John Lauer aiflow run compact-outline-candidate-codex-astra-20261013-2322: thermal cc09d61

AI Flow run: codex-astra on board-0

Running: step thermal, 605.1 min of AI time since the prompt (21181.8 min on the wall clock). This page updates at every step change.

Prompt at 2026-10-13T23:22:02.610999+00:00 (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out.

Sessions

One row per human prompt: the AI's time on it, unobserved gaps excluded by the heuristic, which may include external AI work.

Session Prompt at Done at AI time min Unobserved gap min What
1 2026-10-13T23:22:02Z 2026-10-14T03:24:17Z 223.1 19 the first prompt
2 2026-10-14T03:24:17Z (open) 0.0 0 follow-up (no prompt mark; say prompt --text next time)
3 2026-10-14T13:20:36Z (open) 0.0 0 follow-up (no prompt mark; say prompt --text next time)
4 2026-10-14T13:20:36Z (open) 10.2 0 ok, keep going then
5 2026-10-14T13:30:45Z (open) 2.0 23 keep going
6 2026-10-14T13:55:18Z 2026-10-14T23:36:24Z 27.4 554 go — proceed with explicitly documented geometry, interface and fan assumptions for protot
7 2026-10-14T23:36:24Z (open) 0.0 0 follow-up (no prompt mark; say prompt --text next time)
8 2026-10-15T11:09:37Z (open) 0.0 0 follow-up (no prompt mark; say prompt --text next time)
9 2026-10-15T11:09:37Z (open) 342.4 18692 User requests correction of incomplete R11 delivery: identify J connectors, replace perime
all 605.1

Per step

AI time only, the idle cut out.

Step AI min AI thinking min Tool min Turns Visits Returns Longest think
intake 1.3 1.2 0.0 2 1 0 1.1 min
placement 112.7 98.0 14.7 99 6 4 11.3 min
routing 31.3 26.6 4.7 37 6 0 8.4 min
pours 4.9 3.7 1.2 19 4 0 1.8 min
current 184.9 76.2 108.7 72 7 1 10.2 min
thermal 61.9 47.3 14.6 84 4 0 9.9 min
3d 0.0 0.0 0.0 1 0 0 0.0 min
components 17.2 16.1 1.1 9 5 1 10.3 min
design 14.6 14.3 0.3 6 1 0 13.3 min
fields 54.2 54.1 0.2 28 1 0 34.5 min
libraries 25.9 24.2 1.7 17 2 0 8.0 min
models 40.1 30.9 9.2 23 2 0 7.5 min
outline 1.3 0.8 0.6 15 4 0 0.4 min
rules 1.8 1.3 0.5 3 1 0 1.2 min
test-plan 1.0 0.7 0.3 5 2 0 0.6 min
thermal-vias 51.9 38.7 13.2 68 4 0 6.1 min
total 605.1 434.0 171.1

Returns to earlier steps

  • 2026-10-14T01:58:41Z back to placement (visit 2): Corrected probing obstacle detection found cooler interference during ground-pin insertion and TP14 travel; propose moving J7 and TP14 into the left access corridor.
  • 2026-10-15T11:09:38Z back to components (visit 2): User review exposed mechanical and harness inconsistencies, missing heatsink component contract, connector access and unfinished silkscreen; reopen design from component contracts.
  • 2026-10-16T20:07:42Z back to placement (visit 4): Probing compatibility correction: medium tether cannot mate to large MP1. Existing medium J7 is obstructed by J1 panel-wire riser at dx=-2 dy=-4 mm inside pincer open-jaw clearance. Relocate compatible GND contact or adjacent supply contact; retain large mounting pins; reroute and repeat native/probing gates.
  • 2026-10-16T22:07:18Z back to placement (visit 5): Board-10 switch-node gate found 15.4 mm versus 12 mm budget; trial TP16 closer to L1 without relaxing probe or electrical limits
  • 2026-10-16T23:12:58Z back to placement (visit 6): Adopt R7 fused-supply elbow correction: native DRC0/0, all six current screens and assembled nominal probing stages pass; thermal remains open
  • 2026-10-28T12:43:35Z back to current (visit 5): Issue #1: repair SHUNT_P copper and explicitly classify U4.8 sense input; rerun current and thermal after adopted board13.

Decisions along the way

  • 2026-10-13T23:23:25Z clip-start:rules-1
  • 2026-10-13T23:23:37Z capture-stop
  • 2026-10-13T23:25:09Z clip-start:components-1
  • 2026-10-13T23:26:25Z capture-stop
  • 2026-10-13T23:28:38Z clip-start:design-1
  • 2026-10-13T23:28:58Z capture-stop
  • 2026-10-13T23:31:15Z artifact design-review for design-1: First 72 x 72 mm packing candidate; native check exposes USB-C and upper-right machine-pin interference. Not accepted.
  • 2026-10-13T23:43:12Z clip-start:libraries-1
  • 2026-10-13T23:44:19Z capture-stop
  • 2026-10-14T00:02:28Z artifact design-review for libraries-1: Routed R11: all 288 connected logical pins match the native schematic export
  • 2026-10-14T00:03:12Z capture-stop
  • 2026-10-14T00:12:14Z capture-stop
  • 2026-10-14T00:13:18Z capture-stop
  • 2026-10-14T00:36:51Z capture-stop
  • 2026-10-14T01:21:47Z artifact analysis-image for thermal-vias-1: R11 0.1 mm filled-copper current screen, 0.5 A auxiliary allowance; no thermal qualification.
  • 2026-10-14T01:25:44Z capture-stop
  • 2026-10-14T01:26:30Z capture-stop
  • 2026-10-14T01:38:42Z artifact analysis-image for thermal-1: Q1 external heat-path sensitivity study on v2. Hypothetical interface and airflow; not a spatial fin solve, thermal acceptance or higher rating.
  • 2026-10-14T01:43:34Z artifact design-review for thermal-1: R11 v4 current and native DRC pass; thermal and assembled probe gates remain open.
  • 2026-10-14T01:58:47Z capture-stop
  • 2026-10-14T02:39:56Z capture-stop
  • 2026-10-14T02:40:50Z capture-stop
  • 2026-10-14T02:41:37Z capture-stop
  • 2026-10-14T02:42:19Z capture-stop
  • 2026-10-14T02:42:29Z capture-stop
  • 2026-10-14T02:54:46Z capture-stop
  • 2026-10-14T03:08:46Z artifact analysis-image for current-2: R11 v5 matched 0.1 mm filled-copper current screen; computed result, not hardware qualification.
  • 2026-10-14T03:08:46Z artifact analysis-image for thermal-2: R11 v5 external Q1 sensitivity only. Assumed interface and airflow; fan-off exceeds original budget. Not resolved fin CFD or thermal acceptance.
  • 2026-10-14T03:09:39Z artifact process-video-review for fields-1: Actual v5 Fields net selection, 1.59x, captioned narration. Current-only presentation; thermal gate remains open. Awaiting user clip review.
  • 2026-10-14T13:22:22Z artifact analysis-report for thermal-2: Q1 insulating interface screen: two documented pads do not substantiate prior 0.7 K/W assumption; thermal remains open
  • 2026-10-14T13:32:46Z artifact analysis-image for thermal-2: Q1 insulating joint sensitivity; reference conditions only, no thermal acceptance
  • 2026-10-14T14:02:39Z artifact review for fields-1: User-authorized assumption-based prototype scope; original limits and qualification gates retained
  • 2026-10-14T22:10:12Z artifact review for thermal-2: Q1 full heat-path sensitivity: prototype assumptions, thermal qualification still open
  • 2026-10-14T22:27:05Z artifact process-video for fields-1: 4:09 R10-to-R11 process edit; six R11 scenes explicitly approved; player captions separate; new assembly footage excluded
  • 2026-10-14T23:34:23Z artifact prototype-review for fields-1: R11 assumed retained assembly: board-solid and internal-contact checks pass; corrected CLI replay has zero collisions/snags; hardware and browser parity remain unqualified.
  • 2026-10-14T23:35:29Z artifact engineering-review for fields-1: All six retained-assembly CLI checks pass on hashed inputs and isolated solver; physical qualification and browser parity remain open.
  • 2026-10-15T16:07:45Z artifact engineering-status for libraries-2: V8 remains unfinished: 14 opens at last native check; fan support geometry and underside recording completed; electrical and sensor work in progress
  • 2026-10-15T16:12:55Z artifact engineering-status for models-2: V8 working candidate differs from AIFlow adopted board-5: old model/current results do not qualify V8; adoption awaits corrected native DRC
  • 2026-10-15T17:05:59Z capture-stop
  • 2026-10-15T17:36:29Z artifact engineering-review for routing-3: Unadopted PH sensor: native electrical checks passed; housing interference under correction; fan harness and thermal gates open
  • 2026-10-16T10:47:33Z artifact review-document for routing-3: User-requested harness BOM and build/service requirements; unresolved tooling and component assets explicitly tracked
  • 2026-10-16T10:47:33Z artifact review-document for routing-3: Moving-video shot log: actual recorded review versus unrecorded edits; no burned captions
  • 2026-10-16T22:26:49Z artifact review for placement-5: Unadopted short-route trial: four current-neck failures; board-only Q1 model omits external cooling, not an assembled temperature prediction
  • 2026-10-16T22:26:49Z artifact review for placement-5: Rejected regulator-side TP16 trial: full probe module hits heatsink during descent; limits unchanged
  • 2026-10-16T22:35:10Z artifact review for placement-5: Relocated J9 with shortened four-wire fan harness: all six nominal probing checks pass with compressed-module tether attachment and unreachable-route rejection. Exact input hashes retained. Candidate is not adopted; current and thermal gates remain open; physical qualification false.
  • 2026-10-16T22:40:13Z artifact review for placement-5: Unadopted current-density copper repair: native DRC0/0; positions and1oz copper unchanged; fresh0.1mm Fields and rebuilt probing in progress.
  • 2026-10-16T22:42:06Z artifact review for placement-5: Copper repair also passes six nominal probe stages under2823abd. Preserved as historical evidence; stricter cable insertion/extraction and jaw-clearance extension is being tested. Physical qualification false.
  • 2026-10-16T22:44:52Z artifact review for placement-5: Fresh0.1mm current solve: GND and5V_AUX now pass; DUT_POS67.35 and DUT_FUSED97.38 A/mm2 still fail unchanged60. Q1 board-only thermal model excludes its cooler; no assembled temperature qualification.
  • 2026-10-16T22:45:02Z artifact review for placement-5: Fresh0.1mm current solve: GND58.54 and5V_AUX59.33 pass; DUT_POS67.35 and DUT_FUSED96.70 A/mm2 fail unchanged60. Q1 board-only thermal model excludes its cooler; no assembled temperature qualification.
  • 2026-10-16T22:49:50Z capture-stop
  • 2026-10-16T23:42:16Z artifact engineering-review for thermal-3: R7 exact-input probing passes; Q1 passive thermal target remains unresolved
  • 2026-10-16T23:42:16Z artifact thermal-sizing for thermal-3: Unchanged 15 C Q1 rise budget requires at most 1.607 K/W passive sink path at 5.5 W; assumptions unqualified
  • 2026-10-17T00:06:00Z artifact thermal-sizing for thermal-3: Supplier-informed fine/coarse sink screen and larger passive comparison; no qualified option or gate change

Where the board stands

  • routing: 0 unrouted after null passes
  • analyze-current: pass

The steps on camera

One clip per step visit, sped up 10x, with the editor at the start and the end of the visit. A caption above every clip and screenshot says what it shows.

rules

What this step does: Choose the fab and load its design rules before anything is drawn: the AI asks the human which fab builds the board (3rdPartyFab by default, JLCPCB on request) and loads that fab's rule profile into the EDA (KiCad .kicad_dru, Fusion DRC rules), so every later step designs to the process that will build it.

Clip: rules, the PCB editor from 2026-10-13T23:23:25Z to 2026-10-13T23:23:37Z. Motion only: 0.2 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the rules clip, what the camera saw.

nine frames of rules

Screenshot: the board when rules began.

the board when rules began

components

What this step does: Audit wiki component identity, reusable CAD quality and redistribution evidence before placement; offer cached optional MPN-marked variants.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: components, the PCB editor from 2026-10-13T23:25:09Z to 2026-10-13T23:26:25Z. Motion only: 1.3 min of real time, 6 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the components clip, what the camera saw.

nine frames of components

Screenshot: the board when components began.

the board when components began

design

What this step does:

Why the AI came back here: Preliminary compact outline screening while sourcing remains open; not placement acceptance

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: design, the PCB editor from 2026-10-13T23:28:38Z to 2026-10-13T23:28:58Z. Motion only: 0.4 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the design clip, what the camera saw.

nine frames of design

Screenshot: the board when design began.

the board when design began

The AI's file: First 72 x 72 mm packing candidate; native check exposes USB-C and upper-right machine-pin interference. Not accepted. design-1-design-review-0.json

libraries

What this step does: Assemble and validate the reviewed symbols, footprints and selected model variants in the chosen EDA before placement.

Why the AI came back here: Fan PWM circuit native pin parity passes; preparing exact fan and connector libraries

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: libraries, the PCB editor from 2026-10-13T23:43:12Z to 2026-10-13T23:44:19Z. Motion only: 1.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the libraries clip, what the camera saw.

nine frames of libraries

Screenshot: the board when libraries began.

the board when libraries began

The AI's file: Routed R11: all 288 connected logical pins match the native schematic export libraries-1-design-review-0.json

models

What this step does: Check native board model resolution and inspect the selected library variants in the chosen EDA; use the component register for unresolved assets.

Why the AI came back here: Check portable native component model bindings for compact revision; external cooling assembly remains a separate open deliverable

Clip: models, still recording (started 2026-10-14T00:02:31Z); it appears here when the step ends.

test-plan

What this step does: Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: test-plan, the PCB editor from 2026-10-14T00:12:00Z to 2026-10-14T00:12:14Z. Motion only: 0.2 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the test-plan clip, what the camera saw.

nine frames of test-plan

placement

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: placement, the PCB editor from 2026-10-14T00:12:57Z to 2026-10-14T00:13:18Z. Motion only: 0.4 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the placement clip, what the camera saw.

nine frames of placement

routing

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: routing, the PCB editor from 2026-10-14T00:34:07Z to 2026-10-14T00:35:49Z. Motion only: 1.7 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the routing clip, what the camera saw.

nine frames of routing

Screenshot: the board when routing ended.

the board when routing ended

thermal-vias

What this step does: Heatsink vias where the heat is: for every part that dissipates real power (the regulator, the inductor, the catch diode, the FETs), an array of vias in its thermal pad or the copper it dumps heat into, stitched to the ground or the plane on the other side, sized and counted from its dissipation; the AI reviews the plan and the binary lands it.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: thermal-vias, the PCB editor from 2026-10-14T00:36:01Z to 2026-10-14T00:36:51Z. Motion only: 0.8 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal-vias clip, what the camera saw.

nine frames of thermal-vias

The AI's drawing: R11 0.1 mm filled-copper current screen, 0.5 A auxiliary allowance; no thermal qualification.

R11 0.1 mm filled-copper current screen, 0.5 A auxiliary allowance; no thermal qualification.

pours

What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: pours, the PCB editor from 2026-10-14T01:25:21Z to 2026-10-14T01:25:24Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the pours clip, what the camera saw.

nine frames of pours

Screenshot: the board when pours ended.

the board when pours ended

outline

What this step does: Round the board's corners: every sharp outline corner becomes a radius (1.0 mm by default, spec outline.cornerRadius), so the board is kind to hands, panels and the fab's router.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: outline, the PCB editor from 2026-10-14T01:25:31Z to 2026-10-14T01:25:44Z. Motion only: 0.2 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the outline clip, what the camera saw.

nine frames of outline

current

What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: current, the PCB editor from 2026-10-14T01:26:16Z to 2026-10-14T01:26:19Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the current clip, what the camera saw.

nine frames of current

Screenshot: the board when current ended.

the board when current ended

thermal

What this step does: copper and vias at every hot tab against the rise budget; then the AI's own temperature rise drawing and a walkthrough of the pours it judged

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: thermal, the PCB editor from 2026-10-14T01:26:26Z to 2026-10-14T01:26:30Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal clip, what the camera saw.

nine frames of thermal

The AI's drawing: Q1 external heat-path sensitivity study on v2. Hypothetical interface and airflow; not a spatial fin solve, thermal acceptance or higher rating.

Q1 external heat-path sensitivity study on v2. Hypothetical interface and airflow; not a spatial fin solve, thermal acceptance or higher rating.

The AI's file: R11 v4 current and native DRC pass; thermal and assembled probe gates remain open. thermal-1-design-review-1.json

placement, visit 2 (rework)

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

Why the AI came back here: Corrected probing obstacle detection found cooler interference during ground-pin insertion and TP14 travel; propose moving J7 and TP14 into the left access corridor.

Clip: placement, visit 2 (rework), the PCB editor from 2026-10-14T01:58:44Z to 2026-10-14T01:58:47Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the placement, visit 2 (rework) clip, what the camera saw.

nine frames of placement, visit 2 (rework)

placement, visit 2

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

Clip: placement, visit 2, still recording (started 2026-10-14T02:39:02Z); it appears here when the step ends.

routing, visit 2

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

Why the AI came back here: V5 contact relocation and local PWM detour pass native checks; revalidate the adopted board

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: routing, visit 2, the PCB editor from 2026-10-14T02:39:53Z to 2026-10-14T02:39:56Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the routing, visit 2 clip, what the camera saw.

nine frames of routing, visit 2

thermal-vias, visit 2

What this step does: Heatsink vias where the heat is: for every part that dissipates real power (the regulator, the inductor, the catch diode, the FETs), an array of vias in its thermal pad or the copper it dumps heat into, stitched to the ground or the plane on the other side, sized and counted from its dissipation; the AI reviews the plan and the binary lands it.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: thermal-vias, visit 2, the PCB editor from 2026-10-14T02:40:47Z to 2026-10-14T02:40:50Z. Motion only: 0.0 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal-vias, visit 2 clip, what the camera saw.

nine frames of thermal-vias, visit 2

pours, visit 2

What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: pours, visit 2, the PCB editor from 2026-10-14T02:41:35Z to 2026-10-14T02:41:37Z. Motion only: 0.0 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the pours, visit 2 clip, what the camera saw.

nine frames of pours, visit 2

outline, visit 2

What this step does: Round the board's corners: every sharp outline corner becomes a radius (1.0 mm by default, spec outline.cornerRadius), so the board is kind to hands, panels and the fab's router.

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: outline, visit 2, the PCB editor from 2026-10-14T02:42:17Z to 2026-10-14T02:42:19Z. Motion only: 0.0 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the outline, visit 2 clip, what the camera saw.

nine frames of outline, visit 2

current, visit 2

What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged

This clip filmed nothing usable: 8 of 8 sampled frames are one flat colour in the middle of the window (an unpainted or covered canvas). It is kept as evidence and left out of the video.

Clip: current, visit 2, the PCB editor from 2026-10-14T02:42:27Z to 2026-10-14T02:42:29Z. Motion only: 0.0 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the current, visit 2 clip, what the camera saw.

nine frames of current, visit 2

The AI's drawing: R11 v5 matched 0.1 mm filled-copper current screen; computed result, not hardware qualification.

R11 v5 matched 0.1 mm filled-copper current screen; computed result, not hardware qualification.

thermal, visit 2

What this step does: copper and vias at every hot tab against the rise budget; then the AI's own temperature rise drawing and a walkthrough of the pours it judged

This clip filmed nothing usable: rejected by the AI: Background native editor canvas was blank; raw diagnostic retained and excluded from the final edit.. It is kept as evidence and left out of the video.

Clip: thermal, visit 2, the PCB editor from 2026-10-14T02:54:42Z to 2026-10-14T02:54:46Z. Motion only: 0.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the thermal, visit 2 clip, what the camera saw.

nine frames of thermal, visit 2

The AI's drawing: R11 v5 external Q1 sensitivity only. Assumed interface and airflow; fan-off exceeds original budget. Not resolved fin CFD or thermal acceptance.

R11 v5 external Q1 sensitivity only. Assumed interface and airflow; fan-off exceeds original budget. Not resolved fin CFD or thermal acceptance.

The AI's file: Q1 insulating interface screen: two documented pads do not substantiate prior 0.7 K/W assumption; thermal remains open thermal-2-analysis-report-1.md

The AI's drawing: Q1 insulating joint sensitivity; reference conditions only, no thermal acceptance

Q1 insulating joint sensitivity; reference conditions only, no thermal acceptance

The AI's file: Q1 full heat-path sensitivity: prototype assumptions, thermal qualification still open thermal-2-review-3.md

test-plan, visit 2

What this step does: Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.

Clip: test-plan, visit 2, the PCB editor from 2026-10-15T16:59:36Z to 2026-10-15T16:59:40Z. Motion only: 0.1 min of real time, 2 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the test-plan, visit 2 clip, what the camera saw.

nine frames of test-plan, visit 2

Screenshot: the board when test-plan, visit 2 ended.

the board when test-plan, visit 2 ended

placement, visit 3

What this step does: place the parts for routability, current and heat; the binary packs, checks courtyards and lands moves; reserve visible space for connector labels and the two-sided service silkscreen; the switch-node check refuses switch copper under another part or a switch loop longer than the spec allows, and sends the AI back here

Clip: placement, visit 3, the PCB editor from 2026-10-15T16:59:52Z to 2026-10-15T17:03:05Z. Motion only: 3.2 min of real time, 10 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the placement, visit 3 clip, what the camera saw.

nine frames of placement, visit 3

Screenshot: the board when placement, visit 3 ended.

the board when placement, visit 3 ended

routing, visit 3

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

Clip: routing, visit 3, the PCB editor from 2026-10-15T17:04:26Z to 2026-10-15T17:05:59Z. Motion only: 1.5 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the routing, visit 3 clip, what the camera saw.

nine frames of routing, visit 3

The AI's file: Unadopted PH sensor: native electrical checks passed; housing interference under correction; fan harness and thermal gates open routing-3-engineering-review-0.md

The AI's file: User-requested harness BOM and build/service requirements; unresolved tooling and component assets explicitly tracked routing-3-review-document-1.md

The AI's file: Moving-video shot log: actual recorded review versus unrecorded edits; no burned captions routing-3-review-document-2.md

routing, visit 5

What this step does: route to 100 percent with the spec's rules, gate with KiCad's DRC, land as undo steps; the AI takes it with take route=ai

Why the AI came back here: Board11 native placement verified; short switch node and relocated fan connector retained while copper density fixes are rechecked

This clip filmed nothing usable: rejected by the AI: Automatic capture used AdomLapper despite remote-only recording preference and has no Adom TTS. Exclude from final video; remote narrated fan-clearance clip is the reviewed process footage.. It is kept as evidence and left out of the video.

Clip: routing, visit 5, the PCB editor from 2026-10-16T22:49:39Z to 2026-10-16T22:49:50Z. Motion only: 0.2 min of real time, 4 s of it had something moving; the clock in the corner is the real elapsed time.

Contact sheet: nine frames spread through the routing, visit 5 clip, what the camera saw.

nine frames of routing, visit 5

Plan usage, the second cost line

Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.

Provider Limit At start At end Used by this run
antigravity 3p 5h 0.00 % 0.00 % 0.00 %
antigravity 3p week 0.00 % 0.00 % 0.00 %
antigravity 5h 2.62 % 6.59 % 3.98 %
antigravity week 7.60 % 9.43 % 1.83 %
claude 5h 2.00 % 15.00 % 52.00 %
claude Fable 2.00 % 3.00 % 10.00 %
claude week 41.00 % 46.00 % 86.00 %
codex week 14.00 % 9.00 % 52.00 %

The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.

Google Antigravity: tokens, quota and cost

436 model calls: 1746730 fresh input, 59588849 cached input and 260964 output tokens. The run used 1.83 % of the weekly limit, about $0.84 of a $199.99/month plan.

Step Calls Fresh input Cached input Output
current 436 1746730 59588849 260964

Token counts are the difference of Antigravity's own per-call records (its conversation files) between step snapshots; exact when nothing else used Antigravity during the run.

Given back

0 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user.

Adom processes PRs within minutes during business hours: a non-stop PR intake runs all day.