main
John Lauer Start compact R11 AIFlow revision; preserve Board34 and record initial fit and fan-control findings 940efe6

Completion plan — Board34 / R10

Updated 13 October 2026. AIFlow design finish passed. Current run is aiflow/run; board SHA256 74f8ac20cba6b95db26c40f5369156efec80cb80e35388fe064f6891ff78ff11. Do not resume Board32 or R9 as current.

Cooling review reopened — 13 October 2026

The historical Board34/R10 AIFlow run remains complete for its recorded assumptions. The user has now requested compact commercial cooling and spatial Q1 analysis. A new reduced-order study predicts approximately 56 C junction at the current contact location under a catalog-calibrated baseline, exceeding the existing 15 C rise screen. This exposes a possible omitted spreading penalty, not a qualified hardware result. Compact cooling, installed fan-on/off behavior and the resulting probe replay are not complete. See analysis and limits and commercial/mounting candidates. Preserve the paused supervisor and historical run evidence.

Completed design work

  • Native DRC and connectivity: zero new electrical violations/opens; 107 references and 276 connected pins match.
  • Two layers, 1 oz finished copper; 2 oz is an option requiring corresponding review. Large corner pins, edge USB-C and routed TP14/15/16.
  • Fresh exact-input 0.1 mm current and thermal gates pass; placement and saved-pour proofs refreshed. Q1 nominal case/junction 52.07/54.38 C at 40 C ambient and 5.5 W, using catalog passive cooling with no heatsink fan credit.
  • R10 original public assembly: one connected carrier, 650 fastener pair checks and fitted-body checks clear. Green mask and exposed-pad GLB gate pass.
  • Exact R10 full probing replay: 221.5 s, 20 touches, 14,528 poses, 721 tether solves; no modeled head collisions or snags. Input digests rechecked after twin generation.
  • Board34 exports checked: two copper layers, 348 plated drill entries, three nonplated holes, 91 placements and 107 BOM references. Files at manufacturing-review/board34.
  • Wiki hero, six README images and three-page datasheet refreshed. Smooth R10 render, native Fields/net/3D clips and R10 simulated fan startup/shutdown recorded. Narrated review cut about 4:34.

Delivery work

Final video checks/publication and deliver are complete. Finish-guard reports decision: complete, engineeringComplete: true, and an empty remaining list. Do not create another supervisor. Preserve the existing paused supervisor state. AIFlow dashboard remains one SSE view on 8893; simulator remains one Hydrogen tab on 4896.

Later physical work — outside this design finish

Prototype manufacturing/assembly review, installed cooling/contact/preload/print qualification, calibration, physical interlocks and firmware bring-up. No ordering, fabrication, flashing or actuation has occurred. The nominal thermal margin is small and is not a guaranteed installed rating. Firmware remains output locked. The simulator demonstrates access and authored RPM, not full circuit or hardware acceptance. Custom parts/hardware still need quotes; no complete purchase total is asserted.

Resume locations

  • Electrical source: kicad/, run aiflow/run.
  • Assembly: mechanical/side-fan-r10; public model is an original simplified render, supplier extrusion governs machining.
  • Active probing project: probing-preview-r10-original, not the historical root probing-flow/state.json.
  • Evidence: checkpoints/board34-r10-selection/fields, probing-preview-r10-original/probing-flow/collide.json, manufacturing-review/board34/review.json.
  • Review video: videos/full-edit-r10; per-scene storyboard on port 8963, file watching disabled.

Prior continuation history is preserved. Shared probing fixes remain draft PR2; source review and deployed availability are separate.