Evidence needed to qualify the cooling assembly

This is a prepared request/checklist, not a sent message or an order. Board32, firmware and the workcell are not released for customers. Candidate substitutions require a new mechanical and thermal review.

Manufacturer or assembly supplier

For the proposed 20 × 14 × 0.635 mm AlN interface, obtain an orderable part/drawing revision, dimensional and hole-position tolerances, flatness, surface finish, guaranteed thermal properties over the intended range, dielectric specification, compatible grease and recommended clamp pressure. Identify which exact drawing is being supplied; the Wakefield 178-25-220 product title and size table disagree. The Innovacera brochure is a separate alternative, not proof of the Wakefield part.

For the chosen PEEK fastening stack, obtain permissible sustained preload, creep/temperature and vibration-retention guidance for the actual engagement and washer/contact geometry. A nominal fit or reference tightening torque is not a preload guarantee.

For 3rdPartyFab, confirm minimum finished surface copper, minimum plated barrel copper, dielectric/overall thickness tolerances and finished-hole tolerances. The present current screen assumes 35 µm surface and 25 µm barrel copper. The thinner 17.5 µm surface study fails five nets and cannot be substituted silently.

Actual assembly and bench evidence

Use the thermal capture procedure with the exact board, firmware, insulator, grease, clamp, fan and duct. Record assembly identity, calibrated reference case temperature, electrical current, physical output enable and fan feedback. The procedure covers steady load and fault cases including blocked airflow while the rotor still turns. Establish sensor under-reading and dynamic lag before setting any trusted temperature allowance.

Current package studies remain conditional: the compact sink fails the full-power still-air screen. Passing a software shutdown test does not cure that failure. A supported cooling design change and fresh exact-input analysis are required before AIFlow thermal acceptance; physical results may reveal further required changes. Neither an approximate fan curve nor a fabricated calibration value may close the gate.

No production image should be enabled from this checklist. The current bring-up build remains permanently output locked.

Larger 125319 candidate: numerical acceptance target

The conditional margin study holds the existing 5.5 W guard power, 40 °C ambient and 55 °C case ceiling. With the unqualified 0.52731 K/W case-to-sink allowance, the installed sink-to-air resistance would need to be below 2.19996 K/W. This is about 1.445 times the 1.522 K/W product-page value, before measurement and transient uncertainty. This ratio is an allowable budget, not a prediction of installed degradation.

Ask for natural-convection data at the actual low temperature rise, cut length, surface finish, heat-source area/location and orientation, including the stationary fan/carrier obstruction. The catalog identifies a three-inch natural-convection specimen but does not specify enough conditions to establish our installed result. Keep the failed compact-sink still-air result and all physical gates open. No supplier message has been sent.