main
Andy E clips: 8 clip(s), routing 9a927c8 13d ago

Build clips

Every step of the adom-aiflow run records its own clip. This page is rebuilt and pushed as each clip stops, so it can stay open in a browser tab while the build runs.

Last updated 2026-10-28 04:29 UTC. 8 clip(s).

# step visit recorded links state
1 rules 1 2026-10-28 01:30 UTC clip, 10x, action, sheet ok
2 design 1 2026-10-28 01:31 UTC clip, 10x, action, sheet suspect
3 test-plan 1 2026-10-28 01:33 UTC clip, 10x, action, sheet ok
4 sourcing 1 2026-10-28 01:35 UTC clip, 10x, action, sheet ok
5 library 1 2026-10-28 01:52 UTC clip, 10x, action, sheet ok
6 simulation 1 2026-10-28 03:08 UTC clip, 10x, action, sheet ok
7 placement 1 2026-10-28 03:08 UTC clip, 10x, action, sheet ok
8 routing 1 2026-10-28 03:21 UTC clip, 10x, action, sheet ok

Clip 1: rules

Step rules, visit 1. Recorded 2026-10-28 01:30 UTC, 8 min after the prompt, 1.1 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 1 contact sheet

Raw recording: window-10553590-20261028-013021.mp4, 32 MB, kept with the run (not uploaded).

Clip 2: design

Step design, visit 1. Recorded 2026-10-28 01:31 UTC, 10 min after the prompt, 1.1 min long. Filmed: Hydrogen with the run's dashboard.

suspect: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas)

Contact sheet (nine frames): clip 2 contact sheet

Raw recording: window-10553590-20261028-013144.mp4, 27 MB, kept with the run (not uploaded).

Clip 3: test-plan

Step test-plan, visit 1. Recorded 2026-10-28 01:33 UTC, 11 min after the prompt, 1.5 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 3 contact sheet

Raw recording: window-10553590-20261028-013309.mp4, 62 MB, kept with the run (not uploaded).

Clip 4: sourcing

Step sourcing, visit 1. Recorded 2026-10-28 01:35 UTC, 13 min after the prompt, 14.1 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 4 contact sheet

Raw recording: window-10553590-20261028-013505.mp4, 829 MB, kept with the run (not uploaded).

Clip 5: library

Step library, visit 1. Recorded 2026-10-28 01:52 UTC, 30 min after the prompt, 22.3 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 5 contact sheet

Raw recording: window-10553590-20261028-015203.mp4, 1927 MB, kept with the run (not uploaded).

Clip 6: simulation

Step simulation, visit 1. Recorded 2026-10-28 03:08 UTC, 107 min after the prompt, 0.2 min long. Filmed: Hydrogen with the run's dashboard.

Contact sheet (nine frames): clip 6 contact sheet

Raw recording: window-10553590-20261028-030838.mp4, 17 MB, kept with the run (not uploaded).

Clip 7: placement

Step placement, visit 1. Recorded 2026-10-28 03:08 UTC, 107 min after the prompt, 11.2 min long.

Contact sheet (nine frames): clip 7 contact sheet

Raw recording: window-91621354-20261028-030857.mp4, 356 MB, kept with the run (not uploaded).

Clip 8: routing

Step routing, visit 1. Recorded 2026-10-28 03:21 UTC, 120 min after the prompt, 61.5 min long.

Contact sheet (nine frames): clip 8 contact sheet

Raw recording: window-91621354-20261028-032129.mp4, 2519 MB, kept with the run (not uploaded).