V8: user-requested second fan-bracket support

Download latest electrical-checkpoint assembly GLB · Mechanical STEP

John identified the unsupported side of the fan bracket in his annotated screenshot. This revision adds a third PCB mounting point specifically to support that side of the fan, while retaining the two heatsink ear mounts. It does not restore the old perimeter bracket.

H3 is local (64,12) mm / native KiCad (160,92) mm, with a 3.4 mm through-hole, M3x16 screw, top and bottom OD7 washers, and underside M3 nut. The added bracket leg reaches the FR4 and joins the lower fan flange. Its total bearing height is 10.335 mm. The native candidate includes both-face clearance circles and copper keepout.

The generated bracket is one connected solid. Internal modeled mechanical interference is audited in mechanical-audit.json. Thread engagement and the unqualified sensor connector mating envelope are explicitly separated from interference.

Verified on this revision: all three bolt holes and the Q1 access opening contain zero FR4; old mounting holes are filled. The new support and hardware have no intersections with exported board components. The remaining reported board overlap is the deliberately solid sensor mating-connector envelope; its actual terminal fit remains unqualified. The bracket is one connected solid with no unresolved internal mechanical intersections.

The existing Pup viewer now displays V8. The recorded reveal is videos/compact-r11/fan-support-v8/v8-mounting-and-underside.mp4; it shows the actual generated assembly, not live PCB editing. No captions are burned in.

Fresh task-local patched probing CLI: 17,368 poses over 233.4 seconds, zero head collisions, 771 tether solves and zero snags. The tether rests on Q2/R11 at some working positions; physical abrasion and full fan harness remain review items. Landing margins pass. This does not establish shared-tool deployment or browser solver parity.

Manufacturer fan STEP solids were also transformed to the exact displayed placement and checked against the new mechanics: zero solid intersections. A straight 6 mm driver envelope clears the modeled sink and hardware at all three vertical mounting screws; fan-fastener installation order remains a separate check.

The electrical checkpoint is now adopted as AIFlow board-6: native DRC reports zero violations and zero unconnected items. The updated viewer includes U10 relocated beside USB-C and the new copper/silkscreen export. The desktop PCB and rule sidecars are byte-matched to the adopted snapshot. Model resolution passes for all 115 footprints (95 with models, 20 intentionally without); all 18 planned measurements have electrical landing points.

Fresh assembled replay on this exact GLB reports zero head collisions and zero tether snags; landing margins pass. Coverage also passes: the full six-check nominal replay completed on the input-hashed model. Live placement verification completed after a timeout retry and identified missing H1/H2/H3 assembly courtyards. A separate candidate adds those envelopes; native DRC is running. A separate full-flag saved-board DRC completed cleanly. These results are separate gates, not interchangeable.

The new 25.2-second clip above shows this actual electrical checkpoint, including progressive cooler hiding and underside hardware. It is silent review footage without burned captions.

Pending: live placement completion, new current/thermal and USB signal reviews, sensor termination fit, full assembly/tool access, scaffold underside hardware clearance and material/preload/strength qualification. No fabrication acceptance or wattage increase is claimed.

Mounting-clearance refinement

AIFlow board-7 adds actual front/back washer courtyards for H1/H2/H3. Their native placement check found F1 too close; F1 is now 1 mm farther from H1 and its power path is rerouted. Native DRC remains zero violations/zero opens, and all 115 native placements pass. Native refill preserved 2468 net assignments. The current assembly download above includes this refinement. The 25.2-second clip predates this fuse shift and remains a review of the earlier electrical checkpoint.

A separate, unadopted sensor candidate replaces J10 with two-pin JST PH to accommodate the full insulation-diameter tolerance of the lug sensor leads. Its 288 connected pins match the 112-component native schematic; remaining silkscreen and assembly/harness checks are in progress. Current and thermal gates remain open.

The stale-native-board model-check defect is documented at AIFlow issue 50. Its tested source fix is published, not yet a shared package release.