main
John Lauer Public-safe step pages and screenshots 8c8cf4d 1d ago

Step 16: Copper pours

pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

Visits

  • 2026-10-18T21:03:53Z
  • 2026-10-18T21:45:54Z (a return: Open the SW patch throat across (113.7, 87.3) so peak current density drops below 60 A/mm2)
  • 2026-10-18T22:06:17Z
  • 2026-10-18T22:24:52Z (a return: Widen VOUT F.Cu pour from 52 mm2 to ~70 mm2 so L1 0.12 W copper area rise drops from 60 C to ~44 C (below 55 C budget))

What the binary checked

land-pours

  • after: B.Cu 512.43; F.Cu 459.98
  • before: B.Cu 512.43; F.Cu 459.94
  • coverageAfter: B.Cu 91.51; F.Cu 82.14
  • failed: 0 item(s)
  • groups: 1 item(s)

Screenshots and drawings

start

start

end

end

start

start

end

end

start

start

end

end

start

start

end

end

Clips

AI usage (Google Antigravity)

66 model calls: 195,444 fresh input, 12,412,488 cached input and 38,517 output tokens.