d61d6cb
Compact R11: remaining qualification dependencies
The 72 × 72 mm v5 PCB passes native DRC (0 errors, warnings and opens), schematic parity and the current screen. The user authorized best assumptions for geometry, interface and fan data; supplier replies no longer block prototype modeling or packaging.
Work completed under assumptions
The prototype includes an insulating Q1 interface, direct sink attachment, side fan and duct, large-pin carrier, retention hardware and routed wire reservations. Geometry, contact classifications, fit parts and checks live in the assembly review. Nominal checks are not strength, tolerance, airflow or thermal qualification.
The firmware compiles with output locked. A bench-only 25 kHz PWM implementation and 1000 register-simulation cases are complete. Exact fan frequency acceptance, zero-duty behavior and tach response remain physical qualification tasks; no hardware was flashed.
The six approved R11 scenes are assembled into the published 249.443-second film with selectable player captions and no burned narration captions. The rendered player reports 84 cues and eight chapters. New 18-second assembly footage is separate, silent and unapproved for inclusion in the main film.
What still needs real hardware or verified data
- Exact sink/ear geometry, allowable local attachment, material, thread engagement and manufactured fit.
- Actual fan control behavior, installed airflow, interface resistance and electrical isolation.
- Temperature-sensor attachment and lag, fan-stall shutdown, transient junction rise and operating-envelope validation.
The 5 W command cap, 55°C case trip, 40°C ambient and original Q1 rise budget remain unchanged. The thermal sensitivity study retains failing fan-off cases and does not pass the original AIFlow thermal gate. The prototype firmware remains locked until protected bench validation justifies enabling it.
ATS and Same Sky technical requests were sent on 14 October with authorization; replies are pending in the last checked snapshot. No duplicate request, purchase or manufacturing release is authorized by this report.
Shared-source status
AIFlow rules-check fix is published in source commit542a3c3410b7323590c5bacd11f2b15064454eb5 and used through an isolated tested binary. The probe collision-checker repair remains owner PR3. These are not registry-wide deployed releases. The historical supervisor remains paused; no new supervisor was created.
# Compact R11: remaining qualification dependencies
The 72 × 72 mm v5 PCB passes native DRC (0 errors, warnings and opens), schematic parity and the current screen. The user authorized best assumptions for geometry, interface and fan data; supplier replies no longer block prototype modeling or packaging.
## Work completed under assumptions
The prototype includes an insulating Q1 interface, direct sink attachment, side fan and duct, large-pin carrier, retention hardware and routed wire reservations. Geometry, contact classifications, fit parts and checks live in [the assembly review](../assumed-assembly/README.md). Nominal checks are not strength, tolerance, airflow or thermal qualification.
The firmware compiles with output locked. A bench-only 25 kHz PWM implementation and 1000 register-simulation cases are complete. Exact fan frequency acceptance, zero-duty behavior and tach response remain physical qualification tasks; no hardware was flashed.
The six approved R11 scenes are assembled into the published 249.443-second film with selectable player captions and no burned narration captions. The rendered player reports 84 cues and eight chapters. New 18-second assembly footage is separate, silent and unapproved for inclusion in the main film.
## What still needs real hardware or verified data
- Exact sink/ear geometry, allowable local attachment, material, thread engagement and manufactured fit.
- Actual fan control behavior, installed airflow, interface resistance and electrical isolation.
- Temperature-sensor attachment and lag, fan-stall shutdown, transient junction rise and operating-envelope validation.
The 5 W command cap, 55°C case trip, 40°C ambient and original Q1 rise budget remain unchanged. The thermal sensitivity study retains failing fan-off cases and does not pass the original AIFlow thermal gate. The prototype firmware remains locked until protected bench validation justifies enabling it.
ATS and Same Sky technical requests were sent on 14 October with authorization; replies are pending in the last checked snapshot. No duplicate request, purchase or manufacturing release is authorized by this report.
## Shared-source status
AIFlow rules-check fix is published in source commit542a3c3410b7323590c5bacd11f2b15064454eb5 and used through an isolated tested binary. The probe collision-checker repair remains owner PR3. These are not registry-wide deployed releases. The historical supervisor remains paused; no new supervisor was created.