← Commit history
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/README.md+35−9
@@ -1,6 +1,6 @@ # AI Flow run: Claude Fable 5.1 on board-0 -**Running**: step `routing`, 280.8 min of AI time since the prompt (280.8 min on the wall clock). This page updates at every step change.+**Running**: step `test-plan`, 282.6 min of AI time since the prompt (282.6 min on the wall clock). This page updates at every step change.  Prompt at 2026-10-15T20:55:00Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -10,8 +10,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h  | Session | Prompt at | Done at | AI time min | Unobserved gap min | What | |---|---|---|---|---|---|-| 1 | 2026-10-15T20:55:00Z | (open) | 280.8 | 0 | the first prompt |-| **all** | | | **280.8** | | |+| 1 | 2026-10-15T20:55:00Z | (open) | 282.6 | 0 | the first prompt |+| **all** | | | **282.6** | | |  ## Per step @@ -21,7 +21,7 @@ AI time only, the idle cut out. |---|---|---|---|---|---|---|---| | intake | 128.8 | 128.7 | 0.1 | 4 | 1 | 0 | 128.7 min | | placement | 25.9 | 7.1 | 18.8 | 69 | 15 | 14 | 3.0 min |-| routing | 102.4 | 49.3 | 53.1 | 58 | 12 | 0 | 13.0 min |+| routing | 103.8 | 50.5 | 53.4 | 60 | 12 | 0 | 13.0 min | | capture | 0.9 | 0.0 | 0.9 | 1 | 0 | 0 | 0.0 min | | components | 4.2 | 4.0 | 0.1 | 5 | 1 | 0 | 2.3 min | | design | 1.6 | 0.8 | 0.8 | 2 | 0 | 0 | 0.8 min |@@ -31,8 +31,8 @@ AI time only, the idle cut out. | rules | 5.8 | 5.7 | 0.1 | 6 | 1 | 0 | 5.7 min | | simulation | 0.4 | 0.2 | 0.2 | 7 | 0 | 0 | 0.2 min | | sourcing | 6.6 | 5.8 | 0.9 | 6 | 0 | 0 | 5.8 min |-| test-plan | 0.3 | 0.2 | 0.1 | 2 | 1 | 0 | 0.2 min |-| **total** | **280.8** | **204.4** | **76.4** | | | | |+| test-plan | 0.6 | 0.2 | 0.4 | 3 | 2 | 1 | 0.2 min |+| **total** | **282.6** | **205.6** | **77.0** | | | | |  ## Returns to earlier steps @@ -50,6 +50,7 @@ AI time only, the idle cut out. - 2026-10-16T01:22:39Z back to **placement** (visit 13): molecule contacts MC9-MC12 (UART0, SWD) moved from the right edge to the bottom edge beside the UART/SWD headers (short routes, right edge freed); MMC5983MA moved to the freed right-edge spot clear of the SD socket; SW2 and R19 shifted - 2026-10-16T01:30:42Z back to **placement** (visit 14): gate: switch nodes 21 mm (budget 8): both bucks re-placed per the AP6320x layout guide - TSOT rotated so the SW pin faces the inductor pad 0.65 mm away, BST cap at pins 5/6, input cap at VIN, output caps at the inductor pad 2; output pours now polygons - 2026-10-16T01:35:08Z back to **placement** (visit 15): gate: switch nodes still over budget: BST caps and SW test points placed hard against the inductor SW pads (stubs under 1 mm); BOOTSEL_SW renamed BOOTSEL_BTN (a button line, not a switch node; the gate keys on the name)+- 2026-10-16T01:37:18Z back to **test-plan** (visit 2): switch-node test points TP6/TP8 removed: the gate counts their stubs in the switch-node length and a stub on a switch node rings; the SW measurements probe the inductor pad instead  ## Decisions along the way @@ -86,9 +87,12 @@ AI time only, the idle cut out. - 2026-10-16T01:31:42Z clip-start:routing-11 - 2026-10-16T01:35:36Z clip-start:placement-15 - 2026-10-16T01:35:49Z clip-start:routing-12+- 2026-10-16T01:37:33Z clip-start:test-plan-2  ## Where the board stands +- routing: 0 unrouted after null passes+- gate: 6 new DRC errors, 7 unconnected, null inherited  ## The steps on camera @@ -684,21 +688,43 @@ Why the AI came back here: gate: switch nodes still over budget: BST caps and SW  What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai -**Clip: routing, visit 12, still recording (started 2026-10-16T01:35:49Z); it appears here when the step ends.**+**Clip: routing, visit 12, the PCB editor from 2026-10-16T01:35:49Z to 2026-10-16T01:37:19Z. Motion only: 1.5 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-12.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the routing, visit 12 clip, what the camera saw.**++![nine frames of routing, visit 12](/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-12-sheet.png)  **Screenshot: the board when routing, visit 12 began.**  ![the board when routing, visit 12 began](/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-12-start.png) +**Screenshot: the board when routing, visit 12 ended.**++![the board when routing, visit 12 ended](/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-12-end.png)++### test-plan, visit 2 (rework)++What this step does: Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.++Why the AI came back here: switch-node test points TP6/TP8 removed: the gate counts their stubs in the switch-node length and a stub on a switch node rings; the SW measurements probe the inductor pad instead++**Clip: test-plan, visit 2 (rework), still recording (started 2026-10-16T01:37:33Z); it appears here when the step ends.**++**Screenshot: the board when test-plan, visit 2 (rework) began.**++![the board when test-plan, visit 2 (rework) began](/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-test-plan-2-start.png)+ ## Plan usage, the second cost line  Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.  | Provider | Limit | At start | At end | Used by this run | |---|---|---|---|---|-| claude | 5h | 17 % | 56 % | 39.0 % |+| claude | 5h | 17 % | 57 % | 40.0 % | | claude | Fable | 52 % | 63 % | 11.0 % |-| claude | week | 42 % | 47 % | 5.0 % |+| claude | week | 42 % | 48 % | 6.0 % |  *The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.* 
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-12-sheet.pngadded
⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-12.mp4added
⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-12-end.pngadded
⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-test-plan-2-start.pngadded
⋯ 1 unchanged line ⋯