main
John Lauer Add checked thermal copper and three diode vias with recorded native edits 04a7e28

Remaining AIFlow capture plan

Target final film: 4–5 minutes. Record the original actions; retain raw takes, trim waits and label speed changes. Historical missing actions may only be shown as labeled reviews/replays. No manufactured pass screens.

Step Required clip
thermal-vias Show accepted copper regions and actual via arrays landing; preserve count and net evidence.
pours Show actual final fills on both copper faces, with measured area and any ground-area tradeoff.
outline Record any required corner changes and final molecule outline check.
current Film the same-input current-density screen and its remaining or resolved bottlenecks.
thermal Film the actual cooling assembly model and thermal boundary assumptions; distinguish simulated from measured temperatures.
fields Record the verified two-layer viewer, current and heat-flow views with readable scales.
nets Record highlighted power, return, Kelvin and USB paths using exact Zoom to Selected Objects action.
silkscreen Record actual contact/reference/value additions and clearance corrections on both faces.
3d Native final assembly review plus separately labeled smooth GLB render after copper/material checks.
finish Show AIFlow acceptance result and unresolved physical qualification items honestly.
export Show generated Gerber, drill, BOM and CPL checks and the exact released or prototype-only package status.

Each clip is reviewed and published as its step completes. Physical calibration, fan-stall shutdown and thermal testing require real hardware footage; software simulation is labeled separately.