Record six R11 clip approvals and assemble caption-clean review chapter
5962882
{
"video": "/adom/adom-custom-electronic-load/render/videos/compact-r11/chapter/approved/r11-approved-chapter.mp4",
"title": "R11 approved design-progression chapter",
"captions": "WEBVTT\n\n00:00:00.000 --> 00:00:03.031\nThe compact revision is 72 millimeters square.\n\n00:00:03.436 --> 00:00:05.617\nLarge corner pins stay on the scaffold grid,\n\n00:00:05.931 --> 00:00:07.773\nand USB-C sits at the edge.\n\n00:00:08.178 --> 00:00:11.505\nThe four-wire fan connector and its control circuit\nare now routed.\n\n00:00:11.910 --> 00:00:13.315\nThis is a geometry review;\n\n00:00:13.703 --> 00:00:15.495\ncooling qualification is still open.\n\n00:00:15.600 --> 00:00:19.573\nThe new fan has separate speed feedback\nand PWM control wires.\n\n00:00:20.018 --> 00:00:24.191\nIts digital twin keeps the housing and wires fixed\nwhile the rotor turns.\n\n00:00:24.645 --> 00:00:27.311\nThe simulated cycle gently varies the speed\n\n00:00:27.593 --> 00:00:28.653\nand returns to rest.\n\n00:00:29.108 --> 00:00:31.035\nThe animation runs in slow motion;\n\n00:00:31.361 --> 00:00:33.731\nmeasured cooling still needs an actual test.\n\n00:00:33.840 --> 00:00:36.440\nThe thermal model needs the complete heat path:\n\n00:00:36.870 --> 00:00:39.490\nfrom Q1, through its insulating interface,\n\n00:00:39.750 --> 00:00:41.790\ninto the heatsink, and out to the air.\n\n00:00:42.230 --> 00:00:45.460\nThis comparison uses explicit cooling assumptions.\n\n00:00:45.900 --> 00:00:47.830\nIt shows why fan failure matters,\n\n00:00:48.110 --> 00:00:51.850\nbut it does not qualify the assembly\nor increase our five-watt rating.\n\n00:00:51.973 --> 00:00:53.773\nThe bare board cleared the probes,\n\n00:00:54.043 --> 00:00:55.933\nbut adding the cooler exposed a bug:\n\n00:00:56.243 --> 00:00:58.263\nthe checker was skipping large objects.\n\n00:00:58.693 --> 00:01:02.863\nAfter fixing it, the replay found real collisions\nand wire snags.\n\n00:01:03.293 --> 00:01:05.533\nThat sends this design back to placement,\n\n00:01:05.893 --> 00:01:10.413\nwhere we move the probe ground and the five-volt\ntest point into the access corridor.\n\n00:01:10.540 --> 00:01:12.751\nWe turned the fan toward the side of the board,\n\n00:01:13.114 --> 00:01:15.615\nand rotated the molecule to suit the probe head.\n\n00:01:16.029 --> 00:01:18.928\nA new ground contact position keeps the tether clear.\n\n00:01:19.372 --> 00:01:21.977\nThe revised board passes native rule checks,\n\n00:01:22.305 --> 00:01:24.927\nand the replay clears these cooling envelopes.\n\n00:01:25.368 --> 00:01:28.710\nThe mounting hardware and fan harness\nstill need their own review.\n\n00:01:28.998 --> 00:01:31.899\nThese are calculated current densities\non the revised copper.\n\n00:01:32.328 --> 00:01:34.000\nAll six networks pass the screen.\n\n00:01:34.411 --> 00:01:36.296\nCooling qualification is still open.\n",
"chapters": [
{
"t": 0,
"title": "Compact PCB revision"
},
{
"t": 15.6,
"title": "RPM-controlled fan digital twin (simulated)"
},
{
"t": 33.84,
"title": "Q1 external heat path: assumptions versus qualification"
},
{
"t": 51.973,
"title": "Probe checker repair sends the board back to placement"
},
{
"t": 70.54,
"title": "Side-fan layout clears the nominal probe replay"
},
{
"t": 88.84,
"title": "Fresh v5 current screen"
}
]
}