main
John Lauer Record six R11 clip approvals and assemble caption-clean review chapter 5962882
WEBVTT

00:00:00.000 --> 00:00:03.031
The compact revision is 72 millimeters square.

00:00:03.436 --> 00:00:05.617
Large corner pins stay on the scaffold grid,

00:00:05.931 --> 00:00:07.773
and USB-C sits at the edge.

00:00:08.178 --> 00:00:11.505
The four-wire fan connector and its control circuit
are now routed.

00:00:11.910 --> 00:00:13.315
This is a geometry review;

00:00:13.703 --> 00:00:15.495
cooling qualification is still open.

00:00:15.600 --> 00:00:19.573
The new fan has separate speed feedback
and PWM control wires.

00:00:20.018 --> 00:00:24.191
Its digital twin keeps the housing and wires fixed
while the rotor turns.

00:00:24.645 --> 00:00:27.311
The simulated cycle gently varies the speed

00:00:27.593 --> 00:00:28.653
and returns to rest.

00:00:29.108 --> 00:00:31.035
The animation runs in slow motion;

00:00:31.361 --> 00:00:33.731
measured cooling still needs an actual test.

00:00:33.840 --> 00:00:36.440
The thermal model needs the complete heat path:

00:00:36.870 --> 00:00:39.490
from Q1, through its insulating interface,

00:00:39.750 --> 00:00:41.790
into the heatsink, and out to the air.

00:00:42.230 --> 00:00:45.460
This comparison uses explicit cooling assumptions.

00:00:45.900 --> 00:00:47.830
It shows why fan failure matters,

00:00:48.110 --> 00:00:51.850
but it does not qualify the assembly
or increase our five-watt rating.

00:00:51.973 --> 00:00:53.773
The bare board cleared the probes,

00:00:54.043 --> 00:00:55.933
but adding the cooler exposed a bug:

00:00:56.243 --> 00:00:58.263
the checker was skipping large objects.

00:00:58.693 --> 00:01:02.863
After fixing it, the replay found real collisions
and wire snags.

00:01:03.293 --> 00:01:05.533
That sends this design back to placement,

00:01:05.893 --> 00:01:10.413
where we move the probe ground and the five-volt
test point into the access corridor.

00:01:10.540 --> 00:01:12.751
We turned the fan toward the side of the board,

00:01:13.114 --> 00:01:15.615
and rotated the molecule to suit the probe head.

00:01:16.029 --> 00:01:18.928
A new ground contact position keeps the tether clear.

00:01:19.372 --> 00:01:21.977
The revised board passes native rule checks,

00:01:22.305 --> 00:01:24.927
and the replay clears these cooling envelopes.

00:01:25.368 --> 00:01:28.710
The mounting hardware and fan harness
still need their own review.

00:01:28.998 --> 00:01:31.899
These are calculated current densities
on the revised copper.

00:01:32.328 --> 00:01:34.000
All six networks pass the screen.

00:01:34.411 --> 00:01:36.296
Cooling qualification is still open.