John Lauer Record six R11 clip approvals and assemble caption-clean review chapter 5962882
1
00:00:00,000 --> 00:00:03,031
The compact revision is 72 millimeters square.

2
00:00:03,436 --> 00:00:05,617
Large corner pins stay on the scaffold grid,

3
00:00:05,931 --> 00:00:07,773
and USB-C sits at the edge.

4
00:00:08,178 --> 00:00:11,505
The four-wire fan connector and its control circuit
are now routed.

5
00:00:11,910 --> 00:00:13,315
This is a geometry review;

6
00:00:13,703 --> 00:00:15,495
cooling qualification is still open.

7
00:00:15,600 --> 00:00:19,573
The new fan has separate speed feedback
and PWM control wires.

8
00:00:20,018 --> 00:00:24,191
Its digital twin keeps the housing and wires fixed
while the rotor turns.

9
00:00:24,645 --> 00:00:27,311
The simulated cycle gently varies the speed

10
00:00:27,593 --> 00:00:28,653
and returns to rest.

11
00:00:29,108 --> 00:00:31,035
The animation runs in slow motion;

12
00:00:31,361 --> 00:00:33,731
measured cooling still needs an actual test.

13
00:00:33,840 --> 00:00:36,440
The thermal model needs the complete heat path:

14
00:00:36,870 --> 00:00:39,490
from Q1, through its insulating interface,

15
00:00:39,750 --> 00:00:41,790
into the heatsink, and out to the air.

16
00:00:42,230 --> 00:00:45,460
This comparison uses explicit cooling assumptions.

17
00:00:45,900 --> 00:00:47,830
It shows why fan failure matters,

18
00:00:48,110 --> 00:00:51,850
but it does not qualify the assembly
or increase our five-watt rating.

19
00:00:51,973 --> 00:00:53,773
The bare board cleared the probes,

20
00:00:54,043 --> 00:00:55,933
but adding the cooler exposed a bug:

21
00:00:56,243 --> 00:00:58,263
the checker was skipping large objects.

22
00:00:58,693 --> 00:01:02,863
After fixing it, the replay found real collisions
and wire snags.

23
00:01:03,293 --> 00:01:05,533
That sends this design back to placement,

24
00:01:05,893 --> 00:01:10,413
where we move the probe ground and the five-volt
test point into the access corridor.

25
00:01:10,540 --> 00:01:12,751
We turned the fan toward the side of the board,

26
00:01:13,114 --> 00:01:15,615
and rotated the molecule to suit the probe head.

27
00:01:16,029 --> 00:01:18,928
A new ground contact position keeps the tether clear.

28
00:01:19,372 --> 00:01:21,977
The revised board passes native rule checks,

29
00:01:22,305 --> 00:01:24,927
and the replay clears these cooling envelopes.

30
00:01:25,368 --> 00:01:28,710
The mounting hardware and fan harness
still need their own review.

31
00:01:28,998 --> 00:01:31,899
These are calculated current densities
on the revised copper.

32
00:01:32,328 --> 00:01:34,000
All six networks pass the screen.

33
00:01:34,411 --> 00:01:36,296
Cooling qualification is still open.