main
John Lauer Verify adopted board identity against the canonical saved PCB a5a45e0

Shunt-path current-transfer review

One 0.8 mm pad / 0.4 mm drill through via at (134.4, 84.8) mm and a 1.2 mm bottom-layer link to (133.8, 84.2) mm were added to SHUNT_P. The Kelvin-sense net is unchanged. The canonical saved board matches the tested track/via geometry: 1,675 segments and 254 vias. Native saved-board DRC has zero findings and zero opens under its recorded check settings.

At 3 A, 35 µm copper and 0.2 mm mesh, the experimental Fields screen reduces the SHUNT_P peak from 111.5 to 96.2 A/mm² (about 14%) and copper loss from 0.045 to 0.043 W. The peak moves from (134.1,84.3) to (135.5,85.1). This is redistribution of current, not elimination of the power-neck flag or hardware qualification. Four power-neck flags remain. Nominal via plating remains an assumption; the new candidate has not had a fine-mesh comparison.

Widening the two front tracks was also tested: 1.3 mm passed with 15 offline library warnings and zero opens, but improved the screened peak only to 106.5 A/mm². Both 1.4 and 1.5 mm violated the 0.20 mm clearances near C2 and the Kelvin pad. These wider alternatives were not landed; original front widths remain 1.2 mm.

The board-writing process must exit before the independent DRC process in this workflow. A DRC launched while the writer was alive timed out; running the same saved candidate afterward completed in four seconds. An earlier AIFlow adoption attempt was interrupted after duplicate stalled checks appeared. A subsequent adoption completed successfully and preserved historical snapshots. The interrupted ledger entry remains historical failure evidence. The successful retry adopted board-9, whose SHA256 matches the canonical saved board.

The native net-tour hint also selected the wrong zoom action and left an interactive tool active. KiCad Bridge issue 121 records the exact-label workaround. No shared Bridge runtime was modified.

Evidence

The 5 W bring-up ceiling remains. Cooling, MOSFET SOA, USB layout, MCU integration and physical qualification remain incomplete; no fabrication release is implied.