Quote-variant substitution limits

These calculations support an informational five-board quote, not physical qualification.

R9 precision resistor

The native netlist connects R8=33k, R9=5.6k and R10=1k in series from DAC_OUT to SHUNT_N_SENSE. At a deliberately conservative 5 V across the complete chain, current is 126.3 uA and R9 dissipation is 89.3 uW. Even the stronger fault bound of a full 5 V across R9 alone gives 4.47 mW. Require at least 31.5 mW rated power, 5 V operating voltage, 0.1% tolerance and 25 ppm/K. Panasonic ERA2AEB562X provides 63 mW at 85 C and the same precision. The assembly is not rated to the original resistor's 175 C; the selected STM32 is limited to 85 C ambient. Require component range -40 to +125 C for this quote, with local resistor temperature below 125 C and thermal qualification still outstanding. This is an explicitly narrower part rating, not equivalence at 175 C.

L1 gate-bias boost inductor

L1 feeds the TPS61040 gate-bias supply, not DUT load current. TI TPS61040 electrical table specifies 450 mA maximum switch current limit. At 6 V input, minimum 8 uH (10 uH minus20%), and the datasheet's typical100 ns delay, overshoot is75mA:525mA estimated peak. Since delay is typical rather than guaranteed, require a conservative1 A saturation rating and1 A thermal-current rating; hardware startup/temperature validation remains required. Limit DCR to150mohm (150mW at the conservative1A bound; about41mW at525mA). TDK CLF5030NIT-100M-D specifies1.6A minimum saturation criterion,1.7A typical40C-rise current and114mohm maximum DCR. Keep the same10uH20% value. The datasheet typical thermal rating must not be presented as a guaranteed worst-case rating.

Sources: design/netlist.json; TI TPS61040 RevL electrical characteristics and peak current control; TDK CLF5030NI-D datasheet; Panasonic ERA-A datasheet; ST STM32G0B1 ordering temperature code6. Physical tests and placement/rotation review remain open.