Probe ground compatibility correction
User review caught a medium probe pin inserted into a large corner MP1. Prior all-six-pass evidence is invalid. Four large mounting pins must remain large for scaffold use; the probe must use a separate free medium GND contact. Native scan also incorrectly treated J10 (NTC connector) and J11 (SWD header) as machine contacts based on drill size. These are excluded by the correction. J7 is the existing medium GND candidate; reach and collision revalidation remain required.
Corrected plan
The rebuilt tool rejects MP1/MP2 (large pins), J10 (JST PH) and J11 (SWD) even when given the old access cache. It also rejects collision replay of the old MP1 sequence. The plan now uses J7, an existing free MachineContactMedium on GND; all four large scaffold pins remain unchanged. Compilation passes for 24 touches. The nominal collision run reports 17,504 poses, zero collision episodes, 771 tether solves and zero snags. Margins report J7 pincer clearance 19.12 mm. Coverage FAILS: J1 wired riser lies dx=-2, dy=-4 mm from J7, inside the required pincer open-jaw clearance (5.5 mm along Y / 3.3 mm across X). No probing pass is claimed. These are planning assumptions, not physical qualification.
Source fixes: adom/adom-aiflow-probing commits 54fe20f54d9325feb6a3e6db7b9892b4a80324d3 and b21343414d547ab005e9e8937612f76a2379e656. AIFlow skill commit 3df052dcd7177da77d64b967f8eb9b922266d411. Shared package release / Windows runtime deployment remains tracked at https://wiki.adom.inc/adom/adom-aiflow-probing/issues/4 . Old remote replay has been paused.
Both ledgers now record the return: probing flow coverage → board flow; main AIFlow routing → placement. Next: relocate J7 or the adjacent wired contact, reroute, regenerate geometry and re-run native and probing gates. Do not accept or waive this clearance gap.
# Probe ground compatibility correction
User review caught a medium probe pin inserted into a large corner MP1. Prior all-six-pass evidence is invalid. Four large mounting pins must remain large for scaffold use; the probe must use a separate free medium GND contact. Native scan also incorrectly treated J10 (NTC connector) and J11 (SWD header) as machine contacts based on drill size. These are excluded by the correction. J7 is the existing medium GND candidate; reach and collision revalidation remain required.
## Corrected plan
The rebuilt tool rejects MP1/MP2 (large pins), J10 (JST PH) and J11 (SWD) even when given the old access cache. It also rejects collision replay of the old MP1 sequence. The plan now uses J7, an existing free MachineContactMedium on GND; all four large scaffold pins remain unchanged. Compilation passes for 24 touches. The nominal collision run reports 17,504 poses, zero collision episodes, 771 tether solves and zero snags. Margins report J7 pincer clearance 19.12 mm. Coverage FAILS: J1 wired riser lies dx=-2, dy=-4 mm from J7, inside the required pincer open-jaw clearance (5.5 mm along Y / 3.3 mm across X). No probing pass is claimed. These are planning assumptions, not physical qualification.
Source fixes: adom/adom-aiflow-probing commits 54fe20f54d9325feb6a3e6db7b9892b4a80324d3 and b21343414d547ab005e9e8937612f76a2379e656. AIFlow skill commit 3df052dcd7177da77d64b967f8eb9b922266d411. Shared package release / Windows runtime deployment remains tracked at https://wiki.adom.inc/adom/adom-aiflow-probing/issues/4 . Old remote replay has been paused.
Both ledgers now record the return: probing flow coverage → board flow; main AIFlow routing → placement. Next: relocate J7 or the adjacent wired contact, reroute, regenerate geometry and re-run native and probing gates. Do not accept or waive this clearance gap.