main
John Lauer Publish input-bound R11 prototype bundle and completed CLI clearance review 7007e93

R11 prototype review bundle

This snapshot packages the72×72mm v5 PCB, assumed retained cooling assembly, fit parts, native PCB fabrication exports, output-locked firmware, test intent and input-bound review evidence. It is not an order, manufacturing release or industrial qualification.

Download ZIP · SHA-256 manifest · Assembly review.

The manifest identifies every file. The packaging script reads back every archive member and verifies its hash. Source files also remain individually browsable on the Wiki.

The cooling carrier, duct and fan flange are nominal fit-study STEP/STL parts. They need measured tolerances, selected materials, thread/fastener details and strain relief before manufacture. Preserve the AlN electrical-isolation and Q1 clamp requirements.

The included probing results use an isolated CLI candidate with the original collision thresholds and tether length. The source patch and before/after failures are included. Browser tether rendering does not yet share its obstacle-refinement contract; owner integration is pending. A visual animation is not substitute evidence.

Reproduction needs CadQuery, the recorded native KiCad/export environment, the identified probing code and the project dependencies. Recorded absolute paths identify the author's workspace; rebind them before running on another workstation. This archive is not an installer.

Keep the5W command cap and locked firmware. Physical airflow, interface resistance, sensor lag, fan control and shutdown measurements remain open. The original AIFlow thermal and final delivery gates have not passed. No hardware was ordered or flashed.