John Lauer Rev 2 clips 16-17, stitched video and captions 2f63de9 6d ago
1
00:00:05,513 --> 00:00:06,206
Revision two.

2
00:00:06,256 --> 00:00:13,269
Asked for its own design review, Argon found its first board was missing input damping and had optimistic capacitors.

3
00:00:13,319 --> 00:00:17,730
Here it fixes them, proving the circuit before it builds the board.

4
00:00:18,980 --> 00:00:21,256
Revision two starts with the circuit.

5
00:00:21,306 --> 00:00:34,821
Argon read Samsung's measured DC-bias curves: its output capacitors keep only twenty-nine percent at five volts, so it added a fourth and cut the feedforward capacitor to hold the loop under TI's forty kilohertz limit.

6
00:00:34,871 --> 00:00:38,697
On the input it added a damped forty-seven microfarad electrolytic.

7
00:00:38,747 --> 00:00:48,387
In simulation, a sixteen volt hot-plug that rang to thirty-one volts now settles at seventeen, and start-up and the load step stay inside their limits.

8
00:00:48,437 --> 00:00:49,550
Then the board.

9
00:00:51,113 --> 00:00:53,511
Then the board, live in KiCad.

10
00:00:53,561 --> 00:00:57,591
Argon placed the parts one at a time through kicad-bridge.

11
00:00:57,641 --> 00:01:05,342
This time the bootstrap capacitor sits right beside the regulator, and the new forty-seven microfarad electrolytic guards the input.

12
00:01:05,392 --> 00:01:15,541
aiflow's router closed every connection in five passes, the design-rule gate passed clean, and Argon landed all fifty traces in KiCad, one undo step each.

13
00:01:15,591 --> 00:01:19,213
The switch-node budget stays at the original twelve millimeters.

14
00:01:22,131 --> 00:01:24,728
Then the analysis, measured from the board.

15
00:01:24,778 --> 00:01:35,314
Adom Fields flagged the ground and then the input rail over sixty amps per square millimeter, and Argon widened the copper in KiCad until every power net passed.

16
00:01:35,364 --> 00:01:39,473
Thermal flagged the inductor again, fifty-three degrees on the switch node.

17
00:01:39,523 --> 00:01:49,681
This time Argon changed the board, not the budget: fifty-four square millimeters of switch-node copper on both layers, stitched with vias, and the rise fell to thirty-two.

18
00:01:53,149 --> 00:02:02,574
The silkscreen was audited on the board's real pad and via geometry, and the 3D walkthrough shows the real parts, with the new electrolytic guarding the input.

19
00:02:02,624 --> 00:02:07,487
Every check on aiflow's finish line passed, with no change to the frozen budgets.

20
00:02:07,537 --> 00:02:15,559
Revision two: a circuit proven first, from the parts' own data, then a board built live in KiCad and ready for the fab.