main
John Lauer Record rejected thermal-via candidates and preserve clean accepted board beaf140
OK: heatsink via plan (2 vias): aiflow/run/plan-thermal-vias.json
  D1    LOAD_POS target 10  existing  4  planned  0  (room for 4 of 10 vias within 3 mm of D1 and inside both planned LOAD_POS copper regions: review local copper and cooling; native refill/connectivity still required)
  Q1    LOAD_POS target 16  existing  0  planned  0  (room for 0 of 16 vias within 3 mm of Q1 and inside both planned LOAD_POS copper regions: review local copper and cooling; native refill/connectivity still required)
  RSH1  SHUNT_P target  6  existing  0  planned  2  (room for 2 of 6 vias within 3 mm of RSH1 and inside both planned SHUNT_P copper regions: review local copper and cooling; native refill/connectivity still required)
Hint: Review it with the human in one line per part, then `thermal-vias land`. A part with a note needs your call: pour its net on the other layer, move a neighbour, or `--ack REF --why`.