main
Drew Owens clips: 28 clip(s), export b459016

Build clips: run microgoose-spine-claude-20261111-1934

Every step of the adom-aiflow run records its own clip. This page is rebuilt and pushed as each clip stops, so it can stay open in a browser tab while the build runs.

Last updated 2026-11-12 22:12 UTC. 28 clip(s).

# step visit recorded links state
1 schematic 1 2026-11-11 20:53 UTC clip, 10x, action, sheet ok
2 library 1 (back) 2026-11-11 21:01 UTC clip, 10x, action, sheet ok
3 schematic 2 2026-11-11 21:04 UTC clip, 10x, action, sheet ok
4 library 2 (back) 2026-11-11 21:07 UTC clip, 10x, action, sheet ok
5 schematic 3 2026-11-11 21:08 UTC clip, 10x, action, sheet ok
6 simulation 1 2026-11-11 21:59 UTC clip, 10x, action, sheet ok
7 components 1 2026-11-11 22:07 UTC clip, 10x, action, sheet ok
8 models 1 2026-11-11 22:15 UTC clip, 10x, action, sheet ok
9 placement 1 2026-11-11 22:19 UTC clip, 10x, action, sheet ok
10 routing 1 2026-11-11 22:32 UTC clip, 10x, action, sheet ok
11 placement 2 (back) 2026-11-11 22:48 UTC clip, 10x, action, sheet ok
12 thermal-vias 1 2026-11-12 18:51 UTC clip, 10x, action, sheet ok
13 pours 1 2026-11-12 18:58 UTC clip, 10x, action, sheet ok
14 outline 1 2026-11-12 19:08 UTC clip, 10x, action, sheet ok
15 current 1 2026-11-12 19:12 UTC clip, 10x, action, sheet ok
16 pours 2 (back) 2026-11-12 19:26 UTC clip, 10x, action, sheet ok
17 outline 2 2026-11-12 19:48 UTC clip, 10x, action, sheet ok
18 current 2 2026-11-12 19:49 UTC clip, 10x, action, sheet ok
19 pours 3 (back) 2026-11-12 20:04 UTC clip, 10x, action, sheet ok
20 outline 3 2026-11-12 20:17 UTC clip, 10x, action, sheet ok
21 current 3 2026-11-12 20:17 UTC clip, 10x, action, sheet ok
22 thermal 1 2026-11-12 20:22 UTC clip, 10x, action, sheet ok
23 nets 1 2026-11-12 20:23 UTC clip, 10x, action, sheet ok
24 (not in the manifest) - 2026-11-12 20:40 UTC clip, 10x, action, sheet ok
25 3d 1 2026-11-12 21:03 UTC clip, 10x, action, sheet ok
26 export 1 2026-11-12 21:03 UTC clip, 10x, action, sheet ok
27 finish 1 2026-11-12 21:15 UTC clip, 10x, action, sheet ok
28 export 2 2026-11-12 21:44 UTC clip see note

Clip 1: schematic

Step schematic, visit 1. Recorded 2026-11-11 20:53 UTC, 79 min after the prompt, 7 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 1 contact sheet

Raw recording: window-590992-20261111-205351.mp4, 205 MB, kept with the run (not uploaded).

Clip 2: library

Step library, visit 1. Recorded 2026-11-11 21:01 UTC, 86 min after the prompt, 3.1 min long. Back because: Record pcm check proof under canonical kicad-new step library. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 2 contact sheet

Raw recording: window-590992-20261111-210056.mp4, 93 MB, kept with the run (not uploaded).

Clip 3: schematic

Step schematic, visit 2. Recorded 2026-11-11 21:04 UTC, 89 min after the prompt, 3.5 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 3 contact sheet

Raw recording: window-590992-20261111-210407.mp4, 118 MB, kept with the run (not uploaded).

Clip 4: library

Step library, visit 2. Recorded 2026-11-11 21:07 UTC, 93 min after the prompt, 0.3 min long. Back because: Record pcm check inside canonical library step. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 4 contact sheet

Raw recording: window-590992-20261111-210745.mp4, 11 MB, kept with the run (not uploaded).

Clip 5: schematic

Step schematic, visit 3. Recorded 2026-11-11 21:08 UTC, 94 min after the prompt, 50.8 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 5 contact sheet

Raw recording: window-590992-20261111-210817.mp4, 1667 MB, kept with the run (not uploaded).

Clip 6: simulation

Step simulation, visit 1. Recorded 2026-11-11 21:59 UTC, 144 min after the prompt, 8 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 6 contact sheet

Raw recording: window-590992-20261111-215909.mp4, 268 MB, kept with the run (not uploaded).

Clip 7: components

Step components, visit 1. Recorded 2026-11-11 22:07 UTC, 153 min after the prompt, 8.2 min long.

Contact sheet (nine frames): clip 7 contact sheet

Raw recording: window-590992-20261111-220711.mp4, 283 MB, kept with the run (not uploaded).

Clip 8: models

Step models, visit 1. Recorded 2026-11-11 22:15 UTC, 161 min after the prompt, 4.4 min long.

Contact sheet (nine frames): clip 8 contact sheet

Raw recording: window-590992-20261111-221526.mp4, 149 MB, kept with the run (not uploaded).

Clip 9: placement

Step placement, visit 1. Recorded 2026-11-11 22:19 UTC, 165 min after the prompt, 12.5 min long. Filmed: microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 9 contact sheet

Raw recording: window-15926726-20261111-221948.mp4, 367 MB, kept with the run (not uploaded).

Clip 10: routing

Step routing, visit 1. Recorded 2026-11-11 22:32 UTC, 178 min after the prompt, 15.6 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 10 contact sheet

Raw recording: window-15926726-20261111-223218.mp4, 518 MB, kept with the run (not uploaded).

Clip 11: placement

Step placement, visit 2. Recorded 2026-11-11 22:48 UTC, 193 min after the prompt, 1.4 min long. Back because: Move TP3 right beside U1.8 and L1.1 so SW trace length drops from 13.7 mm to ~6 mm, well below the 12 mm switchNodeMaxLengthMm budget. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 11 contact sheet

Raw recording: window-15926726-20261111-224756.mp4, 51 MB, kept with the run (not uploaded).

Clip 12: thermal-vias

Step thermal-vias, visit 1. Recorded 2026-11-12 18:51 UTC, 1397 min after the prompt, 6.9 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 12 contact sheet

Raw recording: window-15926726-20261112-185158.mp4, 242 MB, kept with the run (not uploaded).

Clip 13: pours

Step pours, visit 1. Recorded 2026-11-12 18:58 UTC, 1404 min after the prompt, 10 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 13 contact sheet

Raw recording: window-15926726-20261112-185853.mp4, 399 MB, kept with the run (not uploaded).

Clip 14: outline

Step outline, visit 1. Recorded 2026-11-12 19:08 UTC, 1414 min after the prompt, 3.3 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 14 contact sheet

Raw recording: window-15926726-20261112-190851.mp4, 110 MB, kept with the run (not uploaded).

Clip 15: current

Step current, visit 1. Recorded 2026-11-12 19:12 UTC, 1417 min after the prompt, 12.7 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 15 contact sheet

Raw recording: window-15926726-20261112-191208.mp4, 443 MB, kept with the run (not uploaded).

Clip 16: pours

Step pours, visit 2. Recorded 2026-11-12 19:26 UTC, 1432 min after the prompt, 21.9 min long. Back because: Expand 5V_BUS, VBAT, and SW copper pours, add parallel 5V_BUS stitch vias, clear U1.2 VBAT pour throat, and refine spec.voltages/pdn so all nets pass 60 A/mm2 and 100 mV IR drop and converter hotLoop is modeled. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 16 contact sheet

Raw recording: window-15926726-20261112-192657.mp4, 732 MB, kept with the run (not uploaded).

Clip 17: outline

Step outline, visit 2. Recorded 2026-11-12 19:48 UTC, 1454 min after the prompt, 0.6 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 17 contact sheet

Raw recording: window-15926726-20261112-194855.mp4, 23 MB, kept with the run (not uploaded).

Clip 18: current

Step current, visit 2. Recorded 2026-11-12 19:49 UTC, 1455 min after the prompt, 14.7 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 18 contact sheet

Raw recording: window-15926726-20261112-194944.mp4, 640 MB, kept with the run (not uploaded).

Clip 19: pours

Step pours, visit 3. Recorded 2026-11-12 20:04 UTC, 1470 min after the prompt, 12.6 min long. Back because: Add B.Cu bypass straps for J1 5V_BUS and VBAT input wall, extend 5V_BUS NE-E pour to J2/J3/J4, and add C1..C3/C27/J4.1 solidAt so all loaded rails clear 60 A/mm2. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 19 contact sheet

Raw recording: window-15926726-20261112-200428.mp4, 497 MB, kept with the run (not uploaded).

Clip 20: outline

Step outline, visit 3. Recorded 2026-11-12 20:17 UTC, 1482 min after the prompt, 0.4 min long. Filmed: microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 20 contact sheet

Raw recording: window-15926726-20261112-201705.mp4, 19 MB, kept with the run (not uploaded).

Clip 21: current

Step current, visit 3. Recorded 2026-11-12 20:17 UTC, 1483 min after the prompt, 5 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 21 contact sheet

Raw recording: window-15926726-20261112-201735.mp4, 235 MB, kept with the run (not uploaded).

Clip 22: thermal

Step thermal, visit 1. Recorded 2026-11-12 20:22 UTC, 1488 min after the prompt, 0.1 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 22 contact sheet

Raw recording: window-15926726-20261112-202234.mp4, 7 MB, kept with the run (not uploaded).

Clip 23: nets

Step nets, visit 1. Recorded 2026-11-12 20:23 UTC, 1489 min after the prompt, 0.9 min long. Filmed: *microgoose-spine - PCB Editor.

Contact sheet (nine frames): clip 23 contact sheet

Raw recording: window-15926726-20261112-202352.mp4, 50 MB, kept with the run (not uploaded).

Clip 24: (not in the manifest)

Step (not in the manifest), visit -. Recorded 2026-11-12 20:40 UTC, 1506 min after the prompt, 22.9 min long.

Contact sheet (nine frames): clip 24 contact sheet

Raw recording: window-263878-20261112-204020.mp4, 1073 MB, kept with the run (not uploaded).

Clip 25: 3d

Step 3d, visit 1. Recorded 2026-11-12 21:03 UTC, 1528 min after the prompt, 0.2 min long.

Contact sheet (nine frames): clip 25 contact sheet

Raw recording: window-263878-20261112-210312.mp4, 8 MB, kept with the run (not uploaded).

Clip 26: export

Step export, visit 1. Recorded 2026-11-12 21:03 UTC, 1529 min after the prompt, 11.5 min long.

Contact sheet (nine frames): clip 26 contact sheet

Raw recording: window-263878-20261112-210333.mp4, 522 MB, kept with the run (not uploaded).

Clip 27: finish

Step finish, visit 1. Recorded 2026-11-12 21:15 UTC, 1540 min after the prompt, 0.4 min long.

Contact sheet (nine frames): clip 27 contact sheet

Raw recording: window-263878-20261112-211503.mp4, 20 MB, kept with the run (not uploaded).

Clip 28: export

Step export, visit 2. Recorded 2026-11-12 21:44 UTC, 1570 min after the prompt, 28 min long.

no 10x cut

Raw recording: window-263878-20261112-214419.mp4, 1109 MB, kept with the run (not uploaded).