavior or manufacturing tolerances.

The runtime batches rigid CAD faces for display only. The collision solver retains the complete unbatched engineering model. Browser/CLI tether-solver equivalence and fan motion-state integration remain separate open work; this clip is not proof of those features.

Sensor service access: matched before and after

These replacement clips focus on the actual changed area, with the same camera path, an amber location marker, faster movement, and Adom TTS narration without long silent pauses. Captions remain optional player tracks. The prior wide silent tours have been replaced.

Before

Before, the circuit board blocks access to the temperature sensor screw. Look underneath: there is no service opening here.

After

After, the sensor moves aside and a six point eight millimeter opening gives straight access from below. The cooler can stay assembled.

The marker identifies the revised access-hole position in both models. The sensor also moves 8 mm laterally and 0.5 mm longitudinally. These are retrospective geometry reviews, not footage of the original CAD editing. Service is planned with the molecule removed from the scaffold; physical tool, extraction and assembly qualification remain pending.