main
Name Last commit message Last updated
README.md adom-aiflow: step evidence (test-plan) · gzc 13h ago
shot-test-plan-1-end.png adom-aiflow: step evidence (test-plan) · gzc 13h ago
shot-test-plan-1-start.png adom-aiflow: step evidence (test-plan) · gzc 1d ago
shot-test-plan-2-start.png adom-aiflow: step evidence (test-plan) · gzc 13h ago

Step 6: Test plan

Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.

Visits

  • 2026-11-09T06:17:06Z
  • 2026-11-10T04:12:58Z

What the binary checked

testplan

  • added: 0 item(s)
  • file: /home/adom/project/keyboard65/design/tests.json
  • gaps: 0 item(s)
  • mode: board
  • notes: no MachineContactMedium on GND: the ground tether has nowhere to plug in (add one near each corner, adom/probing-workcell)
  • tests: 7 item(s)

Screenshots and drawings

start

start

end

end

start

start

visit 1-end

visit 1-end

visit 1-start

visit 1-start

visit 2-start

visit 2-start

Clips