main
John Lauer
aiflow run compact-outline-candidate-codex-astra-20261013-2322: placement
a794aa7
Wiring and service correction chapter
User requested clips of the complete design progression. Record significant visible work, cut waits, and use separate captions. No burned-in captions. Narration and final edit pending.
Recorded
window-96416320-20261016-103631.mp4: silent live viewer inspection after replacing overshooting sensor curves and reloading to remove stale old wire meshes. Cooler layers hidden for inspection. This is a review of generated geometry, not footage of editing the CAD or proof of clearance qualification. Playback review pending.
Not recorded / capture next
- Earlier Rust prototype typing, first connector location attempts and native failed route attempts were not filmed. Do not recreate them as live original footage; explain them with a labeled retrospective review if useful.
- Front-edge J9 relocation, same-board native DRC and installed four-conductor fan harness.
- Connector mating/removal and neighboring connector service corridor review.
- Sensor access-hole interference, corrected placement/routing and tool-access test.
- Component pages, exact harness BOM and crimp/build instructions.
- Mechanical/wiring linter failure-to-correction demonstration.
- Final assembly tour and optional connector/tool motion.
Keep the user's annotation-driven corrections in the narrative. Do not imply the AI discovered those omissions without prompting. Supplier data gaps and physical qualification remain distinct from CAD checks.
User preference reinforced: prioritize moving video clips over static screenshots for the final edit. Screenshots remain inspection evidence only where useful. First clip duration verified by ffprobe:17.125s; silent. Do not substitute static slides for the requested assembly progression.
# Wiring and service correction chapter
User requested clips of the complete design progression. Record significant visible work, cut waits, and use separate captions. No burned-in captions. Narration and final edit pending.
## Recorded
- `window-96416320-20261016-103631.mp4`: silent live viewer inspection after replacing overshooting sensor curves and reloading to remove stale old wire meshes. Cooler layers hidden for inspection. This is a review of generated geometry, not footage of editing the CAD or proof of clearance qualification. Playback review pending.
## Not recorded / capture next
- Earlier Rust prototype typing, first connector location attempts and native failed route attempts were not filmed. Do not recreate them as live original footage; explain them with a labeled retrospective review if useful.
- Front-edge J9 relocation, same-board native DRC and installed four-conductor fan harness.
- Connector mating/removal and neighboring connector service corridor review.
- Sensor access-hole interference, corrected placement/routing and tool-access test.
- Component pages, exact harness BOM and crimp/build instructions.
- Mechanical/wiring linter failure-to-correction demonstration.
- Final assembly tour and optional connector/tool motion.
Keep the user's annotation-driven corrections in the narrative. Do not imply the AI discovered those omissions without prompting. Supplier data gaps and physical qualification remain distinct from CAD checks.
User preference reinforced: prioritize moving video clips over static screenshots for the final edit. Screenshots remain inspection evidence only where useful. First clip duration verified by ffprobe:17.125s; silent. Do not substitute static slides for the requested assembly progression.