Step 13: Placement
place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here
Visits
- 2026-10-18T19:47:49Z
- 2026-10-18T20:30:29Z (a return: Move C5 and TP3 next to L1.1 and U1.2 so total SW trace length is under 12 mm)
What the binary checked
place-land
- accepted: 28
- parts: 28
Screenshots and drawings
start

start

end

Clips
AI usage (Google Antigravity)
108 model calls: 437,895 fresh input, 15,923,237 cached input and 98,303 output tokens.