app
Google Antigravity
Public Made by Adomby adom
Google Antigravity in Adom Hydrogen: the editor extension, the agy CLI and a dock dashboard that installs both into your container.
main
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061
WEBVTT
00:00:05.513 --> 00:00:06.206
Revision two.
00:00:06.256 --> 00:00:13.269
Asked for its own design review, Argon found its first board was missing input damping and had optimistic capacitors.
00:00:13.319 --> 00:00:17.730
Here it fixes them, proving the circuit before it builds the board.
00:00:18.980 --> 00:00:21.256
Revision two starts with the circuit.
00:00:21.306 --> 00:00:34.821
Argon read Samsung's measured DC-bias curves: its output capacitors keep only twenty-nine percent at five volts, so it added a fourth and cut the feedforward capacitor to hold the loop under TI's forty kilohertz limit.
00:00:34.871 --> 00:00:38.697
On the input it added a damped forty-seven microfarad electrolytic.
00:00:38.747 --> 00:00:48.387
In simulation, a sixteen volt hot-plug that rang to thirty-one volts now settles at seventeen, and start-up and the load step stay inside their limits.
00:00:48.437 --> 00:00:49.550
Then the board.
00:00:51.113 --> 00:00:53.511
Then the board, live in KiCad.
00:00:53.561 --> 00:00:57.591
Argon placed the parts one at a time through kicad-bridge.
00:00:57.641 --> 00:01:05.342
This time the bootstrap capacitor sits right beside the regulator, and the new forty-seven microfarad electrolytic guards the input.
00:01:05.392 --> 00:01:15.541
aiflow's router closed every connection in five passes, the design-rule gate passed clean, and Argon landed all fifty traces in KiCad, one undo step each.
00:01:15.591 --> 00:01:19.213
The switch-node budget stays at the original twelve millimeters.
00:01:22.131 --> 00:01:24.728
Then the analysis, measured from the board.
00:01:24.778 --> 00:01:35.314
Adom Fields flagged the ground and then the input rail over sixty amps per square millimeter, and Argon widened the copper in KiCad until every power net passed.
00:01:35.364 --> 00:01:39.473
Thermal flagged the inductor again, fifty-three degrees on the switch node.
00:01:39.523 --> 00:01:49.681
This time Argon changed the board, not the budget: fifty-four square millimeters of switch-node copper on both layers, stitched with vias, and the rise fell to thirty-two.
00:01:53.149 --> 00:02:02.574
The silkscreen was audited on the board's real pad and via geometry, and the 3D walkthrough shows the real parts, with the new electrolytic guarding the input.
00:02:02.624 --> 00:02:07.487
Every check on aiflow's finish line passed, with no change to the frozen budgets.
00:02:07.537 --> 00:02:15.559
Revision two: a circuit proven first, from the parts' own data, then a board built live in KiCad and ready for the fab.