main
John Lauer Record compact live-placement pass, expanded test coverage and fan motion review 9a1ffeb

R11 cooler fixture and qualification procedure

Status: preparation for an instrumented prototype, not completed measurements or permission to manufacture a released assembly. Preserve the 5 W software ceiling and output lock until electrical bring-up is approved. The compact cooler has no accepted installed thermal resistance yet.

Geometry to measure before machining

Use the saved compact PCB revision and exact Q1 formed-lead model. In the native exported frame (origin at PCB lower-left, Z up), Q1's tab plane is nominal Z = 8.170 mm. The tab spans X = 26.3175..36.6025 mm and Y = 26.155..41.520 mm; its hole is centered near X = 31.46, Y = 38.66 mm. These are CAD dimensions, not as-built tolerances. Do not reuse the older R10 assembly's height datum.

The working ATS-FPX040040035-66-C2-R0 sink is 40 × 40 × 35 mm with a 45 × 45 mm attachment pattern. Obtain the detailed drawing/CAD to establish base thickness, ear envelope, hole diameters, flatness and fin/tool access before deciding a blind-tap depth or mounting hardware. The supplied T766 material is not the electrical isolation barrier.

A direct AlN interface could remove R10's separate copper spacer if the adjustable support seats the sink at the actual Q1 tab height. This is a design option, not an approved stack. Select insulation dimensions and hole/edge clearance from an authoritative drawing; do not compress a brittle ceramic by bending the MOSFET leads. Carry sink and fan mass in the carrier, independently of Q1 leads and solder joints. Provide controlled preload with an electrically insulated fastener or documented spring clamp. Anodizing is not a guaranteed insulation system.

Record measured tab height, sink flatness, interface thickness, case support gap, fastener engagement and actual clamp force/torque. Resolve any residual gap with a dimensioned part or adjustable support, never an unspecified thick grease layer. Keep insertion/removal loads out of the cooler joint.

Instrumented bench fixture

Mount the compact assembly in its intended scaffold orientation. Use a current-limited auxiliary supply, calibrated DUT voltage/current measurement, logging of tach and hardware fault signals, and fine thermocouples on Q1 case, sink base near contact, fin tip, inlet and outlet air. Add an independently insulated reference sensor next to the installed thermistor. Electrically isolate measurement junctions from Q1's live drain tab; account for probe isolation ratings and common-ground paths.

Record exact fan and sink part numbers, interface batch, clamp setting, ambient temperature, supply voltage, firmware hash, board hash, orientation and duct configuration. Measure fan supply current during startup and steady operation; its catalog free-air CFM is not installed fin-channel airflow. If measuring velocity, map the fin inlet rather than taking one center-fan reading. Record bypass flow and recirculation.

Test sequence and acceptance evidence

  1. With DUT energy removed, check polarity, tab-to-sink isolation, connector pinout, mechanical retention and probe access. Apply the appropriate insulation test only after choosing the actual insulation system and rating; no unreviewed hipot voltage is specified here.
  2. Power auxiliary electronics with output locked. Confirm startup fan operation and tach validity before any arm request. Verify sensor open/short, watchdog, host-loss and latched-fault behavior. Compare the hardware shutdown signal with measured DUT current.
  3. Characterize connector-side PWM only with the DUT load disabled. Confirm permitted frequency and duty range, startup behavior, minimum reliable speed, tach accuracy and behavior at zero duty. Until this is resolved, use the reset-default full-cooling state; do not assume zero duty stops this fan.
  4. With approved bring-up firmware, increase load gradually within 0..min(3 A, 5 W / DUT voltage), monitoring all temperatures. Test the intended voltage corners because Q1, D1 and shunt divide losses differently. A 3 A conductor screen is not authorization for a 3 A continuous test outside the power envelope.
  5. At the worst intended ambient and orientation, log thermal equilibrium and sensor lag with the enclosure/duct installed. Compare case temperature, estimated junction temperature using the documented package path, and the original 55 C protection budget. Include measurement uncertainty and interface variation; a nominal prediction is not a production maximum.
  6. Inject a tach disconnect/stall fault safely using the test fixture. Capture last valid edge, fault assertion, gate collapse and current extinction on one timebase. Host synthetic tests establish a 15 ms plus polling bound under their assumptions, not hardware shutdown latency. Measure it before accepting the compact active-cooling design.
  7. Repeat fan failure from the hottest accepted operating state. Record peak temperatures during shutdown and heat soak after current reaches zero. Separately evaluate fan-off standby. Do not substitute a fan-off zero-load run for an unpassed continuous fan-off full-load thermal gate.
  8. Repeat the complete probing sequence with the real installed cooler, wires, connector and clamp; then inspect wear after repeated scaffold insertion/removal. Record jams, connector strain, loosening and insulation damage.

Store raw time series, calibration/uncertainty, photos and traces with the exact assembly revision. A failed result sends the design back to the corresponding AIFlow step. No current, thermal, model or probing gate is waived by this procedure.