main
History Download
Drew Owens Fix contralateral leg-frame and torso-shell CAD bug, regenerate single-solid STLs/GLB/Bambu/MJCF/USD/clearance, and ali… 9a64946

Microgoose 7-Stage Sim-to-Real Locomotion Stack

This directory holds generated plots and diagnostics from the Microgoose reinforcement learning and sim-to-real pipeline (rl/):

  1. Stage 1 (bam_xl330_fit.png): Multi-mass pendulum identification of the Dynamixel XL330-M288-T actuator following Rhoban/bam (reflected rotor armature 3.44e-4 kg m^2, Coulomb stiction 0.024 N m, viscous damping 0.0067 N m s/rad, gear backlash deadzone 4.45 mrad, servo KP/KD, 5.0 V Spine bus droop, and 2 ms UART transport delay), paired with CAD-derived MJCF (rl/assets/microgoose.xml) and URDF (rl/assets/microgoose.urdf).
  2. Stage 2 (rl/isaaclab_microgoose/): Authentic Isaac Lab 3.0 ManagerBasedRLEnvCfg and rsl_rl PPO config implementing the 61-float observation contract and 14-DoF residual position targets (action_scale = 0.25 rad at 50 Hz) with independent 15th-DoF beak_pitch control.
  3. Stage 3 (training_curves.png): Live CUDA PPO training on the NVIDIA RTX 4090 GPU across 144 parallel domain-randomized MuJoCo BAM environments.
  4. Stage 4 & 5 (sim2sim_walk_strip.png and docs/videos/microgoose-walk-sim2sim.mp4): Self-contained policy.onnx export with baked (obs - mean) / std normalization verified on CPU onnxruntime + MuJoCo (OCCT CAD mass/inertia tensors from mechanical/kinematics_mass_props.json) over a 10-second walk (1.55 m forward +X, 1.80 m straight-line distance as the walk veers about 60 deg right over 10 s; max_tilt = 0.2675 rad / 15.33 deg, 30.3 mm left / 33.2 mm right peak swing clearance) with a t = 4.0 s +0.18 m/s lateral impulse push.
  5. Stage 7 (rl/arena/arena_scorecard.json): Standardized 32-rollout Policy Arena scorecard (87.06 / 100, 100.0% survival across all suites) covering standing (98.5), 0.15 m/s forward walking (86.8), +0.40 rad/s yaw turning (76.0), and bidirectional push recovery (87.0).