molecule
AFS_Adom flight computer molecule
Public Unreviewedby ae007
Active fin stabilization flight computer for a sounding rocket, a clean-room AI redesign of the Rice Eclipse AFS board: RP2350B, ICM-45686, KX134-1211, MMC5983MA, MS5611, TMP117, INA219A, 8 servos, 2S LiPo, USB-C; 4-layer Adom molecule, designed end to end by Claude through KiCad and adom-aiflow
← Commit history
aiflow run AFS_Adom-claude-fable-5-1-20261015-2055: placement
5 files changed
+34−7
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/README.md+34−7docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-1-sheet.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-1.mp4docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-placement-2-start.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-1-end.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/README.md+34−7@@ -1,6 +1,6 @@ # AI Flow run: Claude Fable 5.1 on board-0 -**Running**: step `routing`, 153.8 min of AI time since the prompt (153.8 min on the wall clock). This page updates at every step change.+**Running**: step `placement`, 154.3 min of AI time since the prompt (154.3 min on the wall clock). This page updates at every step change. Prompt at 2026-10-15T20:55:00Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -10,8 +10,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | Session | Prompt at | Done at | AI time min | Unobserved gap min | What | |---|---|---|---|---|---|-| 1 | 2026-10-15T20:55:00Z | (open) | 153.8 | 0 | the first prompt |-| **all** | | | **153.8** | | |+| 1 | 2026-10-15T20:55:00Z | (open) | 154.3 | 0 | the first prompt |+| **all** | | | **154.3** | | | ## Per step @@ -20,8 +20,8 @@ AI time only, the idle cut out. | Step | AI min | AI thinking min | Tool min | Turns | Visits | Returns | Longest think | |---|---|---|---|---|---|---|---| | intake | 128.8 | 128.7 | 0.1 | 4 | 1 | 0 | 128.7 min |-| placement | 1.0 | 0.8 | 0.2 | 4 | 1 | 0 | 0.5 min |-| routing | 0.2 | 0.0 | 0.2 | 1 | 1 | 0 | 0.0 min |+| placement | 1.1 | 0.8 | 0.3 | 5 | 2 | 1 | 0.5 min |+| routing | 0.6 | 0.4 | 0.2 | 2 | 1 | 0 | 0.4 min | | capture | 0.9 | 0.0 | 0.9 | 1 | 0 | 0 | 0.0 min | | components | 4.2 | 4.0 | 0.1 | 5 | 1 | 0 | 2.3 min | | design | 1.6 | 0.8 | 0.8 | 2 | 0 | 0 | 0.8 min |@@ -32,7 +32,11 @@ AI time only, the idle cut out. | simulation | 0.4 | 0.2 | 0.2 | 7 | 0 | 0 | 0.2 min | | sourcing | 6.6 | 5.8 | 0.9 | 6 | 0 | 0 | 5.8 min | | test-plan | 0.3 | 0.2 | 0.1 | 2 | 1 | 0 | 0.2 min |-| **total** | **153.8** | **148.8** | **5.0** | | | | |+| **total** | **154.3** | **149.2** | **5.1** | | | | |++## Returns to earlier steps++- 2026-10-15T23:29:10Z back to **placement** (visit 2): place verify refused the XT30 courtyard overhang at the left edge; recorded it as a reviewed edge connector in the spec ## Decisions along the way @@ -44,6 +48,7 @@ AI time only, the idle cut out. - 2026-10-15T23:27:23Z clip-start:test-plan-1 - 2026-10-15T23:27:40Z clip-start:placement-1 - 2026-10-15T23:28:43Z clip-start:routing-1+- 2026-10-15T23:29:15Z clip-start:placement-2 ## Where the board stands @@ -164,12 +169,34 @@ What this step does: place the parts for routability, current and heat; the bina What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai -**Clip: routing, still recording (started 2026-10-15T23:28:43Z); it appears here when the step ends.**+**Clip: routing, the PCB editor from 2026-10-15T23:28:43Z to 2026-10-15T23:29:11Z. Motion only: 0.5 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-1.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the routing clip, what the camera saw.**++ **Screenshot: the board when routing began.**  +**Screenshot: the board when routing ended.**++++### placement, visit 2 (rework)++What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here++Why the AI came back here: place verify refused the XT30 courtyard overhang at the left edge; recorded it as a reviewed edge connector in the spec++**Clip: placement, visit 2 (rework), still recording (started 2026-10-15T23:29:15Z); it appears here when the step ends.**++**Screenshot: the board when placement, visit 2 (rework) began.**+++ ## Plan usage, the second cost line Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-1-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/routing-1.mp4added⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-placement-2-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-1-end.pngadded⋯ 1 unchanged line ⋯