a0b613b
JLCPCB five-board provisional price
JLCPCB shows $249.50 for five boards, or $49.90 per board, before shipping and tax. This is actual vendor pricing read in Pup on October19,2026, not a parts-subtotal estimate. It is not approval to manufacture.
BOM components alone: $113.24 per five-board batch ($22.65 allocated per board). See all 39 priced component lines, with key components first and passives below. This excludes separately fitted parts and cooling hardware; PCBWay’s component cost is still pending.

| Charge | Five-board batch, USD |
|---|---|
| PCB | 4.00 |
| Components, including vendor order quantities | 113.24 |
| Extended-part fees | 114.33 |
| Setup | 8.24 |
| Stencil | 1.55 |
| SMT assembly | 3.06 |
| Hand-soldering labor | 3.61 |
| Manual assembly | 0.41 |
| Special components | 0.15 |
| Nitrogen reflow | 0.91 |
| Total | 249.50 |
Scope:72×72mm two-layer board, five units, Economic top-side assembly. The selected board BOM includes J11 header assembly; J10 through-hole PH header and Q1 remain separately fitted. Fan, heatsink, harness, scaffold hardware and custom mechanical work are outside this price. Shipping and tax are not shown in this total.
JLC's live stock required two pricing-only alternatives: R22 uses ERA2AEB333X/C445615 (also used at R8), and J8 uses USB4105-GF-A-120/C5184243 (1.20mm shell stakes versus0.95mm). These selections are preserved in pricing BOM, with evidence and hashes. They are not silently applied to the original board/BOM.
The installed AIFlow export still fails11 placement checks. A separately labeled unapproved CPL was uploaded solely to obtain this provisional vendor price; neither the quote acceptance gate nor manufacturing approval was passed. No order or payment was made. Pricing must be refreshed after final placement and substitution reviews.
Extended-part fees are the largest avoidable cost to investigate:114.33USD across the batch. Replacing suitable passives with verified Basic parts could reduce them; no savings are claimed until a revised vendor price is obtained.
# JLCPCB five-board provisional price
**JLCPCB shows $249.50 for five boards, or $49.90 per board, before shipping and tax.** This is actual vendor pricing read in Pup on October19,2026, not a parts-subtotal estimate. It is not approval to manufacture.
**BOM components alone: $113.24 per five-board batch ($22.65 allocated per board).** [See all 39 priced component lines](BOM-COST.md), with key components first and passives below. This excludes separately fitted parts and cooling hardware; PCBWay’s component cost is still pending.

| Charge | Five-board batch, USD |
|---|---:|
| PCB |4.00|
| Components, including vendor order quantities |113.24|
| Extended-part fees |114.33|
| Setup |8.24|
| Stencil |1.55|
| SMT assembly |3.06|
| Hand-soldering labor |3.61|
| Manual assembly |0.41|
| Special components |0.15|
| Nitrogen reflow |0.91|
| **Total** |**249.50**|
Scope:72×72mm two-layer board, five units, Economic top-side assembly. The selected board BOM includes J11 header assembly; J10 through-hole PH header and Q1 remain separately fitted. Fan, heatsink, harness, scaffold hardware and custom mechanical work are outside this price. Shipping and tax are not shown in this total.
JLC's live stock required two pricing-only alternatives: R22 uses ERA2AEB333X/C445615 (also used at R8), and J8 uses USB4105-GF-A-120/C5184243 (1.20mm shell stakes versus0.95mm). These selections are preserved in [pricing BOM](bom-pricing-only.csv), with [evidence and hashes](vendor-pricing.json). They are not silently applied to the original board/BOM.
The installed AIFlow export still fails11 placement checks. A separately labeled unapproved CPL was uploaded solely to obtain this provisional vendor price; neither the quote acceptance gate nor manufacturing approval was passed. No order or payment was made. Pricing must be refreshed after final placement and substitution reviews.
Extended-part fees are the largest avoidable cost to investigate:114.33USD across the batch. Replacing suitable passives with verified Basic parts could reduce them; no savings are claimed until a revised vendor price is obtained.