main
John Lauer Adopt DRC-clean v85 and passing exact-board current screen; retain open cooling validation and reviewed build clips a897f04

AIFlow 0.1.85; isolated Fields source aab6429a0d027a732ea266c2e41a9aad20b21fca (PR10 stacked on PR9 and dependencies); native KiCad 10.0.5 / KiCad Bridge 1.0.55 / AB 2.1.173; Windows desktop, Linux caller. Latest Fields main observed at 11aae76645232c6b1665e9d2a89741c206c224a2, published 0.7.5; no shared runtime replaced. Current heatsinks-and-signals.md still explicitly excludes package lids, fins, off-board overhang and transient response.

Related concrete package-heat case: the two-layer Adom electronic load now passes native DRC (0 errors/warnings/opens) and all six same-input 0.1 mm current screens. Q1 is a horizontal TO-220 IXTP15N50L2, intended to lose heat through its case/TIM to a supported external fan-cooled sink. Existing hot.Q1 injects its conservative 5.5 W through the PCB terminal region. The board-only report gives Q1 riseC 590.2 / riseMovingC 519.7. AIFlow correctly refuses thermal acceptance; this is not a credible operating-temperature prediction for the proposed cooled assembly.

Please extend the model contract for an explicit package heat path rather than encouraging a fictitious board-face conducting block or omitting Q1 heat. Proposed requirements: separate junction/case/board nodes and reported temperatures; package-to-case and interface resistance with source/provenance; justified board/lead coupling rather than invented heat partition; external sink transfer tied to its documented airflow condition; energy balance and residual checks; reject unsupported geometry/unknown coupling; distinguish steady powered states from fan-off safe states and bounded fault transients. Do not waive still-air results just because tach pulses exist. RPM does not prove airflow, and the existing 5000 RPM threshold does not establish the 400 LFM catalog scenario.

A separate series-network sensitivity and actual fan pressure/flow review are retained as unqualified engineering studies, not substituted for Fields evidence. The board/sink/interface/duct design and physical stall/blocked-inlet/temperature tests remain open. Requesting owner review of the model extension; no threshold change or acceptance override is proposed.

Project: https://wiki.adom.inc/adom/adom-custom-electronic-load Current checkpoint and report are being published there. Existing issue #8 is the closest model-contract discussion, so this is a follow-up rather than a duplicate issue.