John Lauer Publish input-bound R11 prototype bundle and completed CLI clearance review 7007e93

Mechanical checks that changed the R11 design

The PCB stays at SHA-256 b70a466263bbb8d73594e608dca673b7144bd917356c35da24218b85870c3765. These iterations change the assumed external cooling assembly, not its electrical routing or the 5 W command limit.

Check Finding Design response
Cooling parts against each other Sensor pocket overlapped insulating wafer; harness and shelf crossed Move pocket clear and route sensor wires around the support
Wire reservations against each other 1.3 mm wire envelopes on 0.9 mm spacing intersected Increase spacing and revise entry bends; preserve actual connector endpoints
Native board solids Sensor wires entered the header body Add mating plug envelope and raise wire entry
Manufacturer drawing review 40 mm fin body omitted mounting ears on 45 mm centers Add explicit conservative ear reservations and retain profile/clocking uncertainty
Retention review Fan nuts had insufficient space behind flange Move fan outward; add captive nut reservations, flange returns and bolts
Native board solids Rear ear/support hit a large scaffold pin Move sink 2 mm inward and revise support geometry
Complete probe replay 28 collision episodes, no wire snags; front support and ear obstructed the test corridor Move the cooling group 7 mm toward the front and carry the front hold-down from the sink-side rail, leaving the left test corridor open
Connection clearance after relocation Lower duct transition overlapped fan mating plug Move the plug relief to preserve its board-fixed position

| Collar review | A 6 mm rail left only 0.15 mm radial material at the pin bore | Add 10 mm collar bosses, retaining a 5.7 mm assumed bore and hardware relief | | Wire/structure check | Sensor route crossed the duct lip, another wire and the carrier spine | Separate heights, route around the perimeter and add a 1.7 mm clearance groove | | Ground-tether replay | Four snags remained after wire rerouting; transformed coordinates identify sink and duct bounding boxes | MP1 reduces these to three; MP2 transfer and rotation0 introduce other failures; continue fixture orientation study with original75mm tether |

Failures are preserved in ../evidence/, including retention-front-support-probe-collisions.json and retention-large-pin-conflict.json. Every changed model invalidates older clearance results. The current acceptance state is reported by the input-bound review and final probe evidence, not by the historical rows in this table.

The term “assumed” remains meaningful: the ear profile, mating plug details, contact interface, material, fastener engagement and hot tolerance stack require actual drawings or measurements. These geometric checks do not establish industrial qualification.

The final candidate returns to the original90-degree fixture and J7 ground. Edge-distance selection alone did not clear the four tether snags. Encountered-obstacle refinement in the task-local CLI did:233.4seconds,17564 poses,4698 parts, zero head collision episodes and zero tether snags. The original75mm wire and all thresholds are unchanged. This is conservative CLI planning evidence; browser tether-obstacle parity and physical verification remain separate.