940efe6
Completion plan — Board34 / R10
Updated 13 October 2026. AIFlow design finish passed. Current run is aiflow/run; board SHA256 74f8ac20cba6b95db26c40f5369156efec80cb80e35388fe064f6891ff78ff11. Do not resume Board32 or R9 as current.
Cooling review reopened — 13 October 2026
The historical Board34/R10 AIFlow run remains complete for its recorded assumptions. The user has now requested compact commercial cooling and spatial Q1 analysis. A new reduced-order study predicts approximately 56 C junction at the current contact location under a catalog-calibrated baseline, exceeding the existing 15 C rise screen. This exposes a possible omitted spreading penalty, not a qualified hardware result. Compact cooling, installed fan-on/off behavior and the resulting probe replay are not complete. See analysis and limits and commercial/mounting candidates. Preserve the paused supervisor and historical run evidence.
Completed design work
- Native DRC and connectivity: zero new electrical violations/opens; 107 references and 276 connected pins match.
- Two layers, 1 oz finished copper; 2 oz is an option requiring corresponding review. Large corner pins, edge USB-C and routed TP14/15/16.
- Fresh exact-input 0.1 mm current and thermal gates pass; placement and saved-pour proofs refreshed. Q1 nominal case/junction 52.07/54.38 C at 40 C ambient and 5.5 W, using catalog passive cooling with no heatsink fan credit.
- R10 original public assembly: one connected carrier, 650 fastener pair checks and fitted-body checks clear. Green mask and exposed-pad GLB gate pass.
- Exact R10 full probing replay: 221.5 s, 20 touches, 14,528 poses, 721 tether solves; no modeled head collisions or snags. Input digests rechecked after twin generation.
- Board34 exports checked: two copper layers, 348 plated drill entries, three nonplated holes, 91 placements and 107 BOM references. Files at
manufacturing-review/board34. - Wiki hero, six README images and three-page datasheet refreshed. Smooth R10 render, native Fields/net/3D clips and R10 simulated fan startup/shutdown recorded. Narrated review cut about 4:34.
Delivery work
Final video checks/publication and deliver are complete. Finish-guard reports decision: complete, engineeringComplete: true, and an empty remaining list. Do not create another supervisor. Preserve the existing paused supervisor state. AIFlow dashboard remains one SSE view on 8893; simulator remains one Hydrogen tab on 4896.
Later physical work — outside this design finish
Prototype manufacturing/assembly review, installed cooling/contact/preload/print qualification, calibration, physical interlocks and firmware bring-up. No ordering, fabrication, flashing or actuation has occurred. The nominal thermal margin is small and is not a guaranteed installed rating. Firmware remains output locked. The simulator demonstrates access and authored RPM, not full circuit or hardware acceptance. Custom parts/hardware still need quotes; no complete purchase total is asserted.
Resume locations
- Electrical source:
kicad/, runaiflow/run. - Assembly:
mechanical/side-fan-r10; public model is an original simplified render, supplier extrusion governs machining. - Active probing project:
probing-preview-r10-original, not the historical rootprobing-flow/state.json. - Evidence:
checkpoints/board34-r10-selection/fields,probing-preview-r10-original/probing-flow/collide.json,manufacturing-review/board34/review.json. - Review video:
videos/full-edit-r10; per-scene storyboard on port 8963, file watching disabled.
Prior continuation history is preserved. Shared probing fixes remain draft PR2; source review and deployed availability are separate.
# Completion plan — Board34 / R10
Updated 13 October 2026. **AIFlow design finish passed.** Current run is `aiflow/run`; board SHA256 `74f8ac20cba6b95db26c40f5369156efec80cb80e35388fe064f6891ff78ff11`. Do not resume Board32 or R9 as current.
## Cooling review reopened — 13 October 2026
The historical Board34/R10 AIFlow run remains complete for its recorded assumptions. The user has now requested compact commercial cooling and spatial Q1 analysis. A new reduced-order study predicts approximately 56 C junction at the current contact location under a catalog-calibrated baseline, exceeding the existing 15 C rise screen. This exposes a possible omitted spreading penalty, not a qualified hardware result. Compact cooling, installed fan-on/off behavior and the resulting probe replay are **not complete**. See [analysis and limits](../analysis/compact-cooling/README.md) and [commercial/mounting candidates](compact-5w-feasibility.md). Preserve the paused supervisor and historical run evidence.
## Completed design work
- Native DRC and connectivity: zero new electrical violations/opens; 107 references and 276 connected pins match.
- Two layers, 1 oz finished copper; 2 oz is an option requiring corresponding review. Large corner pins, edge USB-C and routed TP14/15/16.
- Fresh exact-input 0.1 mm current and thermal gates pass; placement and saved-pour proofs refreshed. Q1 nominal case/junction 52.07/54.38 C at 40 C ambient and 5.5 W, using catalog passive cooling with no heatsink fan credit.
- R10 original public assembly: one connected carrier, 650 fastener pair checks and fitted-body checks clear. Green mask and exposed-pad GLB gate pass.
- Exact R10 full probing replay: 221.5 s, 20 touches, 14,528 poses, 721 tether solves; no modeled head collisions or snags. Input digests rechecked after twin generation.
- Board34 exports checked: two copper layers, 348 plated drill entries, three nonplated holes, 91 placements and 107 BOM references. Files at `manufacturing-review/board34`.
- Wiki hero, six README images and three-page datasheet refreshed. Smooth R10 render, native Fields/net/3D clips and R10 simulated fan startup/shutdown recorded. Narrated review cut about 4:34.
## Delivery work
Final video checks/publication and `deliver` are complete. Finish-guard reports `decision: complete`, `engineeringComplete: true`, and an empty remaining list. Do not create another supervisor. Preserve the existing paused supervisor state. AIFlow dashboard remains one SSE view on 8893; simulator remains one Hydrogen tab on 4896.
## Later physical work — outside this design finish
Prototype manufacturing/assembly review, installed cooling/contact/preload/print qualification, calibration, physical interlocks and firmware bring-up. No ordering, fabrication, flashing or actuation has occurred. The nominal thermal margin is small and is not a guaranteed installed rating. Firmware remains output locked. The simulator demonstrates access and authored RPM, not full circuit or hardware acceptance. Custom parts/hardware still need quotes; no complete purchase total is asserted.
## Resume locations
- Electrical source: `kicad/`, run `aiflow/run`.
- Assembly: `mechanical/side-fan-r10`; public model is an original simplified render, supplier extrusion governs machining.
- Active probing project: **`probing-preview-r10-original`**, not the historical root `probing-flow/state.json`.
- Evidence: `checkpoints/board34-r10-selection/fields`, `probing-preview-r10-original/probing-flow/collide.json`, `manufacturing-review/board34/review.json`.
- Review video: `videos/full-edit-r10`; per-scene storyboard on port 8963, file watching disabled.
[Prior continuation history](completion-plan-history-r9-r10.md) is preserved. Shared probing fixes remain draft PR2; source review and deployed availability are separate.