main
John Lauer
Publish compact v5 electrical checks and six captioned progression review scenes; cooling acceptance remains open
ca514b5
OK: test plan (board): 18 measurements, 18 probe-able, 0 gap(s)
off GATE dc test point TP5.1 at (104.25, 82.85)
cc SHUNT_P_SENSE dc test point TP3.1 at (100.25, 86.25)
v DUT_POS dc test point TP1.1 at (104.25, 80.25)
gate GATE waveform test point TP5.1 at (104.25, 82.85)
boost V_GATE dc test point TP6.1 at (107.05, 82.85)
fan FAN_TACH waveform test point TP12.1 at (104.25, 66.25)
fault HW_OK waveform test point TP9.1 at (104.25, 85.45)
ground GND ground test point TP11.1 at (100.25, 92.25)
kelvin-minus SHUNT_N_SENSE dc test point TP13.1 at (108.25, 66.25)
fan-pwm FAN_PWM waveform test point TP17.1 at (101.05, 73.25)
aux 5V_AUX dc test point TP14.1 at (101.05, 70.75)
logic 3V3 dc test point TP7.1 at (100.25, 89.25)
reference VREF_2V5 dc test point TP15.1 at (104.75, 63.0)
temperature TEMP_SENSE dc test point TP8.1 at (101.05, 80.25)
latch LATCH_Q waveform test point TP10.1 at (107.05, 85.45)
setpoint I_SET dc test point TP4.1 at (101.05, 77.45)
post-rectifier LOAD_POS dc test point TP2.1 at (107.05, 80.25)
boost-switch BOOST_SW waveform test point TP16.1 at (148.45, 97.25)
Hint: Read the table to the human: what you will measure on the workcell and where the probe lands. Every added test point goes into the library and the schematic like any part.