molecule
AFS_Adom flight computer molecule
Public Unreviewedby ae007
Active fin stabilization flight computer for a sounding rocket, a clean-room AI redesign of the Rice Eclipse AFS board: RP2350B, ICM-45686, KX134-1211, MMC5983MA, MS5611, TMP117, INA219A, 8 servos, 2S LiPo, USB-C; 4-layer Adom molecule, designed end to end by Claude through KiCad and adom-aiflow
← Commit history
aiflow run AFS_Adom-claude-fable-5-1-20261015-2055: routing
5 files changed
+30−7
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/README.md+30−7docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/placement-6-sheet.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/placement-6.mp4docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-placement-6-end.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-5-start.pngdocs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/README.md+30−7@@ -1,6 +1,6 @@ # AI Flow run: Claude Fable 5.1 on board-0 -**Running**: step `placement`, 211.4 min of AI time since the prompt (211.4 min on the wall clock). This page updates at every step change.+**Running**: step `routing`, 211.5 min of AI time since the prompt (211.5 min on the wall clock). This page updates at every step change. Prompt at 2026-10-15T20:55:00Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -10,8 +10,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | Session | Prompt at | Done at | AI time min | Unobserved gap min | What | |---|---|---|---|---|---|-| 1 | 2026-10-15T20:55:00Z | (open) | 211.4 | 0 | the first prompt |-| **all** | | | **211.4** | | |+| 1 | 2026-10-15T20:55:00Z | (open) | 211.5 | 0 | the first prompt |+| **all** | | | **211.5** | | | ## Per step @@ -20,8 +20,8 @@ AI time only, the idle cut out. | Step | AI min | AI thinking min | Tool min | Turns | Visits | Returns | Longest think | |---|---|---|---|---|---|---|---| | intake | 128.8 | 128.7 | 0.1 | 4 | 1 | 0 | 128.7 min |-| placement | 15.3 | 5.8 | 9.6 | 34 | 6 | 5 | 3.0 min |-| routing | 43.5 | 20.4 | 23.1 | 20 | 4 | 0 | 6.9 min |+| placement | 15.4 | 5.8 | 9.6 | 36 | 6 | 5 | 3.0 min |+| routing | 43.5 | 20.4 | 23.1 | 21 | 5 | 0 | 6.9 min | | capture | 0.9 | 0.0 | 0.9 | 1 | 0 | 0 | 0.0 min | | components | 4.2 | 4.0 | 0.1 | 5 | 1 | 0 | 2.3 min | | design | 1.6 | 0.8 | 0.8 | 2 | 0 | 0 | 0.8 min |@@ -32,7 +32,7 @@ AI time only, the idle cut out. | simulation | 0.4 | 0.2 | 0.2 | 7 | 0 | 0 | 0.2 min | | sourcing | 6.6 | 5.8 | 0.9 | 6 | 0 | 0 | 5.8 min | | test-plan | 0.3 | 0.2 | 0.1 | 2 | 1 | 0 | 0.2 min |-| **total** | **211.4** | **174.2** | **37.2** | | | | |+| **total** | **211.5** | **174.2** | **37.4** | | | | | ## Returns to earlier steps @@ -60,6 +60,7 @@ AI time only, the idle cut out. - 2026-10-16T00:11:26Z clip-start:routing-4 - 2026-10-16T00:24:40Z clip-start:placement-5 - 2026-10-16T00:26:21Z clip-start:placement-6+- 2026-10-16T00:26:31Z clip-start:routing-5 ## Where the board stands @@ -330,12 +331,34 @@ What this step does: place the parts for routability, current and heat; the bina Why the AI came back here: RP2350 fan-out pre-routed as board copper (3-row via fan-out, standard for 0.4 mm QFN); IOVDD/DVDD caps moved 0.1 mm out for hole clearance to the row-C vias; C27 kept at its explicit spot -**Clip: placement, visit 6 (rework), still recording (started 2026-10-16T00:26:21Z); it appears here when the step ends.**+**This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.**++**Clip: placement, visit 6 (rework), the PCB editor from 2026-10-16T00:26:21Z to 2026-10-16T00:26:28Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/afs-adom/docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/placement-6.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the placement, visit 6 (rework) clip, what the camera saw.**++ **Screenshot: the board when placement, visit 6 (rework) began.**  +**Screenshot: the board when placement, visit 6 (rework) ended.**++++### routing, visit 5++What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai++**Clip: routing, visit 5, still recording (started 2026-10-16T00:26:31Z); it appears here when the step ends.**++**Screenshot: the board when routing, visit 5 began.**+++ ## Plan usage, the second cost line Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/placement-6-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/placement-6.mp4added⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-placement-6-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/AFS_Adom-claude-fable-5-1-20261015-2055/shot-routing-5-start.pngadded⋯ 1 unchanged line ⋯