Larger-heatsink contact correction
The first larger-cooler current/thermal calculation passed under its supplied resistances, but it did not establish a continuous physical contact stack. The proposed sink bottom is 7.25 mm above PCB top copper; Q1's nominal tab top is 4.455 mm. The existing 0.635 mm AlN layer and two assumed 0.020 mm grease films reach only 5.130 mm. The remaining 2.120 mm gap prevents adoption of that assembly. Its numerical report remains historical evidence, not final thermal acceptance.
The new isolated candidate adds a custom 14 × 20 × 2.100 mm copper spacer, plus a third 0.020 mm grease film. Its 3.2 mm hole is centered across the 14 mm width, 5 mm from the short end, coaxial with Q1 at board XY (127.46,65.34). Spacer Z is 5.130–7.230 mm; the final grease film reaches the sink at 7.250 mm. The AlN remains between the conductive drain tab and copper. No electrical isolation claim follows from the nominal drawing alone.
For the numerical screen, the original contact/spreading allowance is retained and the spacer bulk resistance and additional grease-interface resistance are added. The calculation assumes a 129.961768906 mm² contact area, 350 W/mK copper conductivity and 0.02 C-in²/W for the extra grease interface. These remain documented design assumptions. C11000 reference properties give a room-temperature value above the assumed conductivity; they do not guarantee this fabricated part across operating conditions. The revised case-to-sink estimate is 0.672763 K/W. At 5.5 W with 1.522 K/W sink-to-air and 0.42 K/W junction-to-case, the full-power series rise is 14.381°C against the unchanged 15°C limit. A new coupled Fields report is required.
Attachment correction
The nut-on-top proposal intersects a stock fin. CAD boolean results near coincident faces also varied with tiny tool-start offsets, so the audit retains several offsets and refuses to infer clearance from one zero-volume result. The 12 mm insulated screw proposal protrudes into a fin and is rejected.
The new candidate uses NBK SPE-M3-10-P, inserted from below Q1 into a proposed M3×0.5 tapped sink base. Its nominal engagement is 5.935 mm; its tip remains 1.177 mm below the base top. A 6.5 mm thread-depth proposal leaves 0.565 mm tip reserve. This is not a machining release: drill-point/bottoming-tool clearance, full thread depth, tolerances, PEEK preload/creep and contact pressure still require review. Assemble the screw before soldering Q1; the head cannot pass through the existing PCB hole. No board drill is added. No nut is used in this alternative.
The original STEP/GLB contains the nominal spacer, AlN, PEEK screw and existing Q1 model. The preview's ghosted box is only a local sink-base context, not the actual fins or a threaded manufacturer model. Vendor extrusion CAD remains local and is not redistributed.
Input-bound geometry and thermal report · Original candidate STEP · Original candidate GLB · Reproducible audit.
Nothing here qualifies hardware, releases machining or advances the formal Thermal gate. The earlier no-spacer candidate must not be adopted. Reconcile the full assembly, tolerances and BOM before selecting a design; physical bench qualification remains in the later user-scoped phase.
Pilot-hole follow-up
A separate local CAD study includes a2.5mm pilot with7.5mm cylindrical depth and its118° drill point. It explicitly removes35.006mm³ from the already carrier-drilled sink, extending1.139mm into the local fin root. The result remains one valid solid. This is proposed machining, not stock compatibility or proof that a bottoming tap will achieve6.5mm full threads. Supplier DFM, tolerance and tap lead clearance remain open. Machining study.
The prototype thermal design model is now selected in cooling-assembly.json. This does not release the mechanical assembly: full twin/BOM, material, retention, controlled tolerances and machining details remain tracked design deliverables. Physical measurements remain in the later user-scoped phase.