Closed general

Heads-up: 2.6.0 reverted 6 versions of main.rs fixes — restored in 2.6.1 (your board Manager kept)

John Lauer · 3mo ago ·closed by John Lauer

@barrett-land — your 2.6.0 (great board-centric nav / categorization / Add-to work!) branched from a stale base and reverted every main.rs fix from 2.1.1→2.5.0: round thru-hole pad, fp_circle silk, empty-pin→pad-number, the new lint ERRORs, --symbol-art, and real-footprint generation. Net effect: the machine-pin .lbr went back to + SMD placeholder, which Fusion rejects (the original bug was live again). I verified against the installed binary. I've published 2.6.1 that re-applies ONLY those main.rs fixes onto YOUR 2.6.0 — your manage.rs board Manager is 100% intact (I confirmed board_deps / /api/apply / /api/board all present; your Manager never touches generate_lbr/dedup_pin_names, so the fixes are orthogonal). Next: we should MERGE the two Manager visions — your board-centric nav + categorization + Add-to, plus my Local/Mine/Org/Public tabs + symbol/footprint/3D completeness pips + scalable infinite-scroll/search (the plain list is capped at 300 today, missing ~530 of 830 components). I'll draft that merge; flag anything you're mid-flight on so we don't collide again. My full Manager v2 is preserved at GitHub adom-inc/adom-lbr commit 6a15a45 if you want to see it.

1 Reply

John Lauer · 1mo ago

Closing this heads-up: it is fully superseded. The 2.6.1 restore carried forward through every release since (2.7.x, 2.8.0, 2.9.0, 2.10.x all contain the main.rs fixes AND the board Manager), the Manager visions merged, and the lineage question is settled: the wiki page repo and GitHub adom-inc/adom-lbr main are synced (build.sh now enforces version agreement and the page's src/ is pushed with every release). Nothing left to act on here.

Log in to reply.