John Lauer Deliver Board34 R10 prototype review, current simulator twin and 4m34s narrated process cut 47014bd

Active completion plan

Updated 2026-10-13. Finish the custom electronic-load board through adom-aiflow, complete the probing simulation and project Wiki, and prepare the requested narrated build film. Supporting tool fixes do not complete this work. Preserve all acceptance gates. No physical cell actuation, ordering, fabrication, flashing or YouTube publication is authorized by this plan.

Current board and run

  • Adopted Board34 / R23, aiflow/run/board-34.kicad_pcb, SHA256 74f8ac20cba6b95db26c40f5369156efec80cb80e35388fe064f6891ff78ff11.
  • Canonical schematic and PCB in kicad/ are synchronized. Native comparison: 107 references, 276/276 connected pins match. Exact R23 native DRC: zero electrical errors and zero opens.
  • Two layers, standard 1 oz finished copper; 2 oz on request. Public fab name: 3rdPartyFab.
  • 72 x 104 mm outline; large corner machine pins; edge-mounted J8 USB-C; TP14/15/16 included. Do not resume from Board32 or its cooling evidence.
  • Run aiflow/run, target AdomLapper, thread adom-custom-load. Recheck live target and saved board before mutations. Current step thermal. Outline has no sharp corners; supported outline round verified zero changes. Current analysis passed with checkpoints/board34-edge-spec-fields/fields.json.
  • Task binary /home/adom/project/load-aiflow-edge-target/debug/adom-aiflow. Source fixes published through 438f37f0654cb563b2e448fc0254e38ba388cbb9; shared installed package is separate. One SSE dashboard on 8893.

Open acceptance gates

  1. Thermal: exact Board34 bare-board Fields screen fails; no fan/heatsink thermal credit has been accepted. Operating envelope remains 4.5–24 V, min(3 A, 5 W/V), Q1 guard 5.5 W, ambient 40 C, case ceiling 55 C. Do not weaken these. ATS candidate forced-air tables require installed airflow and a defined contact/spreading path. mechanical/side-fan-airflow/ contains a conditional pressure budget, not proof of cooling.
  2. Probing: probing-preview-r9/probing-flow/collide.json passes the full 221.5 s replay, 20 touches, 14,528 poses and 721 tether solves: zero head collisions and zero snags. Exact inputs are hash-bound. Wire-on-heatsink contact remains a physical wear review. Live simulator 4896 serves R9 in the existing single webview; always pass ui --port 4896.
  3. Cooling mechanics: R9 corrects disconnected R6 carrier and R8 fastener intersections. One valid connected carrier; no unexpected fitted-body or checked hardware intersections; 301 exposed mask centres pass. M4x35 fan hardware and M3x10 captive clamp stacks are nominal, not supplier-released. Manufacturer fin geometry, Q1 machining/insulation stack, clamp preload and print retention remain unqualified.
  4. Simulation functionality: fan animation is explicitly simulated RPM with authored acceleration/deceleration, not measured dynamics or hardware control. Complete electronic-load command/current/shunt/fault/reference tests before claiming functional simulation coverage. Browser now includes board-body obstacles; jaw, floor, module-compression and smoothed-input parity remains open.
  5. Delivery: rerun downstream AIFlow finish/export gates on the final adopted board/assembly. Do not reuse old Board32 thermal/export acceptance. Refresh cooling metadata/BOM, datasheet, screenshots and exact component records after final geometry.
  6. Video: build-clips page contains real Board34 carrier/layer and fan simulation footage. New TTS succeeded. A 4:21 narrated R9 review cut is assembled and decode/contact-sheet checked; human review and final brand treatment remain open. Reject long static captures as action shots; inspect contact sheets and actual playback before choosing excerpts.

Next useful actions

  • R9 Wiki, datasheet/BOM and clips published at 4daaf8f06e345a5cc33de64a0c8636f2855bdf1d; rendered full-board hero verified. No acceptance from older revisions transfers.
  • Develop and check the real thermal assembly model; continue other deliverables while physical-only qualifications remain explicitly open.
  • Complete electronic-load functional/reference simulation coverage; maintain the assembled narrated review film as a draft until human editorial review.
  • Probing owner contribution submitted as draft PR2, stacked on existing scaffold PR1: https://wiki.adom.inc/adom/adom-aiflow-probing/prs/2. Source commit 593d65edca97812cca1d739152598bcc8138ac23; combined Rust22 and JS3 tests pass. Not merged or installed. Shared viewer performance PR remains unmerged.
  • Synchronize this plan, Wiki and dashboard after engineering progress; run finish-guard before final handoff.

Evidence and history

Current public project commit: f42ada49eafd9d88ffc29bd4357ddb01dcecd968 (R9 narrated review film and docs), following 4daaf8f06e345a5cc33de64a0c8636f2855bdf1d (R9 model, datasheet and clips).

The prior chronological plan, including superseded Board32 data, is retained in completion-plan-history-20261013.md. Treat it as history, not the current resume target. The run ledger remains append-only.

Active thermal alternative study

mechanical/passive-board34-envelope/ tests a conservative 76.0984 × 76.2 × 50.8 mm Wakefield 125319 three-inch-cut envelope on the same Board34 probing route. It is not adopted; the R9 carrier would require redesign, and catalog resistance is not an installed rating. probing-preview-passive-envelope contains the separate check. The existing R9 public model and acceptance are preserved.

Board34 passive feasibility update: the initial envelope failed with 14 head-collision episodes and three tether snags. The shifted envelope reduced this to one collision at TP16, including the landing, with zero snags; increased travel Z cannot resolve a blocked landing. A rearward envelope is being screened separately. No geometry or thermal credit has been adopted.

The isolated 0.2 mm Fields candidate completed with Q1 case rise 12.062 C and junction rise 14.372 C at 5.5 W, D1 rise 28.626 C, using catalog 1.522 K/W sink resistance and assumed contact/pad paths. This is supplied-parameter feasibility only; installed orientation, convection obstruction, contact spread, retention and sensitivity remain unresolved. Evidence: checkpoints/board34-passive-thermal-candidate/fields/fields.json.

The decoded rearward and contact-preserving passive envelopes both pass the full 221.5 s replay (zero head collisions, zero snags). The contact-preserving position is X20–96.0984, Y19–95.2, Z12.85–63.65 mm in assembly coordinates. These remain envelope studies, not adopted assemblies. Summary: mechanical/thermal-alternatives/board34-feasibility-review.json. Do not use the earlier rearward bounding-box diagnostic as final evidence.

Probing reporting correction: 3 startup rail expectations are scored against synthetic declared nominal values; the other 17 observations are UNSCORED. None is SPICE or bench circuit acceptance. Source and skill fix in probing draft PR2 through 2f5155f8191465d788c9e89d57cec52588d66f1e; three focused regression tests pass. Current local captures were regenerated with the corrected task binary; the shared package remains unchanged.

R10 prototype-design continuation

Board34 is unchanged. The original publishable R10 assembly passes 650 fastener-pair checks, fitted-body checks and carrier connectivity. R10 uses a three-inch Wakefield 125319 passive heatsink, outboard fan with 6 mm plate, rear support and blind Q1 mounting; public fin render is simplified original geometry. The exact supplier-profile local variant has already passed the complete probing replay; the original public variant replay is running separately.

Fresh 0.1 mm Fields screen in checkpoints/board34-r10-selection/fields passed current and thermal AIFlow gates. At 40 C ambient, nominal Q1 case is 52.066 C and junction 54.376 C at 5.5 W. No heatsink fan credit is used. The nominal margin is narrow; sensitivity and installed thermal qualification remain explicit later bench tasks, not a reason to leave the design workflow unfinished. Existing limits were preserved. Placement and saved-pour proofs were revalidated against the updated spec.

Board34 native manufacturing-review exports now verify two copper layers, 348 plated drills (including four slots), three nonplated holes and 91 placement coordinates/rotations. manufacturing-review/board34/review.json binds the exact PCB. Final BOM/procurement completeness and CAM/assembly review remain clearly separated from these geometric export checks.

Next: complete Fields tour and original-model replay, register new images/assembly review, finish remaining AIFlow steps and fresh finish/export/delivery, refresh project hero/datasheet and film. No physical qualification is claimed.