main
John Lauer
Publish compact v5 electrical checks and six captioned progression review scenes; cooling acceptance remains open
ca514b5
20 measurements: 19 ok, 0 on a component pad, 1 near, 0 proposed, 0 missing (0 required)
OK power-in 5V_AUX panel via J3
OK rail-3v3 3V3 probe at TP7
OK rail-5v-aux 5V_AUX probe at TP14
OK rail-vref-2v5 VREF_2V5 probe at TP15
OK vout 5V_AUX probe at TP14
OK sw BOOST_SW probe at TP16
NEAR l-out 5V_AUX probe at TP14 (L1 itself cannot be probed; TP14 on the same net is the nearest landing)
OK tp-tp13 SHUNT_N_SENSE probe at TP13
OK tp-tp6 V_GATE probe at TP6
OK tp-tp4 I_SET probe at TP4
OK tp-tp3 SHUNT_P_SENSE probe at TP3
OK tp-tp17 FAN_PWM probe at TP17
OK tp-tp2 LOAD_POS probe at TP2
OK tp-tp1 DUT_POS probe at TP1
OK tp-tp9 HW_OK probe at TP9
OK tp-tp5 GATE probe at TP5
OK tp-tp10 LATCH_Q probe at TP10
OK tp-tp8 TEMP_SENSE probe at TP8
OK tp-tp12 FAN_TACH probe at TP12
OK ground GND ground at J11
OK: coverage.json written: the board can be probed
Hint: l-out (recommended): L1 itself cannot be probed; TP14 on the same net is the nearest landing
Hint: workcell fact: coverage: prove the board can be probed BEFORE it is ordered; every gap found now is a board change in adom-aiflow (add a test point, move a part), not a bench workaround
Hint: workcell fact: coverage: a power board needs at least VIN on the board (not just at the supply), VOUT, the switch node at the inductor's input, the inductor's output side, feedback, the biggest bulk capacitor, every indicator LED (camera) and a free GND contact for the probe's ground pin
Hint: workcell fact: coverage: VIN comes from a Control Panel supply (PS1, current-limited) through a wired machine contact; that contact holds the wire's pin, so VIN is probed somewhere else on the board
Hint: workcell fact: coverage: an LED is a camera check (the overhead camera, probe parked clear), not a probe point
Hint: workcell fact: coverage: the probe tip (0.3 mm, +-0.15 mm XY) can land on a test point or the outer half of a component pad; the body (4 mm radius) must clear every part taller than the needle's 6 mm free length (assumed until Stephen's P250BR3 CAD)
Hint: Use the landings in coverage.json when you write plan.json (test, probe point per measurement); `plan check` cross-checks them.
Hint: next step refs: Run `adom-aiflow-probing refs` (re-runs the design's switching netlist at each VIN and reads any vendor-model CSDF). Check the printed metrics match the numbers the design reported; if they do not, stop and find out why before planning against them.